RT Work Summary April – 19

Sr. Total #
Type Size Film Size Qty Rate Amount
No. of Exp
1 03/04/19 Pipe 2.5” 7.5 x 3 1 3 131 393
2 06/04/19 5x3 19 38 122 4636
NCB
3 07/04/19 Nitration 1.5” 5x3 4 8 122 976
Coil
4 08/04/19 5x3 3 6 122 732
5 10/04/19 Plate 12 mm 15 x 3 1 1 174 174
6 13/04/19 Pipe 2.5” 7.5 x 3 1 3 131 393
7 16/04/19 Pipe 4” 7.5 x 3 1 3 131 393
8 17/04/19 Pipe 2.5” 7.5 x 3 1 3 131 393
14 KL
9 19/04/19 DCONA 7.5 x 3 1 12 131 1572
Tank
10 19/04/19 Pipe 4” 7.5 x 3 1 3 131 393
11 25/04/19 Pipe 4” 7.5 x 3 1 3 131 393
12 Transportation 4 1250 5000
13 Unit Charge 5 2250 11250
Total: Twenty Six Thousand Six Hundred and Ninety Eight 26698