FLOWCHART PROJECT

Incoming
Material

Inspection Received
Material

Fabrication Material

Assembly Material

Painting

Erection

Finishing
Quantity
material

Inspection Dimentional
Thinkness Received material
material Check
Material

Mill
Sertifikat
material

Appropriate or Not?

still in tolerance or not?

YES NO

Continue to Fabrication Work Complaint to supplier

Accepted Rejected
Fabrication
Material

Marking
Or
cutting plan

Not Cutting & Driling


Appropriate
with drawing
& standard
tolerannce Indentification part

PPIC & Q.C Check :


HOLD
1. Dimentional check
Point
2. Roughness edge check
3. Quantity

WELDING
process

No welding Q.C Check :


process HOLD
Point
1. Dimentional Check

2. Visual Welding Check

ASSEMBLY
PROCESS
ASSEMBLY
PROCESS

WELDING
process

WELDING
process