You are on page 1of 4

CG FOOD INDIA

ROOPANGARH, RAJASTHAN
NATURE OF WORK: CONSTRUCTION OF FACTORY BUILDING
CONTRACTOR: GREEN PLUS AND CONSTRUCTION
VERIFICATION OF PEB WORK BILL AGAINST ERECTION OF PRIMARY AND SECONDARY ME
SN Member As per Drawing Erected Balance work Balance metal weight
wt/no qty
1 Main steel column 48 48 0 100.00%
3 Mezzanine column 60 27 33 45.00% 111.15 3,667.95
4 Main Beam 170 79 91 46.47%
5 Secondary beam 177 39 138 22.03%
6 Rafter 24 23 1 95.83%
7 Purlin 594 450 144 75.76%
ORY BUILDING
RUCTION
ARY AND SECONDARY MEMBER
Material in site weight Work completed %

0 0.2 20.00%
0 0.15 6.75%
38 0.2 9.29%
101 0.15 3.31%
1 0.15 14.38%
144 0.15 11.36%
65.09%
CG FOOD INDIA
ROOPANGARH, RAJASTHAN
NATURE OF WORK: CONSTRUCTION OF FACTORY BUILDING
CONTRACTOR: GREEN PLUS AND CONSTRUCTION
VERIFICATION OF PEB WORK BILL AGAINST ERECTION OF PRIMARY AND SECONDARY MEMBER
SN Member As per Drawing Erected Balance work Material in site
1 Main steel column 48 48 0 100.00% 0
3 Mezzanine column 60 27 33 45.00% 0
4 Main Beam 170 79 91 46.47% 38
5 Secondary beam 177 39 138 22.03% 101
6 Rafter 24 23 1 95.83% 1
7 Purlin 594 450 144 75.76% 144
BUILDING
TION
AND SECONDARY MEMBER
weightage Work completed %
0.2 20.00%
0.15 6.75%
0.2 9.29%
0.15 3.31%
0.15 14.38%
0.15 11.36%
65.09%