You are on page 1of 25
RHD SCHEDULE OF RATES 2019 ROADS & HIGHWAYS DEPARTMENT AUGUST 2019 Declaration RHD Schedule of Rates 2019 (For Road and Bridge Works) that has been recommended by the Committee, (formed vide memo no- 878-CE, dated 28/11/2017) is hereby authenticated and endorsed by the undersigned for official use in Roads and Highways Department (RHD) with effect from 19 August 2019. ber Ebne Alam Hasat Chief Engineer Roads and Highways Department Sarak Bhaban, Tejgaon, Dhaka. Foreword ‘The Roads and Highways Department under the Ministry of Road Transport ‘and Bridges Is pleased to publish the RHD Schedule of Rates 2019 for Road and Bridge Works. The last publication of RHD Schedule of Rates was in July 2018 and after that there is no significant change in prices of materials, labors and equipments. By this time National Board of Revenue (NBR) has changed the VAT & IT rate and RHD has considered the changes in contractor's profit. Thus RHD needs to update the RHD Schedule of Rates July 2018. | would also take this opportunity to recognize the valuable contribution made by all the members of the Committee led by the Additional Chief Engineer, RHD, Technical Services Wing which was formed to prepare/upgrade the Schedule of Rates. | wish that RHD Schedule of Rates 2019 will be useful for the works of Roads and Bridges in Roads and Highways Department. The "RHO Schedule of Rates 2019 (For Road and Bridge Works)" shall be effective from 19 August, 2019 bre 3 l{a0r Ebne Alam Hasan’ Chief Engineer Roads and Highways Department Sarak Bhaban, Tejgaon, Dhaka Preface ‘The RHD Schedule of Rates 2019 (For Road and Bridge Works) is the revised edition of the RHD Schedule of Rates 2018. It is logical and necessary to update the schedule of rates in the light of prevailing market prices. The information of prices of materials, labors and equipments are collected from different field zones of RHD, Bangladesh Bureau of Statistics (BBS) and other sources and compared with other organization like PWD, LGED ete. It was marked that there was no significant change of market price of materials, labors and equipments in comparison with the market price used in RHD Schedule of Rates 2018. | convey my deep appreciation and heartfelt thanks to all the members of the committee on Schedule of Rates for their sincere and meticulous efforts in finalizing the same. It is quite possible that, despite our best efforts, unintended errors or inaccuracies could still persist in the revised edition, In that case, the users are humbly requested to bring those errors and inaccuracies to our notice for Necessary measure. 4 \ orl?) (Md, Abdul Wahid) Additional Chief Engineer (C.C), RHD Technical Services Wing, Alenbari, Tejgaon. Dhaka and Chairman, Committee for RHD Schedule of Rates 2019. Schedule of Rates 2019 (For Road and Bridge Works) Contents Page DIVISION 1 : General & Site Facilities 05 DIVISION 2: Earthwork 06 DIVISION 3 : Pavement works 07 -09 DIVISION 4 : Foundation works 10 -12 DIVISION 5 : Structures: 13-15 DIVISION 6: Incidental 16-17 Annexure-I ‘ables of works 19-21 Annexure-II ; Rates of Basic Items 22-24 Division 1 - General & Site Facilities (All Prices in Taka) Unit | Rate(Tk) | Raie(Tk.) | Rate (Tk) Rate (Tk) | Rate (Tk) 1 | 01/01/01} Maintenance and Protection of Traffic [Lump Sum | 144,431.00 | 144,042.00 | 144,431.00 | 144,042.00 144,431.00] 2 |01/01/02 | Maintain Temp. Structures & Equipment for the Maintenance and day. 2.218.00| 2,105.00! 2,218.00, 2,106.00) 2,218.00 Protection of Tac 3/01/0201 | Supply, Erect and Remove Field tho x Enger, Lump Sun| 254,990.00] 254 90.0 [25420000 254980.00| 254030.00 4/01/0202 | Maintenance, Staffing, Security and Cleaning ofthe Fed tee ont» | sozaa.00| 5029300] sozs200| Sozs00) so233.00 forthe Engrest 5 [0102108] Provision of OficeEqupmentard | Yon | 768.00] 786800] 7.86800/ 788800] 728800 Consumables @ [ou02I0e | Provision, Maintenance and Removal of Sign Boards Lump Sum} 9,042.00] 9042.00] 9.04200, 9,042.00] 9,042.00 7 | O12i06 | Provision and ainenance of Suvey Equaret mont) | s1700| 21700] ei700| 1700) e170] 8 [ou0207 | Pragess Photorechs Mon | _1aze00| 192200 | 02200 | 102200] 102200] @ [OUO90" | Provide and Remove Ste Laboratory ‘Equipment |Lump Sum | 38,070.00 | 338,070.00 | 339,070.00 | 339,070.00 | 330,070.00 10 [010302 | Nana Ste Laboratory ony | T2650] 7.66600) 76500, 78500] 7.85800 11 [011309 | Spader Addtonal Tests Pro. Sum 5 . a : 12|0110#01 | Saloon ar 12000c Capacity Month | 119,202.00] 118,302.00 | 119,802.00 1190200) 119:802.00 13}01/04/02 | Pick- up (Double Cab) ‘Month | 169,535.00 | 169,535.00 | 169,535.00 169,535.00 | 169,535.00] +4[0040s | Fourwheel Orve Vehicle Min 6 seats | Month [295,116.00] 265,116.00 [28,116 00 295,116 00| 295,116.00 15 [01040 | notor Cyl 12500 ton. | 551.00| 565100] Se6100| Sas1.00| 5651.00 16011405 | Noior Boat min Sm engh onin | 16188900] 1685200] 1688900| 1eae@00) 1688900] 17a110#05 | Provson, Opeaton and Maintenance Ania Vee Henin | 166395.00] 185295.00| 166:8500 | 16638500) 16629500 18[01%0#07 | Provson, Qperaton and Mantenance yes a Ta Noni | 150,698.00 | 150,698.00 | 150,688.00 | 150,826.00) 150,696.00 Rate for this em shall be anajsen as per actual ruta Unit_[ Ratocti) | Rate (Tk) | Rater) | Rate (TK) | Rate) 1 [oarov01 | Clearing and Grubeing sqmeve | 3500] s100| 58.00] 51.00/50 2 (020207 | "Roadway Excavation i Unsuitable Sol (wth romaval fom sto)" cumere | 20500] 20300} 208.00] 208.00/ 208.00] leanne [Roadway Excavatonin Sutable Sal_| cumewe | 14400[ t4400] 14400[ 14100] 14400 (020202 | Roadway Excavation n Exiting Pavoment (nat reinforced concreto) _|cumera | 107.00| 10100] _10700| _101.00| 07.00 [5 [o2102/04 | Roadway Excavation n Existing lntorcad Concrete Pavement cumere | 1.41400] 137800] 14t400| 17900| 1,414.00] [5 [020205 | Deduction o Yate of Sutable Son Focovere trom Exising Road cumere | _21000| 190.00] _17500| _17500| 20000] 7 [oatoane | Deducton of Vaue of Materials Recovered rom exsing Rosd Pavement_|cumere | 2.270.00| 244500] 2.119.00| 1,908.00| 2,170.00 fe jo2iowor | Channel Excavation i Unsultable Matera cumeve | 21100] 19800} aria] 198.00| 211.00] 2 foziosng [Channel Excavatonin Sutable Material [eumee | 21100| 19800] 211,00] 19800| 211.00 10 [025.01 | Excavation and BackilorStuctres [cumere | 447.00] 42400[ 47.00| 42400] 447.00 1 loasime | Concrete Backilior Sructwres | eumera | 1259800| 17.0800] 1205000] 11,49000| 12,087.09] 12 [02105003 | Sand Backlit for Siucures ‘cumere | 1,30800| 1.25000 | 1.25200 | 1,36500| 1,201 00] 13 o20601fa] Entarkmen Filton Excavalononste eumetre | 14400 14100] 14400| 141.00] 14400 14 [o210807(0] Ebanenent Fl ron Excavator Bora atin th agro ay cumore | 217.00| 2120] 2700 a1200|_—_as7.o| 75 oa | Embankenent rom borrow ply contractors Arranged land cumere | 41000| 26300} 6600] s8400| 29700] 16 [02106003 | Sand Backlit io Swan cumere | 79100] 7e800| reioa[ 85600] 634.00] 17 [oao7!01 [Proparaton of Subgrade oommDephh (sq.moue | 2400| 2400] 2400] 2400] 24.00] 12 [027102 [Preparation of Subgrade 450mm depthisq. metre | 40.00] 99.00] 4000] 29.00] 4000] 12 [o2na01 [Improved Subyeade ‘cumere | 104900] 985.00] 10s700[ 1,097.00] _ 1,099.0] 2020801 | Dsmaniing Busting Stuctre Including spose of spol and backing Lump sum 21 0210802 | Dsmanirg Pordons of Exising Srucure Including tockpling of materials. Lump Sum 22 [censis(| Deduction of the Value ct Recovered ators rom Strats Lum Sum 23 |c20803{5] Deduction ofthe Value at Recovered Materials from Suuoures Lump Sum [24 | G2NO10T | Constucion of Sol Earthen Shoulders [cumeue | 63600] _e0100| _Te7.00] _@o7.00| 64000 2s [o2ii201 | Subgrade Drains iin Mere | 38s00| 67.00[ 4oa00| 37200] 28000] * Rate for this item shall be analysed as per actual requvement Unit Rate (Tk) | Rate (Tk) Rate (Tk) | Rate (Tk) 1 |osionot | Scary, Mixand Recompact Exsing Pavement andor Shoulder sameve | 3800] 700| 3800] 37.00 3800] 2 [os.ou0e | Repair of Potholes on he Existing Pavement camere | 21,45200| 20,41800| 21,451.00] 20,60900| 20351400] 3 [oananra [Sub Base cumere | 840000] 577600] S07400| 476600| 5,174.00] + [oaneor | Sub Base (uth Pave) cumete | 558600] 595800] 626200] 495000] 5359.00] 5 [030301\a) | Aggregate Base Type! cumete | 8,832.00| 7,926.00} 8.38400] 7,720.00| 8,273.00] 6 |0310301(b) | Aggregate Base Type | (with Paver) | cu metre 9,020.00| 8,118.00] 8572.00] 7,912.00| 6,461.00] 7 [oaatBal [Aggregate Base Type cumere | 699200] 67800] 685400] 5.10400] 5682.00] a [oa030op) | Aggregate Base Type (win Pavey) | eumeve | —6,12000/ 657000) 5.74200) 5.36600) 5850.00 9 |0306(01/a) | Bituminous Prime Coat (Plant Placed) | sq. metre 114.00 116.00} 117.00 120.00 113.00] 10] 030601(b) | Bituminous Prime Coat (hand placed) | sq mete 109.00 110.00 | 112.00 114.00 107.00] 11 030701(a) | Bituminous Tack Coat (Plant Work) | sq. mete 51,00 51.00) 53.00 54.00 50.00} 72 ono7aT | Biurinous Tack Goat {Labour intensive work) sqmere | 4500] 4600] 4700/4800] 4400 15 |a5i080" [Primer seal sq.meve | 11300[ 1700] 11500| 11400| 11209 14 Jona Single Btuminous Surlaoe Teament ‘14mm nominal size aggregate ‘Sq Meter, 232.00 238.00 216.00 221.00) 229.00 (Machine Method} (Bitumen Grade 80/100) 15 | c00901(0| Single Bruminous Sule Treatment 14mm nominal size aggregate ‘Sq Meter 235.00 241.00 219.00 (224.00 232.00 (Machine Method) (Bitumen Grade 6070) 16 0302 | Double Bituminous Surface “heament.20mm nominal size SaMeter | 42300] 43500] 39400] 4o4oo] 417.0] aggregate foltwed by 10mm (Machine Method) (Bitumen Grade 80/100) 17030942) | Double Bituminous Surface “rearnen.20mm nominal size Squeter | 42800] 44000] 40000) 410.00] 42800 aggregate fllwed by 10mm (tachine Method) (Bitumen Grade 60/70) 16 030342) | Double Siuminous Surface Teament-14nem nomial ize SqMeer | 26600] s7e.00] 34200] 51.00] 3400] ‘aggregate flawed by 10mm (Machine Method) (Bitumen Grade 80/100), s}Departm 18 osna029) Double Bituminous Surface Treatment-14mm nominal size Sq Meter aggregate followed by 10mm (Machine Method) (Bitumen Grade 60/70) 348 09 333.00 20 caro) Dense Biuminous Surfacing Base Course (Plant Method} (Bitumen | cumeter Grade 80/100) 2861.00 21,853.00 22,841.00 22,147.00 21,850.00 2 or0016) Dense Bituminous Surfacing Base Course (Pant Method) (Bitumen Grade 60/70) cumeter 23,144.00 22,186 04) 23,124.00 22,430.00 22,198.00 22 loxiovza) Dene Bituminous Surfacing Wearng Course (Pant Method) (Bitumen Grade 80'100) cumeter 2397299 2298441 2401066, 23354.87 22,943.29 2 loxiotat) Dense Biuminous Surfacing - Wearing Course (Plant Method) (Bitumen Grade 6070), cu meter 2425.00 23,836.00) 24,362.00, 2707.00 23,295 09] 24) og tor remix Bituminous Carpeting cumetre 2084.00 19,648.00 2066.00 19,776.00] 19.31.00 FE oaniame 12 mm Compacted Prem Bituminous Seal Coat sq.mete 185.00] 176.09) 188.00 160.00] 171.09) 6 oa1203 15mm Compacted Premix Bituminous Seal Coat sq. mete 207.00 21700) 228.00 221.00 21700 ar srg) 125 mm Thick Brick on End | Edging (1st Class)" Lin. Metre 139.00] 21800 185.00 172.00] 189.00 2 loxra0it) 125 mm Thick Brick on End Edging (Machine Made)” Lin. Metre 233.00 24900] 219.00 205.00 223.00] losratz) ‘gle Layer Brick Flat Sling Ve ‘75mm thick compacted sand cushion (st Cass) sq. metre 555.00, 59200] 522.00 496.00 535.09] 30) oxranat) Single Layer Bick Flat Sling Vic 7mm fick compacted sand cushion (Nechine Made) 4. ete 636.00 67300] 604.00 577.00 616.00 31 xiang) Hering Bond Brick Pavement ic 12mm sand cushion (istGlass) _|sq, meve 780.00) 844.00] 726.00 673.00 10.00] 32) ovata) Hering Bond Brick Pavementic ‘2mm sand cushion (Machine Made) _|sq. mete 915.00 97900] 861.00 £08.00 875.00] 3 oraz) Dry Lean Conorete Class-20 (Concrete Mitre). ccumeter 13961.00 12,828.00 13,482.00 12802.00 13,454.00 34) loxranzi) Dry Lean Concrete lass-20 (Batching Plant without Concrete Paver cu meter 1548.00 14,357.00 14870.00 14:290.00 1484200 (All Prices in Taka) Unit Rate (Tk) Fate (Tk) Rate (Tk) ‘ate 7) Rate (Tk) 35) 3n4024¢) Dry Lean Concrete Class-20 (Batching Pant with Concrete Paver cumeter 15837.00 14,558.00 151088.00 14,431.00 150090.00 36 0315014) ‘Cement Concrete Pavement (Concrete (ass-25) (Concrete Moture), cumeter 16513.00 1851.00 16,0400, 15,481.00 16042.00, a7 O35 OK) (Cement Concrete Pavement (Concrete Class-25) (Batching tant without Concrete Paver cu meter 17,982.00 16,962.00 17.45400 18,851.00 17,412.00) 8 ons) (Cement Concrete Paverent (Concrete Ciass-25) Batching lant with Concrete Paver) cu meter 18,222.00 17,314.00 17,7940 17,204.00 17,752.00) 29) 03150%6) Precast ACC Pavement slab (Concrete (ass. 25) (Batching Plant) cu meter 22,035.00 21,100.00, 21,582.00 20,983.00 21,536.00 40) ons.0qa) (Cement Concrete Pavement (Concrete (Ciass-30) (Concrete Mitre). cu meter 17,375.00 16,385.00 16:982.00 16,270.00 16,889.00 at 0315020) (Cement Conte Pavement (Canoe Class 30) Batching Pat without | Concrete Paver). cu meter 18,634.00 1774400 48,191.00 17,627.00 18,148.00] 22 0318020) [Cement Concete Pavement (Concrete Gias-30)Batcing Plant wth Concrete Paver) cumeter 18,990.00 18,097.00 18547.00 17,963.00 18,504.00) 6 0315020) Precast ROC Pavement slab (Concrete (2ass-30) (Batching Pian) cumeter 2211.00 21,944.00 2442.00 21,823.00 22:398.00| aa] 0375033) [Cement Concrete Pavement (Concrete ass. 36) (Concrete Miture}, cumeter 17,600.00 16877.00 17.47300 18,582.00 17,128.00 0375035) [Cement Concrete Pavement (Concrete ‘Cass. 35) (Batching Piant vithout Concrete Paver cu meter 18.16.00 17,958.00 18,388.00 17,899.00 18,342.00 4 0316036) ‘Cement Conzete Pavement (Concrete ‘Cass. 35) (Batching Piant wit (Concrete Pave cu meter 19,171.00 18,508.00 1874400 18,195.00 18,638.00) a7] 0375056) Precast ROG Pavement sab (Concrete Class-35) (Batching Plant) cumeter 23,417.00) 2237900 23,110.00 22,258.00 2839.0] 48 031503) ‘Cement Concrete Pavement (Concrete (Cass-40) (Batching Pian witout Concrete Paver cu meter 19,054.00 18,193.00 18,627.00 18,079.00 18,582.00) 49) 031503") (Cement Concrete Pavement (Concrete Class-40) (Batching Plant with Concrete Paver) cumeter 19.410.00 1854800 18,9830, 18,434.00 18,937.00) (All Prices in Take) ‘Unit_—_[Rato(Tky | Rate(TA) | Aato(TR) | Rato(Tk) | Rate(TR) 1 losoro1(a) | Bored CastinPiace Piles (ia 400mm) | Lin. Metre] 2464.00] 2.32800| 242800) 280800| 298300 [2 loatioi(o| Bored Castin Pace Pies [ia 600mm) |Lin.Mere| $592.00/ 527800] 6,50800| 6.24600| 6.43800] 3 [ow01i01(2) Bored pile cast in pace piles (dia 750 nm) Lin. Mate} 8818.00| 8.39200) 2,687.00 828000] 8580.00 + lovato} [Bored castin place Piles (ia 900mm) |Lin. metre] 13,129.00] 1242600] 12,94200| 1235¢00] 12,787.00 5 [o401/01( Bored ast in Place Pils (a 1000my [Lin. Metre | 15,406.00 ]14560.00 | 15,17400| 1445800) 1498300 6 [oaiot1¢ | Bored cast in Place Piles (fa 1200mm) Lin. Mewe [22,813.00 |a1.s4s.00 | 22,470.00] 21,411.00 | 22,187.00 7 [oaiot1(q Bored castin Place Piles (ia 1500mm)|Lin. Metre | 40.67.00] 38.408.00| 40,055.00] 38,168.00 | 39,550.00 [8 (0110804 |Fagh Viel Detomed Stee! Reinforcing Bars Tome |92,710.00) 9291800] 94,008.00 | 93,564.00 | 92,064.00 '9 [041/05] Permanent steel Casing (6mm tick «6a 400mm) Lin Met} 8.00100 | 8001.00) 8,001.00 8001.00] 001.00 10 o401/05() Permanent steel casing (nm thick 600mm) Lin Metre} 11,625.00] 11,525.00) 11,625.00 11,6250] 1,625.00 11 PADUNSE) Pemanersiesl casing nm NOK evel 1447t.00| 1447100| 1447L.00| 1447100] 144rt.oo ia7S0nm) in. Meve| 1471.00] 14.471.00| 14, 144 \ 12 [oa016(aPermanert see casing (10mm ; fic, 600mm do) Lin, Metre} 18,688.00 | 18,583.00] 18,683.00 18,688.00) 18,688.00 13 i0105(e)/ Permanent steel casing (10mm ; tick, 7500m da) Lin. mere 2815.00] 23.315.00| 23:316.00 | 23.8160) 23,1500 ‘Joan [Pemanentsetcasng WOmmick, || | oo) oraoaoo! 27aen0n| avaagon| 270000 00mm da) oe bi 15 |04i0105(q),Permanent steel casing (10 mm , , aoOoaan Lin. Mete} 30867.00| 30,867.00) 30,887.00 30,687.00) 30.87.00 16 [04101105(n] Permanent steal casing (10 mm tick, Lin. mete] 3701200] 7.01200) 37,01200| 3701200) 37,012.00 200mm dia) 17 [04010549 | Permanent stee casing (10 mm tick, eee Lin. Metre} 48,022.00] 46,022.00) 46,022.00 46.02200 | 4602200 18 [040210%(a) Driven Precast Pies (a) 300x300mm | Lin. Mee] 2239.00] 2.19800] 221200] 2.12200] 2.19000 19 [0402011] Driven Precast Pes (b)350x350mm _|Lin. Netre| 2847.00] 2,705.00] 2811.00] 2,694.00] 2.7.00 20 J0«02i01( Driven Pre-ast Pie (c) 400x400mm Lin. Metre] 346442] 3.28128] 3.41725] 9.26282] 3578.28 5 and) hi unt | Ratocrk) | ator) | Rato(Tk) | Rato(Tk) | Rate (TK) 21 |040202 | Driven Precast Pict Piles Lin Met] 76200] 75200] 76200) 75200] 762.09 22 0402/04 | High Yield Reinforcement Bars ‘Tore | 92,710.00] 92,918.00| 94,004.00 93,564.00 | 92,064.00 23 040301 | King Post Lin Mere] g2aco| —saron| 7000/7700] 81409] 2404/09/02 | Raker Piles (including Te Bars) Lin. Mere] 1.16800] 1,178.00] 1.08200) 1,07800| 1,160.09] 25 |ovoa03 | Precast Planks including Reinforcement Ste) ‘sqMetre| 3.38400] 3.41000] 26100) 325200] 3361.09] 26 040905 | High Yield Deformed Steel Reinforcing Barsto King Postsand Raker Pies | T™® | 8271000] s2et6c0| s4co400 | 93:58400| 2206409 27 |041040%(a)| Load Test on Cas n Place Working le (Prool Loag obs epee Number | 99,486 00] 98,509.00 ] 99,486.00 | 97,608.00 | 100,146.00] in 80Q}60 Ton 23 oun4o%()| Load test on castin place pes (For 10 Ton) Number |174847.00| 168,985.00 174,847.00 171,189.00 | 176,166.00 1410400] Load Te 29 O01 Load Tel op cath a Number | 289,600.00) 289,880.00 | 299,600.00 | 294,275.00 | 302,237.00 {For 200 Tor) 30040402 | Load Test on Gast in Place Plot Pile {Proof had abe spectiedin Bog) | Number 7 Z . . 31040403 | Load Test on Plt Driven Pile Number : - . (Proo! load to be specitied inthe BoQ) 22040501 | Biumen Sip Layerta Concrete Pies | SqMete | 22200] 22500] 23200, 237.00| 21800 433 [040601] Driven Bulah Piles | Dimensions to be sted nBoO26-10rn) Lin Meve] 72400) 719.00] 72400, 71900| 724.00 34 [oxos0r(t [Driven Butlah Pile (150-175mm cia) [Lin Moire] 808.00] 801.00] 08.00 01.00 08.00 35 [oxo80%(e) [Driven Butlah Pile (175-200mm cia) __|Lin. Metre] 97500/ 967.00] 97500) 987.00 975.00 36 |ot060%|o) | Driven Butlah Pile (200-225mm cla)__|Lin Metre} 1,167.00) 1,186.00] 1,167.00) 1,156.00) 1,167.00 37 [o#07/01 | Cutting Edge (Wer Stoe) Ton |rroo72co) togse200] 110,147.00) 10362000] 1100240] 38 0407102 | Class-20 Concrete for RCC Well cum | 1487400] 14,773.00] 1474.00) 1477800] 14874.00| '39/0407708 | Concrete in Top"Botlom Plugging cum | 14,919.00} 13,920.00] 14,468.00 13,695.00 14.56.09] “Rate for his tom shall be analysed as por actual roguiroment (All Prices in Taka) Unit Rate (Tk) Rate (TK) Rate (Tk) Rate (TK) 40 losaTi08a) Labor for Wel Sinking (Sze 5000mmX10000mm) Depth Om-ém Metre 124,487.00 24,034.00 24,457.00 2403400 24,487.00 at (oao7i08(o) Labo for Well Sinking | (Size 5000mmX10000mm) Depth 6m-t2m Metre 37,497.00, 37,198.00, 37,497.00 37,195.00 37487.00 a2 [owa7io4{c) Labo for Well Sinking | (Sze 5000mmX1000mm) Depth 12m-t8m Metre 4241500 42,1140 42,418.00 42,1140 42,415.00 3 (o4o7i04a) Labo or Wel Sinking | (Sze 5000mmx10000mm) Depth 18m-24m Mere 53,874.00 53,517.00 5387400 53517.00 53,874.00 a losa7i0s(e) Labo for Well Sinking (ze 5000mmx10000mm) Depth Above 24m Metre 64.40.00 63,982.00, 6434000 63,982.00, 6440.00 45 losio704() Labo for Well Sinking | (Sze 4270mmx7340mm) Depth Om-ém Metre 16.581.00 16,296.00 18,581.00 16,298.00 16,581.00 36 [os07/08(q) Labo for Well Sinking (Sze 4270mm X 7840mm) Depth 6-12 Metre 25.50.00, 25,447 00, 5,650.00, 25,447.00 25,650.00, a7 losia7i08(ny abo for Well Sinking (Size 4270mmX7340mm) Deoth 12m-18m Metre 28.6530 28,457.00, 28,853.00, 28,457.00 28,653.00 a8 losoosty {bor for Wel Sinking | (Sze 4270mm X 7840mm) Depth 18m-24m Metre 3627200 36,033.00, 3627200 36,033.00, 3627200 49 losarioayy Labo for Wel Sinking | (Sze 4270mm X 7940) Death Above 24m Metre 4350800 48,259.00, 43508.00, 49,259.00 43508.00 50 osio705 Sand Filing cum 4,308.00 1,250.00 41,353.00 1,368.00 1.38.00] Bt oso7106 igh Steel Renforcement Bars Ton 93,966.00 94,173.00 9526000 94,820.00 95,320.00 on [Rato(Tey | Rato(Tky | AaterTR) | Rato(TK) | Aao(TH) 1 [osonor | Snole Layer ick atSoing [sa meve| 52800] 58600] 4950/4880) £0700 2 fo5:0102{a)| Gancete lass as Detaled on Fee ee x) | amare | 972500] sn600] 921400] sa7000] asi7m0 3 [050100 Concrete class-20 (Foundation) eee cumere | 14481.00] 1941400 | 1400800] 13,287.00 | 1387509 + [0501026 | Concrete dass -20 Verical member col pi, abuimen/ ing waclvert | comet | 16960.00| 1574800) 1648000 | 15,621.00 1645200 at.) (Concrete Mier) 5 [sow 0e) | Concrete dass. 20 (Grae crs Gide daphvam beam ete) cumete | 1940800) 18,14500 | 18e5000| 1eatea0| 1.90200 {Conezete Mier [050106)| Conarete dass. 20 (Desk sab de wale quardcur eo cumetre | 1728200) 1605200] 18,7300) 1892600) 1672500 (Concrete Mien) 7 [05:00 | Gonereteclass-20 al & pos) Coca camere |21201.0] 1972000] 20,7200| 1932800) 207140] & [O501100}6)| Concrete Class -25 (Foundation) E = amore | 1459500] 1860500 | 44,1850] 1242900] 14.1200 @ [oiowozi | Gancete dass 25 Verteal member Co) pec atutmentningvallcuvert | cumeve | 17047.00| 1591400] 16,608.00 | 15,708.00) 16.5800 ate) (Corres her) 1 osiov0e%y | Concrete dass- 25 (Grae, beam, cross grderandiaprram et) | cumete | 1987800] 18,487.00] 19.2%300| 1871.00) 19,2080] (Conte Mier ‘[osiov0eg) | Concrete dass 25 (ROGIOG Gomer dase: 25 (ACCC | cumare | 1788200| 1666600| 1741200] 1688000] 17.8700 12 |osiov02()| Concrete dass-20 (Deok la, side wal hee! qurdcur ete cumete | 1823200] 17,101.00] 17,7780) 18,981.00 | 17,751.00 (Concrete Mier) 7 [osr0TaeR | Concrete Gass 35 [Conarete Me) | cumeve [2871500] 27/65000| 2842500] 2754800 | 28,1980] 14 osm] Corre Gass —40 (Prestessoa eee camore | 29,16000] 2,121.00| 2887600| 2201500] 28.6440 78 |osiov09(@)| Concrete Glass as Detaled on Cee ee aan) | imate | 1050900] 1039900] 1048100| r04%800] 1056000 76 05]070995)| Concrete dass-20 (Foundafon) ee cumete | 1626400] 1521600] 1590500] 1808900] 1577700 17 [o5i0103(¢] Concrete dass -2 Verical member Col pi, abutment wing wakculvert | cumete | 16,72800| 1751600) 1824900| 1738000] 18,221.00 ete.) (ating Pan) (All Prices tn Taka) Thala | Syne | Khun | Ralohani si.) tem Mymerisagh) Zone | Basal | & | chatogam INo| Code Description. Unit | 6 Cumile Gopalganj | Rangpur | Zone Tom Zon» _| Zone wat [atta | ater) | AatocTi) | AatoTk) | Ratsr) 18) 080108 | Cree Geared Dachawean” | cum | 2116600 | 1990300] 2n6e700] 1977600] 2065900 20] Tt | engl cs 2 ah cumete | 2297800] 2176.00] 2250000] 21,35100] 2247200 FT Tee Bea em) | eumete | 1628600] 1529600] 1584700] 1510000] 1562100 22 O80] Conzete class -25 (Verical member cal pierabumentwing allaven | cumete | 1882700] 1769¢00| 1898800| 1757800) 1825300 et} (Bathing Plant Fee oe es eo carparmceny | cunete | 2141700 2n232c0| 20878c0| 2011600) anes200 21/510 Poa as chin pon) | umeve | 1958700] 181200] 1918800] 18.2600] 19,132.00 Fee a eer hae tatenweam | cumete | 1998600 18855c0| 195%200| 1878500) 1980800 Z| OETREID | Concrete Cass -6 (Bakng Pan) | comete |322200| 2829000] 2889500] 2817800) 28 70000] FO ea a ee cnig Pat Ts _ | oumete | 2965700] 2575200] 2922300] 20.4600] 29,151.00 75] 06202 _ | High Ved Reniwcerent Bars Toone [S120600] S146100) 9048700) e2,70900] BOBbT00 25 [0610209 _ | Wire Mesh Rerbreement Toone | 8848500 8408200) 6475400) @4,74200| €2,77800 20] 061a01 | Pestessing Wie or Sand Tonne 27088500 | 27858500] 27858500] 276 59500] 278 595.00 at [oscw0T | Modicaton wo Exetng Core | cumeve | 10,1080] 10,0200] 10,0900] 10 10200) 10,1200 Selesuee [Boe Scene WoHS | mare | ai7e0| arroo| ex7ao] 700] aren Se ee sa.meve | 20000] 20900] 28800) 20900 2200 34] 50804 | Resin Rep Moras G e E e : : 35] 060405 _ | Cement Mortar in Cracks Unwete| Toco; 6800] 7000] 6800] 7000 | 0610406 | Anchor and Tie Bas Tonne | 200800] 200800] 200800) 200900] 20900 37 [060501 | New and tended Bicknork cumete | aa9600| 925600] 67200] 8.09500] 8.55200 36) 061502 _| Bick Dcnage Layer cumere | sa0e00| 65400] 8511.00] 5.10500] 5.60800 39/050503_| Repacementof Defsive Exsingbrck | cumee | 1419800 1448800) 1978300] 1330200) 1893700 40) 06054 | Reining ofBxsing Bickwor Joints sq mebe | 62200] 61200] 6000] _et800/ _eascn| 41] °050506 | Sled Tie Bars andPatrss Paes | Tome : i 5 zi 7 22[050801 | Pretend Pehing Bsn Sincives| sq.moke| 56700 | 7700] 697.00] 57700] 697.0 431050701 | CavegeofBidge Sean ton Por S| Tome 44]'050702 | Fang ofbeangs for Unt Bridging | Number ™ ato for his item shal be analysod as par actual tnt [Rate (Tk) | ate Ty | Rater) | Rate) | Rate) 45 '0500708 | Suppl ard ng of Etstomere Beargs tor Compost Bisye Cnsrucion Number 7 ‘Asssonby ad salon FUntBrdgng_| Un. Mev z : 47 |"05I0705 | Instaiation of Steeork or a Composte Bridge Construction. J 48 FOBIT7OG | instalation of Stel Post and Barer | 1 au - 7 Parapet oRnroed Conse Dee Sad 49 / "050800 Expansion Joint complete as deaied nthe Drawings in the location Gesebaainte 80 (Update win | Ln Mate 12,@600| 12500] 139600) 13,8600] 18600 ew drawing 2014) 50 |050802_| Bridge Deck Joint Complee as detaled 7 ore bean Lin, mete 51050901 | Provision and Fixing of crainage to siryiures as detailed onthe ravings, | LUM® SUM g 52 [051001 [Embedmentof inserts and Fitings [Lump Sun] 53 05/120'(@)| Supply and instalation of Pot 5 bearings (Size-500XS00X72) ey 4 54 ]05/12"16) | Supaly andinsialtion of Pot ata 3 bearings {Size-5U0X450X72) 35 OBO‘ Supaly andinstalation of Pot bearings | Numiner (Size-400%300X72) 156 05202. | Supply and instalation of hock i 7 “Taansmission units Sa 57 051/30'%@)| Neoprene rubber bearing or Elastomeric 7 Ceara sopphei kt faite | Number | 7.24700} 1726500} 1983800] 1728800] 17,267.00 158 [0573070 Neoprene rutber bearing or Elastamerc Desing supp & tiny tinge. | Number | 2000800) 20,128.00 | 2259800] 2000.00] 20,030.00 59 087401 Double Single Baley Bridge o AcOW | in wot Cael cen ae eet | un-Mete| 878800} 876000] 3.79800] 376000] 3.78800 60 057407] Calender Hamiton Truss Bridge = Teed Sal aeeenir Lin. Metre! 1289700] 12,784.00] 1289700] 12,78400) 12,897.00 11 0571402(5) | Double Single Balley Bdge or Acow pa Oalandin Lin. ete] 2501.00] 2.56500] 2581.00 256600) 2,581.00 62 |0617402(0) Calender Hamiton Truss Bridge (Daan Lin. Met] 8.91600] 8,811.00] a91600 s.atto0] 8916.00 3 057501 _[Moniizaton orraling ype work et [Lin Mere| 2er200| 2ser00| Zeia00| 256700] 2s1200 64 [057601 [Oismanting otdeck sab hickress 7emm. | SqMete| 675700] 6.87500| 675700] 6.37500] 6,757.00 5 [0571602 | Stel Beam (W580 x 167) Lin. Metre] 11,90600] 11,298.00 | 11.43500| 1-287.00[ 17,307.00 “+ Tas ais spposle tr vent designe Expansion dont (Sto Seal Tos) oa approoa by Baye Managoront Wing, BHD ot Fabary 2018 * Rte fortis tem shall be analysed as por actual requrement Division 6 - Incidental (All Prices in Taka) a Khana] Rajshahi me Baril | & Ss eee ee canna ey Zone | Zone Unit [Rate | Rate) | Rate(TK) | Rate) | Pate TK) 1 | ost | Geouted Riprap Pavement sq.mire | 2895.00 2.47200 | 275200 | 238900 | 2,709.00 2 | osotae | Concrete Spe Protection sq mere | 1,709.00 1.62900 1,678.00 | 161400 | 1,857.00 3 | 080103 | Loose stone Riprap Protection cumere | 659000| 694500] 7.96200] 658800 | 783600 4 [os0104 | Concrete Gut Or cumeke [1688600 | 17,700.00] 1655000] 17,6290 | 1621.00, B | 080201 | Relnforoed Conorete Culver Pre Glass beding in. Mere| 598000 5,72400| seo700| 5.6s000 | 5891.00 & | oscat2 | Renorced Conrete Cuber Pipe Glass Being Lin were| 2er900| 271300| 2e7s00| a7src0 | 280700 ‘BOGE | Nenhcle (Darel obe sted be BOO) | Number - 5 zi : zi ‘950802 | Catch Basin (Diameter bbe sleedin he 800) Numer \ - @ | os0a13 | Concrete Side Dich/ Drain in Mere| z 10] 008104] Brick Headwal to Culvert Poe Pipe diameter'o be satedinthe BoQ) | Number = : 11] 05040 | Conwte Kerb (es etaiedon eaves) [in Mebe | = = > 1 HET arAiiRTTIMERSENEES! Vee | azo] vaeo| 11ei0| vw we 14| 050502 | Road Making -oed marking Pant |Sqiere | 45900| 49600| 49900] 43800 499.00 15 | 050506 | Retlecing oad Studs Number | 91700] 91700 1700 | s1700| 91700 16 | 050504 | Application of Balt Sawere | 12600] T2600] 12500] 12800 12600 17/ 050601 | Topsa cumere | 55300] 50900] soe00] «9100 | 54000 18| 08070 | Grass Sodding Squeve | 4200| 4000| 4200/4000] 4200 13| 050702 | Grass Turing Sqveve | #200] 00a] e200] a0] 200 23] 0880T | Guardia in. Mere[ 5 = 2i| 080807 | Concrete Monument Number : 5 Z2[ OBER | Canarte Post Number i 5 2 5 23) 06001 | Talc Suns Number | 665100) 545100 | 586100] 565100 | 588100 24{ OBO? | Sign Fost Naber | 3.14000 314000] 3.14000 | 3140.00 Zl oarvar | Rome srs Gummo croeevoure|| cum [161100 158500 | 1646400 | 1598600 | 15.1700 25| OST TE | Fond ern Teron Vay ya) 07800 | 107800 | 107EO0| 07860 | 1.0780 Zi] O6T2T } Geclexie Fier Fabric (as oeaed on the Oraings) Sqmere | 21700 | 21600| 21700| a1s00| 21700 23] OBAEAE | Fumisting and insteling WaesS (as etal on te cravings) Sqwere | 1.60000 1.58300 | 1.20500] 159600 | 1,598.00 23[061901(3)| Bulah Paling 160mm - 175mm) _ |Lin.Mete [1008200 | 9.90200 | 1008200 3902.00 10,032.00 Unit —[Rateqriy | Ratorrk) | Ratorrk) | RatocTa) | RaterTk) e haraoie) osiran hati loader tSmm—Aonm | Ln Meve | 760800 | r47e00 | 7e0400 | 7.47400 | 760400 Meblaaonter dedksebwpaingworkec. | SqNeve | 1.16800 | 1.14500 | 1.16800 | 1.14500 | 1,168.00, joss eee ute ol meg, OMe) Ne. | 228000 | 226900 | 2.0800 | 228600 | 2202.00, josieot Cone Kora Pot (A er ang No. | .0a.00 | 273300 | sat100 | evei0o | 9826.00 fairrore) ROC Falsdeg|én pos, rmx 200mm) | Un. mabe | 10,826.00 | 993400 | Ta25100 | _as2500 | 10,177.00 fsirrore ACC Pasig pos, 1SrmX tSorm) | Lin Mere | 60000 | 651400 | 675200 | 80.00 | 671200 see Bs jpareria) Sopp yrs dsr ee op 8 ea Seerldeat rue derarena pant bab udon ag tsi | nos 200] 1200] 200] 200) 200 ‘Be rusg oad ey ua otis aeePae bce periecont he dba a7 joorarit) Wale ose of 46m feng) 06m with 0p and i us he fous caw angi olactin gates | res 300] 300 300 300} 300 sscingin the pt Te wal asim must saved et prleruciona! ection, josrarie) ing ma ppc il te spi the url Lee, cary, \eloadhg oped SP gc arma” | nos ao | at ent eat eat star te The al aesighmatt ru! be exes pr esincion the ein. pararvey Banoo wick f Barak eausnof 850m {182 met mustbe proving tng, eng ‘ed ihe opetosipzotteseping | nos so] 500 500 so | 500 against win dtuoaoes. The fal signet us be eect as pet tac olthe fen chage a0 ppararrey Oe werd matt ry egos 9 yet naan rolinesepanrg ener brnanan” | “Pass Wetwlineaitepanrgst tanuat |woahinr | aom00 | soma | rom00 | sooma0 | so0a00 isaac esata 9 nea Ermanenmeessmelarrteen Ve sis mo ema stuchon he ofesin change. Special Note : For Remote area under each Zone, the rate ofeach and every itam of al the Divisions (1-6) ot ‘Schedule of Rate wil be enhanced by 5% The lst ofthe “Remote Area” are as folows 1) Mymenshing Zone: Austagram, na, Nithamain and Knaljuri Upazila, 2) Sylhet Zone ‘Azminigan), Dnarmapasha, Shullah and Tahirpur Upazila. 8) Barisal Zone Hizla, Mulad, Mehenciganj, Monpura and Rangabali Upazila. 4) Chattogram Zone: Swandip, Kutubdia Upazilas and Khagrachar angamatl, Bandarban Hil Districts, Moheskhall 5) Cumilla Zone Hatia Upazila aind| Gi hash (Annesha Das Hasip (Ma Tanveee Hee sahil gir KOQRHD eet Eager CO RAD Tl tig Penance Die! Roa Den & 3 Minne ssn "Satan gen Bika al tea ar, apr ka ‘al a va Copt Member of Commit. Member of Comite (Nisa Noman) Exective Engine, RHD DcuenltiondPrvutement Divison Sarak Baba Teper, Dhaka tad Member of Commit a ima Superinen NCC) RUD) Planing Data Cie, leu aon Dla Meater Conte C2 ee) (s6)(C0) RAD SSASEC Rat Connctiy Pret, Sark Baba Fao, sha an Member Comite ane" hE Adi Pet Deo E) RAD “ed silky Bilge Prec Ban Dl a enka Comite 1y 28 (Mohammad Shaheen Sacker) Exsctve Engine, BHD Raley Division Ale Tegan Dia Member of Comte, (ashe Aker fa Soper Exner (C] RED Tc ven Cie Sara aban Foguon Dhaka nd Member of Comite agi Superintending Enginoet, RHD ‘Dhaka Roa Circe, Alenbar Tejon, Dhaka and Member of Commits. >) (AK. Mohammad FazlPR Superintending Engin, RHD Road Design Salty Ce, Alenban Tejon, Dhaka and Member f Commitee. Mohammad Bulbul Hossain) (Ds Excelve Engine, RHD real Division, Member of Commits oi (SRammad Ahad Ullah) sie Engi, RD CComil Roa! Division CComils ‘nd Member of Comite, Boe i Superintending Engineer, RAD ————~ Workshop Cle, Sar Bab, Daa enter ofr cee (Mai Shahadat Hossain) Superintending Enger (CC) RHD Bridge Design Cie, Sark Basan, Tejon, Dhaka and Memb cf Commitee az — (De Md. Abdulla Dinter SE) RHD Road Laban, Mpa, Dhak ond Member Screiy of Comite. (4 Sat Wahi) All Chl Engine (CRED Tech Sat At Toga, Da a Charman font. Annexure-I Table-1 : FPS and Metric System Conversion 1. inch 25.40 _mm=2.54em 1 mm 0.03937 inch 1 feet 30.48 cm = 0.3048 m 1 metre 328 feet 1 mile 1.609 km 1_km 0.6214 mile 1. gallon (UK) 4.546 litre 1 ie 022 gallon 1 pound 0.4836 kg 1 kg 2.205 pound 1 ton 1.016 tonne 1 tonne 0.984 ton 1 nt 6.452 om? 1 om? 0.185 ind 1 0.083 m? 1 om 10.764 2 Table-2 : CROSS-SECTIONAL AREA AND MASS OF ROUND BAR Nominal Size | Bar No. Cross- Perimeterin | Mass per | Length per (aia in mm) sectional area mm running 100g in inmm? meter in kg meter 4 12.6 127 0.099 1010.10 5 19.6 16.71 0.164 644.95 6 a 28.3 18.85 0.222 450.45 7 38.5 21.99 0.302 331.12 8 50.3 25.18 0.395 253.16 10 3 7388 31.42 0616 162.34 12 4 113.0 377 0.888 112.61 16 5 201.0 50.27 1.879 63.33 20 6 314.0 62.83 2.068 40.55 22. 7 380.0 69.11 2.980 33.56 25 8 491.0 78.54 3.854 25.95 28 9 616.0 87.96 4.830 20.70 22 10 804.0 100.53 6313 15.80 40 1287.0 125.66 9.864 10.14 Annexure-I Table-3 : CBR & Compaction of Pavement Works (as per General Specifications, June 2016) Base Course (Type-t) Not less than 80% 98% Base Course (Type-2) Not less than 50% 98% Sub-Base Not less than 25% 98% Isc Not less than 8% 95% Sub-grade Not less than 6% 95% Embankment Not less than 4% 98% Table-4 : Frequency of Tests (General Specifications Section 1.3, June 2016) ‘Washed Grading | atterberg | _ Max Dry In-situ ACY, 10% (STP 3.3/7.2) | Limits (STP | DensityiCBR | Density Fines and 32) (stP.4.3) | (STP.6.2) LAA (STP. 45, 5.1) TIA,T.72, AASHTO T96) Earthworks: 1/2000 m2 | 1/2000m® | 1/1000 m? Improved Sub-} 1/1000 m® 1/1000 m3 | 1/1000m*® | 3/1000 m? Grade Sub-Base 4/750 m® 1750m® | 17750m® | _a/1000 m2 112000 m® Base 1/600 m®* 1is00m® | 1S00m® | 3/1000 m2 1/1000 m® Table-5 : Grading Requirements for Sub-base Materials (General Specifications Section 3.2, June 2016) Sieve Size Percentage by Weight Passing Sieves (mm) Grading A Grading B 50 100 - 38 90 - 100 : 20 50-85 100 10 30-65 80-100 5 25-50 50-80 24 15-38 35-65 06 8-22 15-40 03 6-16 10-30 0.075 2-8 510 (General Specifications Section 3.10, June 2016) Annexure-I rading Requirements for Dense Bituminous Surfacing (Plant Method) Thickness (mm) 60-75 40-60 40-50 Sieve Size (mm) ‘Total % by weight passing (including filer) 25 100 B = 20 90 - 100 100 100 14 ‘85 - 100 ‘85 - 100 10 55-82 65-90 70-90 5 35-57 45-65 52-72 24 20-40 25-45 40-58 12 15-33 18-36 30-48 0.600 10-26 12-30 20-38 0.300 6-20 9-20 14-28 0.150 5-13 5-15 8-20 0.075 37 3-7 6-10 Biumen Content ttl weight & mixture. Peroeniage by wig ound by ants 40-60 45-65 60-70 Bituminous Surface Treatment Table-7 : ACV/TFV/LAA of Crushed Aggregate (as per General Specifications, June 2016) (Plant Method) Less than 25% : Greater than 125KN Base Typ Less than 30% Less than 35% : Base Type-t! Less than 35% Less than 407% : ‘Sub-Base Not greater than 38% : Not Less than 75KN Basic Items Rate : Materials Annexure-II + | saa iat=05 cum | 42000| co] 42000] 47000] 43000 Ale08 um | —soe00| 2000/6000] seoc0| 8000 M10 cam | 64200| e000) 63000] eeoc0| 62090 Anes cum | 125000) 117600) r2w00| 126000] _ 195000 Ales cum | 188000) 157500) 207500] 178000] _ 160000 2 | Canent ore Ton | steno) sonc0)—soon0| —eoenc0| —e0o000 | Reniocanent sande Tor 6es0n 00 | 6900000) 6asw00| éasen00| éao00 | unen e100 (6a Tan] 5400000] $5000.00 5700000 | s900020 5000000 v7 (Bun) Ten | sea0n00| sro ss00000 | eror0.00| ss00000 20100 (Oru) Ter sst0n00} 5500000] s7o0000| seneo00| so0000 6070 (Ca Tor | S00 | 7200.00 | Senn | st000.00| 500000 = | x ists erio60 | 1000000] 110000) se0000| eae0c0| _eea000 ut Machne ade [Per sce0 | tooo] t900000| ‘eapa0| 1036000] 140000 | ek tes fom cam | 0060] ezsno0 | 52800] az08.00| 985500 Bik Chis ‘aan can [- #00000 | 48000] —as#800| ~a2ee00] —a7ee00 a | iexPs is sa|eas[ sao Je | Stone cps ances) — [nm om 0000 | 6600.00] 650000 ‘ann ou 320000} 5000.00] 520000 ‘ern oun 0000 | 540,00| 520000 im jean 520000 4900.00] 520000 erin om 25000 | 575000| 690000 v0] = waco 50m ‘nn Tern = nm E 71 | Stone Gipings (Pats) [20mm can | e100] soa 0] esen00| e2eoc0| —enoaa0 Tan un | ~7een00| san 20 | ~a2000 | ~ese000| — 770000 Torn can | 750080] 790000 0000] ~eatoc0] — 720000 | Grae enya cam ——|onao} 25:00] e0n00| _a/on00 | — 220000 12 | Baers 108-2000 can | ~e#en0| —seon20| ~eoao0| ~

You might also like