The new radiator will be installed in the same position as before, and the leg height will
be changed from 1.5m to 2m.
1. Remove the existing radiator
1. Cut off and disconnect the piping and the electrical wiring
2. Remove the MDU VENT DUCT
3. Remove the existing radiator
2. Install the new radiator
The recommended installation procedure is.
1) Remove units from container and check for damage/shortages.
2) Position stanchions and fit cross braces.
Do not fit lateral and front braces.
3) Before positioning radiator check security of fixings.
1) Connect the provided MDU Ventilation duct 1m before reinstalling the MDU Ventilation duct .
2) Reinstall the modified MDU Ventilation duct.
3) Install the support including additional support provided
4. Reinstallation of Piping
1) Connect the cooling water inlet, outlet , Expansion Tank Engine Vent , Drain, Water fill-in line.
2) Additional pipes must be welded and attached for matching. We will supply additional pipes
and counter flanges.
3) Connect the rubber expansion joints, gauges, air vents, drain valves and control sensor.
L • CW Coolant piping changes
TERMINAL BLOCK
• Additional Supply Material
( 150A)
CABLE
FCV 3C-35sq
Engine / Generator
control panel