DEVIATION LIST

Project
GAS ODORIZING SYSTEM
Details:
Document
No &
Vendor
M/s. Penta Global Engineering and Constructions Pvt Ltd
Name:
Quotation
OFR/0318/MTG/20 – 21 Date : 04.03.2021
No/Date:

Sl. No Para No./ Reference Section Description Item Description (as per Document) VENDOR Deviation/ Exception/ Clarification/

Process Data Sheet for Odorization


2 Sec 8.0 and point No 21 Suitable shed for protection for rain / sunlight In Client Scope
System

All tubing shall be SS and minimum of 1” size shall be We have considered 1/4" OD tubing which is sufficient for for the
Process Data Sheet for Odorization
3 Sec 8.0 and point No 10 clamped and routed in GI tray up to pipeline. For any different odorant flow capacities.Also the ½ " tubing will be of higher size and
System
end connection necessary adopter is in vendor’s scope. hold up of chemical is higher

Process Data Sheet for Odorization Power Supply 230 VAC +-10 %, 50Hz±3% UPS at one point from
4 Sec 8.0 and point No 8
System feeder UPS In Client Scope