CURRICULUM VITAE
Dear Prospective Employer
|. am Applying for the position of Welder. My main skil for this job are | am hard working
Honest and keep to progress .It is best to reach me by mobile phone.
Batam, Indonesia 2021
Personal Detail’s
:ZULKARNAIN
Place/Date of Birth : Serapuh Asli, May 10", 1991
Sex :Male
Marital Status : Married
Religion : Moslem
Nationality : Indonesia
Address.
Contact Person —: #62815 3433 6172
: Kampung Padang Penaga RT. 001 RW. 006 Galang - Batam
Se et eyed Period pei
PT, ROTARY
Welder 3G/4G | SLNG —Tanjung Uncang | Oct 17", 2019
a ENGINEERING a Job Completed
eens FAW Batam’ (ct 16", 2020
8369-Amrun Traveller
oz | PT.MeCONNELL | Welder sa/4G | Temporary Works | Dec 08,2018 | Finish Contract
DOWELL SERVICES | FCAW-GS | Modification andNew | Aug 04,2019 | Fi"
Bulld — Batam
Batam,
Best Regards,
( ZULKARNAIN )WELDER IDENTIFICATION QUALIFICATION RANGE
Terahe | Ticino
ed ee =
Indonesia oven] or | |icawan]_omeee | tome
Project +: Amrun Fabrication and = =
‘Modifiation Tecaporary Werks Package as z
Welder 1D Ne: MCD-4253 "a
Welder Name: ZULKARNAIN 5
essporutC No: 1285111005910005
Nationality ndongie =
Rival Sapatra
Noe! Mandado
reyPROVING! KEPUL/\
KOTABAY A
NIK bensys.005940
KARLU TANDA DLA
Serena
en
Sergrmges
sarap
s.StNGtono.19
+ tay ees no
QUALIFICATION RANGE
SS Se
PT. MeConnet Dowell Series Bataan Seon toon
Indonesla soon pa re rs
a was] fu
Project + Ameun Fabrication and na mek | t
Modification Teaporary Works Packane
Weldee (0 No, MCD-4253
Welder Name: ZULKARNAIN T
PassporutC No 120s1.190591 0005 Z aa
dong =| Qe
9 te
>
2
SURAT 3 ‘
CERTIFICATE OF EMPLOYMENT
No. 175/HR-REWVX/2020
Dengan ini menerangkan bahwa
This is certify that
‘Nama Zulkarnain
Name
‘Nomor Karyawan 82952
Employee Number
Ki Te Welder
Final Classification
stemen New Building 1
Department
Masa Kerja 17 October 2019 — 16 October 2020
Service of Period
Alasan Berhenti Job Completed
Reason of Termination
Kami mengucapkan terima kasih atas usaha dan jasa yang telah Saudara sumbangkan kepada
PT. Rotary Engineering Indonesia dan betharap semoga prestasi dan keberhasilan senantiasa
menyertai Saudara dimasa yang akan datang.
We would like to take this opportunity to thank you for your past effort and contribution
PT-Rotary Engineering Indonesia and wish you every success in the future.
Batam, 16 October 2020
Kenneth Ong
Deputy General Manager
PT. ROTARY ENGINEERING INDONESIA
‘in Brand Katarmen, KM 6 Tanung Uncang Batam Tela (0778) 391868 Fax. (0778) 202108
sro eryerg comSLING |
Slayer LNG Corer |
MANUFACTURER'S RECORD OF WELDER OR
WELDING OPERATOR QUALIFICATION TESTS
T ="
Rew)
ROTARY
[ASME P. No L GROUP Ho,
BACKING (METAL. WELD METAL
Fux, 6
PIPE On PLATE: (OIA. IF >>
METAL SPEC
Aus CLASS
FILLER METAL F-NO.
JCONSUMABLE INSERT FOR GTAW/PAW.
Jwe1 DEPOSIT FOR EACH PROCESS.
|WELDING FOSITION (1G, 5G, ETC.
JpROGRESSION (UPHILIZOOWNMILL)
JbACKING GAS FOR GTAW PAW. GMAW
weLoING CURRENT TYPE/eOLART
LANSFER MODE FOR GMAW/FCAW.
DIRECI/AEMOTE VISUAL CONTROL
JAUTOMATIC VOLTAGE CONTROL
JAUTOMATIC JOINT TRACKING
JWeLD POSITION (1G, 5G, ETC)
lconsuiasie insear
JeACKING MATERIAL (METAL , WELD, ETC)
franc ZOLRARNAIN
proce ERMINAL-DHASE 3 EXPANSION
bwex ins peocessc 1 FEAWDS
wos 67
base waTERIAL WELDED ASTM A268
[cen
True
1205111005970005 7
BACK WELD
SFA AS 206-717-16
|
Copy |
6
Wa
18mm for FAW
rau
wa
WA
NA
WA
9) Facesend
(08 OCTOBER 2018
WIBACKING ONLY
am TO 26 0
FO-ASME Cass ea.
NA
‘in 3 m0 en for FAW
NA
cer
NA
NA
WA
‘ACCEPTED (CIE-NDT-AT AWS-WOT 00)
‘Akemate Test Resuts
le ceraty that the statements in ths racerd are correct and thatthe tes
ene requirements of Section IX ofthe ASME Code
Drtaeseacter Name
Re“ lnepects Tie,
Date
PON was prepared, welded and tested i
‘SUNGCer
Sane Record of Welder Qualification Test eis
CLIENT. McCONNELL DOWELL CONSTRUCTORS (AUST Pv. 408 NO: 8368
PROJECT: AMRUN FABRICATION & MODIFICATION TEMPORARY
WORKS PACKAGE -
TALE OF WELDER ZUCKARNAIN TGERTION 7 WED EATaN | STANFORIONE
fore orraranie neo-29
So a wen UAIFCATON TESTI
reams sewavrousnc neoeseccts Pom ho nies 02,09 exe |
‘ARALES FOR EAGIPROCEENES) (WS 1) ‘acTua. Lee ance QUALireD
ie drt We wae Rave aot
(metal, wese Metal, weleed (ror Dc sides fax Ste 1 Gouging and Back Wis STN Backing (weed Metal cr Bucs
a [secnaramteecnen | tera eh
7 Taos ER. SEE any manor
| a
Pate es N°SOD Tres = ae Tad Sr Uri
ae ane ae FO wan re waa Fe
For 56 6 Soa Peta [sacs [evn on tame eT
ego EO ma ja
‘Shiclong Gasies) & % Compositions) Sein C08 [se 908 coz
Fas rar Cucina Sane ime
eng are rs Pry Bee oe
SoceRewicon Bene Oona Oona a we
AOOTIGNAE RAGHINEWELONG VARABLES ”__AETUALYALUES RANGE QUMLRED
Brea Reet ave Cone aire Ore Co aire Orca
aera Voge Craw FOR ry mn
— [NA Twa
Sage sie Pose a Pee wok Pe
WSUALACEESTANCE SF nae SoMRIURE ore
TEST CoUPON WEG eal SaruTAA oe 0142/2018
FearcoieorTba we eis
RADicanAPNG TEST RESUATS
SORATERUTNE GHLRCNTION —_Je81 eooucrep or. nerORT Ne nant
SeScooeweLeserRASoMAM PT THANOTMOONESA ——_RITNOTNG acetone
FRAET WELD Test RESULTS
FUSTRE TES OEGROE THE AE NO STE
Staats on eas oF Te SHEcaae wa
LENGTH ato PERCENT OF verecTs as
MACRO TEST#USIN
pPPEARUNCE FLT SEES) ae TEENS VOR COREANTTE em
TesrconoucreD ey ‘us Teste
{ST THAT Tr STATEMENT NR ECGRG Ss CORRECT AND THAT THETESTWLDS Wn PEDRO
TEstED mACSONDANGE ATUL O77 S01 STRUCTURE WELDING CODE. SER.
70 BE SioNE9 On COMPLETION OF PROCEDURE
LENT (Tess SERIE ATION
Seer Seoesourne
erent
a CERTIFIED TRSURAT KETERANGAN KERJA
CERTIFICATE OF EMPLOYMENT
0475 / MCD / VII /2019
Dengan ini menerangkan bahwa
This is certify that:
Nama ZULKARNAIN
Name
No. Karyawan 4253-MCD
Badge No.
Proyek/ Lokasi : 8389 AMRUN TRAVELLER TEMPORARY WORKS
Project ‘Location MODIFICATION AND NEW BUILD
Jabatan Terakhir WELDER 1* CLASS
Last Pasition
Masa Kerja DECEMBER 05", 2018 TO AUGUST 04", 2019
Periode of Service
Alasan Berhenti : FINISH CONTRACT
Reason of Leaving
Kami mengucapkan terima kasih atas usaha dan jasa yang Saudara berikan kepada PT. McCONNEELL
DOWELL SERVICES Batam. Semoga keberhasilan sclalu menyertai Saudara dimasa mendatang.
We would like take this opportunity to thank you for your past efforts and contributions PT.McCONNELL
DOWELL SERVICES Batam. We wish you every success in the future.
Batam, August 04", 2019
For PYAGGONNELL DOWELL SERVICES