You are on page 1of 30

CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output

Registration Number = PG/E/ST/2018/31

Number of Stories = 35+1


= 36

Registration Number is an odd Number. So Specified member is Frame 01.

Frame 01: Column C1 and Beam B1

C1: 1000x1000 mm2


B1: 750x750 mm2

Load Calculation

For C1

B1
C1
7.00 m
B1 B1
Total length of B1
B1 = 8m + 7m
= 15 m

8.00 m
Self Weight of the slab Gk1 = 24x7.0x8.0x0.20
= 268.80 kN

Self weight of the Beam B1 Gk2 = 24x0.75x0.75x15


= 202.50 kN

Floor Partition Weight Gk3 = 2.0x8.0x7.0


= 112.00 kN

Weight from Floor Finishes Gk4 = 2.0x8.0x7.0


= 112.00 kN

Self weight of the Column Gk5 = 1.00x1.00x3.25x24


= 78.00 kN

Total Dead Load Gk = Gk1+Gk2+Gk3+Gk4+Gk5


= 773.30 kN

Imposed load from roof Qk1 = 1.5x7.0x8.0


= 84.00 kN
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output

Imposed Load from the floor Qk2 = 2.0x7.0x8.0


= 112.00 kN

BS EN 1991
Clause Reduction Factor for imposed Loads (αn) = 2+ (n-2)ϕ0
6.3.1.2 n
BS EN 1990 ϕ0 = 0.7
Table A1.1
Load Conditions
For Ultimate Limit State = 1.35x Dead + 1.5x Imposed
For Serviceability Limit State = 1x Dead + 1x Imposed

Dead Load Imposed Column Load


Floor Level Gk (kN) Load Qk (kN) αn αn x Qk
ULS (kN) SLS (kN)

36 773.30 84.00 1.00 84.00 1169.96 857.30

35 1546.60 196.00 1.00 196.00 2381.91 1742.60

34 2319.90 308.00 0.90 277.20 3547.67 2597.10

33 3093.20 420.00 0.85 357.00 4711.32 3450.20

32 3866.50 532.00 0.82 436.24 5874.14 4302.74

31 4639.80 644.00 0.80 515.20 7036.53 5155.00

30 5413.10 756.00 0.79 594.00 8198.69 6007.10

29 6186.40 868.00 0.78 672.70 9360.69 6859.10

28 6959.70 980.00 0.77 751.33 10522.60 7711.03

27 7733.00 1092.00 0.76 829.92 11684.43 8562.92

26 8506.30 1204.00 0.75 908.47 12846.21 9414.77

25 9279.60 1316.00 0.75 987.00 14007.96 10266.60

24 10052.90 1428.00 0.75 1065.51 15169.68 11118.41

23 10826.20 1540.00 0.74 1144.00 16331.37 11970.20

22 11599.50 1652.00 0.74 1222.48 17493.05 12821.98 Axial Forces


21 12372.80 1764.00 0.74 1300.95 18654.71 13673.75 ULS
20 13146.10 1876.00 0.74 1379.41 19816.35 14525.51 35th Floor=
19 13919.40 1988.00 0.73 1457.87 20977.99 15377.27 2381.91 kN
18 14692.70 2100.00 0.73 1536.32 22139.62 16229.02 34th Floor=
17 15466.00 2212.00 0.73 1614.76 23301.24 17080.76 3547.67 kN
16 16239.30 2324.00 0.73 1693.20 24462.86 17932.50 31st Floor=
15 17012.60 2436.00 0.73 1771.64 25624.46 18784.24 7036.53 kN
14 17785.90 2548.00 0.73 1850.07 26786.07 19635.97 1st Floor=
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


13 18559.20 2660.00 0.73 1928.50 27947.67 20487.70 41886.68 kN
12 19332.50 2772.00 0.72 2006.93 29109.27 21339.43

11 20105.80 2884.00 0.72 2085.35 30270.86 22191.15

10 20879.10 2996.00 0.72 2163.78 31432.45 23042.88

9 21652.40 3108.00 0.72 2242.20 32594.04 23894.60 SLS


8 22425.70 3220.00 0.72 2320.62 33755.63 24746.32 35th Floor=
7 23199.00 3332.00 0.72 2399.04 34917.21 25598.04 1742.60 kN
6 23972.30 3444.00 0.72 2477.46 36078.79 26449.76 34th Floor=
5 24745.60 3556.00 0.72 2555.88 37240.37 27301.48 2597.10 kN
4 25518.90 3668.00 0.72 2634.29 38401.95 28153.19 31st Floor=
3 26292.20 3780.00 0.72 2712.71 39563.53 29004.91 5155.00 kN
2 27065.50 3892.00 0.72 2791.12 40725.11 29856.62 1st Floor=
1 27838.80 4004.00 0.72 2869.53 41886.68 30708.33 30708.33 kN

For Shear core


24.00 m

14.00 m
7.00 m

16.00 m

Self Weight of the slab Gk1 = 24x(24x14-16x7)x0.2


= 1075.20 kN

Self Weight of the roof Gkr = 24 x(24x14x0.2)


= 1612.80 kN

Self weight of the Shear core Gk2 = 24x46x0.55x3.25


= 1973.40 kN

Floor Partition Weight Gk3 = 2.0x(24.0x14.0-16.0x7.0)


= 448.00 kN

Weight from Floor Finishes Gk4 = 2.0x(24.0x14.0-8.0x16.0)


= 416.00 kN
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


Total Dead Load including roof GK = Gkr+Gk2+Gk3+Gk4
= 4450.20 kN

Total Dead Load Gk = Gk1+Gk2+Gk3+Gk4


= 3912.60 kN

Imposed load from roof Qk1 = 1.5x(14.0 x 24.0)


= 504.00 kN

Imposed Load from the floor Qk2 = 2.0x(14x24-7x16)


= 448.00 kN

Dead Load Imposed Column Load


Floor Level Gk Load Qk αn αn x Qk
ULS (kN) SLS (kN)
36 4450.20 504.00 1.00 504.00 6763.77 4954.20
35 8362.80 952.00 1.00 952.00 12717.78 9314.80
34 12275.40 1400.00 0.90 1260.00 18461.79 13535.40
33 16188.00 1848.00 0.85 1570.80 24210.00 17758.80
32 20100.60 2296.00 0.82 1882.72 29959.89 21983.32
31 24013.20 2744.00 0.80 2195.20 35710.62 26208.40 For Shear Core
30 27925.80 3192.00 0.79 2508.00 41461.83 30433.80
29 31838.40 3640.00 0.78 2821.00 47213.34 34659.40
28 35751.00 4088.00 0.77 3134.13 52965.05 38885.13 Axial Forces
27 39663.60 4536.00 0.76 3447.36 58716.90 43110.96 SLS
26 43576.20 4984.00 0.75 3760.65 64468.85 47336.85 35th Floor=
25 47488.80 5432.00 0.75 4074.00 70220.88 51562.80 9314.80 kN
24 51401.40 5880.00 0.75 4387.38 75972.97 55788.78 34 Floor=
th

23 55314.00 6328.00 0.74 4700.80 81725.10 60014.80 13535.40 kN


22 59226.60 6776.00 0.74 5014.24 87477.27 64240.84 31 Floor=
st

21 63139.20 7224.00 0.74 5327.70 93229.47 68466.90 26208.40 kN


20 67051.80 7672.00 0.74 5641.18 98981.69 72692.98 1st Floor=
19 70964.40 8120.00 0.73 5954.67 76919.07 152989.73 kN
18 74877.00 8568.00 0.73 6268.17 110486.2 81145.17
17 78789.60 9016.00 0.73 6581.68 116238.5 85371.28
16 82702.20 9464.00 0.73 6895.20 121990.8 89597.40
15 86614.80 9912.00 0.73 7208.73 127743.1 93823.53 ULS
14 90527.40 10360.00 0.73 7522.26 133495.4 98049.66 35 Floor=
th

13 94440.00 10808.00 0.73 7835.80 139247.7 102275.80 12717.78 kN


12 98352.60 11256.00 0.72 8149.34 145000 106501.94 34th Floor=
11 102265.20 11704.00 0.72 8462.89 150752.4 110728.09 18461.79 kN
10 106177.80 12152.00 0.72 8776.44 156504.7 114954.24 31st Floor=
9 110090.40 12600.00 0.72 9090.00 162257 119180.40 35710.62 kN
8 114003.00 13048.00 0.72 9403.56 168009.4 123406.56 1st Floor=
7 117915.60 13496.00 0.72 9717.12 173761.7 127632.72 208275.92 kN
6 121828.20 13944.00 0.72 10030.68 179514.1 131858.88
5 125740.80 14392.00 0.72 10344.25 185266.5 136085.05
4 129653.40 14840.00 0.72 10657.82 191018.8 140311.22
3 133566.00 15288.00 0.72 10971.39 196771.2 144537.39
2 137478.60 15736.00 0.72 11284.96 202523.6 148763.56
1 141391.20 16184.00 0.72 11598.53 208275.9 152989.73

For B1
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


B1

7.0 m

8.0 m
Load Calculation

Self Weight of the slab Gk1 = 24x8.0x7.0x0.2


= 268.80 kN

Self weight of the Beam Gk2 = 24x0.75x0.75x8.0


= 108.00 kN

Floor Partition Weight Gk3 = 2.0x8.0x7.0


= 112 kN

Weight from Floor Finishes Gk4 = 2.0x8.0x7.0


= 112.00 kN

Total Dead Load Gk = (Gk1+Gk2+Gk3+Gk4)/8.0


= 75.10 kN/m

Imposed load on floors Qk = 2x7.0


= 14.00 kN/m

beff

Clause 5.2.2
EC2 NA
beff,1 beff,2
`

b1 bw b2

b
For mid of span (Beam B1)

beff,1 (lesser of) = 0.2xb1+0.1xl0 < 0.2xl0 or b1


l1 = l2 = 8.0 m
b1 = (8.0 - 0.75)/2 = 3.625m
l0 = 0.7 x l2 = 5.60 m

beff,1 = 1.12 m (0.2 l0)


CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


beff,2 = 0.2xb2+0.1xl0 < 0.2xl0 or b2
= 1.12 m (0.2 l0)

beff = beff,1+ beff,2 + bw


= 2.99 m

lo (mid span) = 0.7 x span


= 5.60 m

Location of centroidal axis Z = (1.55x0.22x.61+0.5x0.5x0.25)


(from bottom fibre) (1.55x0.22+0.5x0.5)
= 0.511 m

Near the Supports

beff,1 (lesser of) = 0.2xb1+0.1xl0 or 0.2xl0 or b1


= 0.925 m

beff = beff,1+ bw
= 1.425 m

lo = 0.15 x (l1+l2)
= 2.25 m

Location of centroidal axis Z = (1.43x0.22x.61+0.5x0.5x0.25)


(from bottom fibre) (1.43x0.22+0.5x0.5)
= 0.45 m

Second Moments of Area (B1)

Mid of Span (Imid) = 0.5x0.53 + 1.55x0.223


12 12
0.5x0.5x(0.46-0.25)2+0.22x1.55x(0.61-0.46)2
= 0.0313 m4

End of Span (Iend) = 0.5x0.53 + 1.43x0.223 +


12 12
0.5x0.5x(0.45-0.25)2+0.22x1.43x(0.61-0.45)2
= 0.0245 m4

FRAME 2
E F G H

C3 C2 C2 C3
B2 B2 B2
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


A B C D
Span 1 Span 2 Span 3

C3 C2 C2 C3

I J K L

Consider 3 load Combinations

Combination Span 1 Span 2 Span 3


1 1.35Gk+1.5Qk 1.35Gk+1.5Qk 1.35Gk+1.5Qk
2 1.35Gk+1.5Qk Gk 1.35Gk+1.5Qk
3 Gk 1.35Gk+1.5Qk Gk

1.35Gk+1.5Qk = 122.4 kN/m

Gk = 75.10 kN/m

Max Fixed End Moment MFmax = 61.3x 7.52


12
= 573.68 kN

Min Fixed End Moment Mfmin = 37.05x7.52


12
= 352 kN

Aproximate Analysis for wall -frame structure


CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


Ixx (m4)
Interior Exterior
Girder
Column column
Frame 1 0.083 0.050 0.011
Frame 2 0.050 0.034 0.005

Shear Core

Icore = (15.63x8.133-14.37x6.873)
12
= 311.64 m4

For Frame 01

(GA1) = 12E
h x (1/G+1/C)
= 280,330.79 kN
For Frame 02

(GA2) = 12E
h x (1/G+1/C)
136,921.98 kN

(GA)t = 4*GA1+ 2*GA2


= 1,108,349.48 kN

(EI)t = 2 x 107*311.64
= 6,232,818,375.00 kNm2

𝐻∗√((𝐺𝐴)𝑡/(𝐸𝐼)𝑡)
αH =

= 1.447

Wind Loading = 90 kN/m


y(z) = Horizontal Displacement
Mb = Moment carry by the core
Qb = Total Shear carry by the core
Mt = Moment carry by the structure
Qt = Total Shear carry by the structure
Mf = Moment carry by the frame
Qf = Total Shear carry by the frame

H = 108.5 m αH = 1.447
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output

z/m z/H y(z)/m Mb/kNm Qb/kN Mt/kNm Qt/kN Mf/KNm Qf/kN DI


0 0.000 - 375014.3 9765.00 529751.3 9765 154736.9 0.0 0.0000
3.5 0.032 0.000 341784.3 9227.03 496125.0 9450 154340.7 223.0 0.0002
7 0.065 0.001 310401.6 8709.17 463601.3 9135 153199.6 425.8 0.0004
10.5 0.097 0.003 280797.9 8210.29 432180.0 8820 151382.1 609.7 0.0006
14 0.129 0.005 252908.8 7729.29 401861.3 8505 148952.5 775.7 0.0007
17.5 0.161 0.008 226673.3 7265.13 372645.0 8190 145971.7 924.9 0.0008
21 0.194 0.011 202034.4 6816.80 344531.3 7875 142496.9 1058.2 0.0010
24.5 0.226 0.015 178938.4 6383.32 317520.0 7560 138581.6 1176.7 0.0011
28 0.258 0.018 157334.9 5963.75 291611.3 7245 134276.3 1281.2 0.0012
31.5 0.290 0.023 137176.9 5557.18 266805.0 6930 129628.1 1372.8 0.0012
35 0.323 0.027 118420.6 5162.71 243101.3 6615 124680.7 1452.3 0.0013
38.5 0.355 0.032 101024.9 4779.49 220500.0 6300 119475.1 1520.5 0.0014
42 0.387 0.037 84952.0 4406.68 199001.3 5985 114049.3 1578.3 0.0014
45.5 0.419 0.042 70166.9 4043.47 178605.0 5670 108438.1 1626.5 0.0015
49 0.452 0.047 56637.4 3689.08 159311.3 5355 102673.8 1665.9 0.0015
52.5 0.484 0.052 44334.0 3342.72 141120.0 5040 96786.0 1697.3 0.0015
56 0.516 0.058 33229.9 3003.64 124031.3 4725 90801.4 1721.4 0.0016
59.5 0.548 0.063 23300.9 2671.11 108045.0 4410 84744.1 1738.9 0.0016
63 0.581 0.069 14525.3 2344.40 93161.3 4095 78635.9 1750.6 0.0016
66.5 0.613 0.074 6884.1 2022.79 79380.0 3780 72495.9 1757.2 0.0016
70 0.645 0.080 360.6 1705.60 66701.3 3465 66340.6 1759.4 0.0016
73.5 0.677 0.085 -5059.4 1392.12 55125.0 3150 60184.4 1757.9 0.0016
77 0.710 0.091 -9387.7 1081.67 44651.3 2835 54039.0 1753.3 0.0016
80.5 0.742 0.096 -12633.8 773.58 35280.0 2520 47913.8 1746.4 0.0016
84 0.774 0.102 -14804.8 467.17 27011.3 2205 41816.0 1737.8 0.0016
87.5 0.806 0.107 -15905.2 161.78 19845.0 1890 35750.2 1728.2 0.0016
91 0.839 0.113 -15937.7 -143.25 13781.3 1575 29718.9 1718.3 0.0016
94.5 0.871 0.118 -14902.1 -448.60 8820.0 1260 23722.1 1708.6 0.0015
98 0.903 0.124 -12796.3 -754.92 4961.3 945 17757.6 1699.9 0.0015
101.5 0.935 0.129 -9615.7 -1062.89 2205.0 630 11820.7 1692.9 0.0015
105 0.968 0.134 -5353.4 -1373.18 551.3 315 5904.6 1688.2 0.0015
108.5 1.000 0.140 0.0 -1686.46 0.0 0 0.0 1686.5 0.0015

Shear Force, Bending Moment Calculation by Portal Method

Concentrated Interation Force (QH)


At top level
QHt = (GA)x d(y)
dz
= 1,686.46 kN

For Frame type 2


QH = (GA2)x QHt
(GA)t
= 208.34 kN
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output

QH

V1 V2 V3 V4

V1 = V4 = QH x (7.5/2)
(7.5+7.5+7.5)
= 34.72 kN

V2 = V3 = 69.45 kN
Consider anticlockwise moments are positive

3.75m
V3
M1

1.75m M2

V2
M2 = -V1x1.75
= -60.77 kNm

M1 = M2+ V1x3.75
= 69.45 kNm

3.75m 3.75 m
V1 V3
M1 M3

1.75 m M4

V2

M4 = V2x1.75
= 121.53 kNm

M3 = M4-M1
= 52.08 KNm

V3 = M3
3.75
= 13.89 kN
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


Bending Moment Diagram

69.45 52.08 69.45

60.77 121.53 121.53 60.77

69.45 52.08 69.45

Shear Force Diagram

34.72 34.72 34.72

-34.72 -34.72 -34.72

34.72 69.45 69.45 34.72


`
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output

Design for Wind Loads

Total length (b) = 60 m


Spacing (s) = 7.5 m
width (d) = 22.5 m
Height (h) 108.5 m
Roof slope (α) 00

Basic Wind Velocity = Cdir x Cseason x vb,o

Fundamental Basic Velocity vb,o = 32 m/s


Hand Book
Colombo Terrain Category 0
Zo = 0.003 m

Vb = 32 m/s
consider the directional factor c dir and the seasonal factor cseason are equal to 1.0

Basic Velocity Pressure

qb = ρair v
2

2
ρair = 1.25 kg/m3

qb = 640 N/m2

Peak Pressure

Co(z) = 1 the reccommended value


CT(z) = kT x ln(z/z0) (zmin ≤ z ≤ zmax)

kT = 0.19x (z0/z0,11)0.07

= 0.156036

Zmin = 1m Zmax = 200 m


CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


Turbulance Peak Pressure/
Height/m Wind Profile
Intensity (N/m2)
0 0.123 0.00 0.00
0.1 0.123 0.55 652.36
0.2 0.123 0.66 781.31
0.3 0.123 0.72 856.74
0.4 0.123 0.76 910.26
0.5 0.123 0.80 951.78
0.6 0.123 0.83 985.70
0.7 0.123 0.85 1014.37
0.8 0.123 0.87 1039.22
0.9 0.123 0.89 1061.13
1 0.172 0.91 1279.16
1.2 0.167 0.93 1297.37
1.4 0.163 0.96 1312.76
1.6 0.159 0.98 1326.09
1.8 0.156 1.00 1337.86
2 0.154 1.01 1348.38
2.25 0.151 1.03 1360.14
2.5 0.149 1.05 1370.66
2.75 0.147 1.06 1380.18
3 0.145 1.08 1388.87
3.25 0.143 1.09 1396.86
3.5 0.142 1.10 1404.26
7 0.129 1.21 1473.48
10.5 0.123 1.27 1513.97
14 0.118 1.32 1542.70
17.5 0.115 1.35 1564.99
21 0.113 1.38 1583.19
24.5 0.111 1.41 1598.59
28 0.109 1.43 1611.92
31.5 0.108 1.44 1623.68
35 0.107 1.46 1634.21
38.5 0.106 1.48 1643.72
42 0.105 1.49 1652.41
45.5 0.104 1.50 1660.41
49 0.103 1.51 1667.81
52.5 0.102 1.52 1674.70
56 0.102 1.53 1681.14
59.5 0.101 1.54 1687.20
63 0.100 1.55 1692.90
66.5 0.100 1.56 1698.30
70 0.099 1.57 1703.43
73.5 0.099 1.58 1708.30
77 0.098 1.58 1712.94
80.5 0.098 1.59 1717.38
84 0.098 1.60 1721.63
87.5 0.097 1.60 1725.71
91 0.097 1.61 1729.63
94.5 0.097 1.62 1733.39
98 0.096 1.62 1737.03
101.5 0.096 1.63 1740.53
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


105 0.096 1.63 1743.92
108.5 0.095 1.64 1747.19

Along-Wind Acceleration

σa,x = cf.Ƿ.b.Iv(zs).vm (zs).R.Kx.ɸ1,x(z)


2

m1,x

Zs = 0.6xh
= 65.1 m

cf = cf,0.ψr. ψλ

for ( d/b= 2.7 )

cf,0 = 2.05

ψr = 1

( ɸ = 1, λ= 70)

ψλ = 0.92

cf = 2.05 x 1 x 0.92
1.886
Fundamental Frequuency (n1) = 46/h
= 46/108.5 (h>50m)
= 0.42 Hz

Fundamental along wind modal shape = (z/h)2


Ø1(z)

Since ξ = 1.0 (for buildings with a central core plus peripheral


columns or larger columns plus shear bracings.

Turbulence Intensity Iv(zs) = k1/(c0(z)×ln(z/z0)) for zmin ≤ z ≤ zmax

k1 = 1
Iv(zs) = 1
ln(65.1/0.003)
= 0.100

kT = 0.156

cr(zs) = kT×ln(zs/z0)
Mean wind velocity vm(zs) = 1.558

vm(zs)
= 1.542×1.0×32
= 49.86 ms-1
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output

Mass per unit length of the structure = 3.75 x 105 kg/m

Modal participating mass ratio = 0.98

mx,1 = 0.98×3.75 x 105


= 367500 kg/m

2
R2 = π SLRh(ηh)Rb(ηb)/2.δ

δ = δs+δa+δd

δs = 0.1 (For reinforced concrete buildings )


δd = 0 ( No logarithmic decrement of damping due to dampers)

δa = cf×Ƿ×b×Vm(zs))/(2.n1.me)

= 1.9×1.25×60×49.34
2×0.469×3.68×105
= 0.0204

δ = 0.1+0.0204
= 0.1204
α = 0.67+0.05*ln(z0)
= 0.379543
L(zs) = 300x (z/200)α
Annex B.1 = 195.9357
EN 1991.1.4 fL = 1.666

ηh = 4.6×h×fL(zs,n1,x)/L(zs)

= 4.244

ηb = 4.6×b×fL(zs,n1,x)/L(zs)

= 2.347
-2 η 2
Rh = (1/ηh) – (1-e h)/(2. ηh )
= 0.208

Rb = (1/ηb) – (1-e b)/(2. ηb )


-2 η 2

= 0.336

SL(zs,n1,x) = 6.8× fL(zs,n1,x)/( 1+10.2×fL(zs,n1,x))


5/3

= 0.091688

R2 = 0.26257655066
R = 0.512422

Kx = 1.5 ζ = 1
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


σa,x = cf.Ƿ.b.Iv(zs).vm (zs).R.Kx.ɸ1,x(z)
2

m1,x
= 0.000679 z ms-2

Kp: Peak factor

σa,x Characteristic Peak


z/m Kp
Accleration
0 0.0000 3.509 0.000
3.5 0.0024 3.509 0.008
7 0.0048 3.509 0.017
10.5 0.0071 3.509 0.025
14 0.0095 3.509 0.033
17.5 0.0119 3.509 0.042
21 0.0143 3.509 0.050
24.5 0.0166 3.509 0.058
28 0.0190 3.509 0.067
31.5 0.0214 3.509 0.075
35 0.0238 3.509 0.083
38.5 0.0261 3.509 0.092
42 0.0285 3.509 0.100
45.5 0.0309 3.509 0.108
49 0.0333 3.509 0.117
52.5 0.0356 3.509 0.125
56 0.0380 3.509 0.133
59.5 0.0404 3.509 0.142
63 0.0428 3.509 0.150
66.5 0.0451 3.509 0.158
70 0.0475 3.509 0.167
73.5 0.0499 3.509 0.175
77 0.0523 3.509 0.183
80.5 0.0546 3.509 0.192
84 0.0570 3.509 0.200
87.5 0.0594 3.509 0.208
91 0.0618 3.509 0.217
94.5 0.0641 3.509 0.225
98 0.0665 3.509 0.233
101.5 0.0689 3.509 0.242
105 0.0713 3.509 0.250
108.5 0.0736 3.509 0.258
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output


CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output

Base Shear
BS EN 1998 1
Cla4..3.3.2.2 For building height higher than 40m

T1 = 2.d0.5
d = 0.1396

T1 = 0.747 s

Sd = 4 ms-2

λ = 1 (T1 > 2.TC)

m = 40.2646 x106

Fb = Sd(T1).m.λ
= 161058.4 kN

Base Shear Force = Fb/R


= 107372 kN

Fi = Fbx zi m i

Σz mi, i
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output

Zi mi zi Fi
0 0.00 0.00
3.5 4546099.95 216.48
7 9092199.90 432.95
10.5 13638299.85 649.43
14 18184399.80 865.91
17.5 22730499.75 1082.38
21 27276599.70 1298.86
24.5 31822699.65 1515.33
28 36368799.60 1731.81
31.5 40914899.55 1948.29
35 45460999.50 2164.76
38.5 50007099.45 2381.24
42 54553199.40 2597.72
45.5 59099299.35 2814.19
49 63645399.30 3030.67
52.5 68191499.25 3247.15
56 72737599.20 3463.62
59.5 77283699.15 3680.10
63 81829799.10 3896.57
66.5 86375899.05 4113.05
70 90921999.00 4329.53
73.5 95468098.95 4546.00
77 100014198.90 4762.48
80.5 104560298.85 4978.96
84 109106398.80 5195.43
87.5 113652498.75 5411.91
91 118198598.70 5628.38
94.5 122744698.65 5844.86
98 127290798.60 6061.34
101.5 131836898.55 6277.81
105 136382998.50 6494.29
108.5 140929098.45 6710.77
Σz m i, i 2254865575.20
CE623: High Rise Buildings PG/E/ST/2018/31

Reference Calculations Output

Comparision: Horizontal Displacements

Approximate
Computer Analysis
Analysis
Floor Level
U2 (Wind
U2 DI U2 DI
Code)
1 0.000 0.0002 0.001853 0.0000 0.00078
2 0.001 0.0004 0.006087 0.0001 0.00243
3 0.003 0.0006 0.011901 0.0001 0.00471
4 0.005 0.0007 0.019012 0.0002 0.00756
5 0.008 0.0008 0.027335 0.0003 0.01092
6 0.011 0.0010 0.036766 0.0003 0.01474
7 0.015 0.0011 0.047184 0.0004 0.01897
8 0.018 0.0012 0.058466 0.0005 0.02356
9 0.023 0.0012 0.070494 0.0007 0.02845
10 0.027 0.0013 0.083161 0.0008 0.03361
11 0.032 0.0014 0.096366 0.0009 0.03899
12 0.037 0.0014 0.110018 0.0010 0.04456
13 0.042 0.0015 0.124033 0.0011 0.05028
14 0.047 0.0015 0.138334 0.0013 0.05612
15 0.052 0.0015 0.152851 0.0014 0.06205
16 0.058 0.0016 0.167522 0.0015 0.06805
17 0.063 0.0016 0.182288 0.0017 0.07409
18 0.069 0.0016 0.197099 0.0018 0.08016
19 0.074 0.0016 0.211912 0.0020 0.08623
20 0.080 0.0016 0.226686 0.0021 0.09228
21 0.085 0.0016 0.24139 0.0022 0.09831
22 0.091 0.0016 0.255997 0.0024 0.1043
23 0.096 0.0016 0.270485 0.0025 0.11025
24 0.102 0.0016 0.284838 0.0026 0.11614
25 0.107 0.0016 0.299048 0.0028 0.12197
26 0.113 0.0016 0.313119 0.0029 0.12774
27 0.118 0.0015 0.327068 0.0030 0.13346
28 0.124 0.0015 0.34091 0.0031 0.13911
29 0.129 0.0015 0.354543 0.0033 0.14471
30 0.134 0.0015 0.367495 0.0034 0.15026
31 0.140 0.0015 0.378958 0.0035 0.15564
Deflection of the Structure
1

0.9

0.8

0.7

0.6

0.5
z/H

0.4

0.3

0.2

0.1

0
-0.01 0.01 0.03 0.05 0.07 0.09 0.11 0.13 0.15

Deflection /m
Bending Moments of the Structure
1

0.9

0.8

0.7

0.6

0.5
z/H

0.4

0.3

0.2

0.1

0
-100000 0 100000 200000 300000 400000 500000 600000

Bending Moment/ kNm

Shear Core Total Frame


Shear Forces of the Structure
1

0.9

0.8

0.7

0.6

0.5
z/H

0.4

0.3

0.2

0.1

0
-2000 0 2000 4000 6000 8000 10000

Shear Force /kN

Shear Core Total Frame


110

100

90

80

70

60
Axis Title

50

40

30

20

10

0
0 200 400 600 800 1000 1200 1400 1600 1800 2000

Axis Title
Characteristic Peak Accelaration

105

70
Height/m

35

0
0 0.05 0.1 0.15 0.2 0.25 0.3

Characteristic Peak Accelaration/ (ms-2)


105

70
Height/m

35

0
0 1000 2000 3000 4000 5000 6000 7000

Base Shear/ kN

You might also like