You are on page 1of 1

CHECK LIST

FOR

PIPING STRESS ANALYSIS - INPUT


PROJECT : VTPS
CLIENT : DCPL PACKAGE NO. C-17 WATER SYSTEMS
PROJECT No. : GID-0235

DOC.NO : REVISIONS
SL.
DESCRIPTION
NO.

1 Pipe Size & Schedule are correct As Per Spec/ Line List

2 Design Pressure and Temperature are Correct as Per Line List


Friction factor & Corrosion Allowance as correct as per Package Input
3
Insulation Thickness & Density are Correct
4
Pipe Material is correct
5
Fluid Density is correct
6
Initial Thermal Displacements are entered are correct
7
Wind & Seismic Loads are as Per Package Input
8
Co-ordinates and North indicated as follows in Isometric Drawings for giving input accordingly.
9 +X Pointing South , +Y Pointing Up , +Z Pointing West

Include Unit file : KPFUNI.Fil


10
Piping Geometry checked for co-ordinates with respect to Piping layout
11
Installation Teperature is 25º C
12
Type of Branches,SIFs, Bends with correct bend radius & Single/double Flange, Rigids with correct
13 weights etc are defined as per the Input Isometric Drawings.
Piping Code B31.1 defined. Allowable stress field checked for the elements when there is change in
15 temperature or Pipe material.
Equipment connections initial thermal displacements defined correctly or Equipment Modeled
16 appropriately upto zero displacement points.

Load cases are defined according to the Wind & Seismic condions
18
Variability for springs should be 25%
19

20 Warnings verified

21 General and Calculation Specific Comments of Client etc. incorporated


LEGEND
OK CHECKED BY :
- NOT APPLICABLE
H HOLD DATE :

Page 1 of 1

STRESS-CHK LIST.xls