wbs project

wbs project

Building Works M & E Works

Site work Foundation Concrete slab Plumbing rough-in Roofing Floor finishes Drywall Painting Cleaning new task new task new task

Clear Lot Layout footings Basement slab preparation Plumbing sub-slab Roofing paper installed Ceramic tiles Stock drywall Prep for drywall for prime
coat

Strip topsoil & stockpile Dig footings & install Termite treatment basement Plumbing layout Stock roof shingles Install hardwood floor Prime paint drywall
reinforcing slab

Stake lot for excavation Footing inspection Slab inspection Plumbing rough-in Install roof shingles Install carpet

Excavate for foundation Plumbing inspection Final coat hardwood