Rujukan Kami : JKR(UTP)C.

3/1/62(S)( 10 )

Tarikh : Jun 2021

Kepada,

_________________________

_________________________

SEBUTHARGA SEGERA

Sila berikan sebutharga bagi kerja-kerja di bawah dan hantar dengan tangan ke pejabat ini
dengan kadar segera sebelum jam 12.00 tengah hari……………………..

………………………………

TAJUK : KERJA-KERJA KECEMASAN BAGI MENCARI KEROSAKAN SISTEM BEKALAN


ELEKTRIK VOLTAN SEDERHANA RING BESAR DI PANGKALAN UDARA KUANTAN
PAHANG DARUL MAKMUR

PENGKHUSUSAN : E04, E05 DAN E11

Bil. Perihal Kerja Harga (RM)

1 Seperti di Lampiran – Jadual Harga.

( Ringgit Malaysia ……………………………………………………………………………………………………..

………………………………………………………………………………………………………………….)

Tempoh siap kerja : SATU (1) minggu dari tarikh penerimaan pesanan kerja.

Tarikh : Tandatangan kontraktor :…………….

Cop Rasmi:…………………………….
DOKUMEN YANG DIPERLUKAN

1. SIJIL CIDB PERAKUAN PENDAFTARAN


2. SIJIL CIDB SPKK
3. SIJIL TARAF BUMIPUTERA
4. BORANG Q SURUHANJAYA TENAGA
5. SIJIL SSM
No. Fail :
No. Inden :

KERJA-KERJA KECEMASAN BAGI MENCARI KEROSAKAN SISTEM BEKALAN ELEKTRIK VOLTAN SEDERHANA RING BESAR DI
PANGKALAN UDARA KUANTAN PAHANG DARUL MAKMUR

BILL OF QUANTITIES

JADUAL KADAR HARGA


BIL BUTIR KERJA UNIT KUANTITI HARGA (RM)
BHG BIL (RM)
A KADAR HARGA MENGIKUT HARGA DIPERSETUJUI

1 Preliminaries for compliance with schedule of Conditions


Of Contract and specifications including : LS LS

To provide all necessary insurance policies such as:


a) Public Liability Insurans
b) Works Insurance
c) Number under the Employee's Social Security
(SOCSO) scheme

2 To provide competent person in the "BO" category for


switching work and detect damage at Old Main Intake,
DAY 1
Martello and other 22 sub station Ring Besar at Kuantan
Air Base

3
To provide competent person in the " A4" category for
DAY 1
asistant to detect damage at Old Main Intake, Martello
and other 22 sub station Ring Besar at Kuantan Air Base

4 End termination for transformer HT side using heat


SET 1
shrink termination kit

5 Full report related to the incident of medium voltage


LS LS
power outage at Kuantan Air Base

JUMLAH NILAI KERJA HARGA MENGIKUT HARGA DIPERSETUJUI

…………………………………………………………….
(Tandatangan Kontraktor & Cop) Tarikh :…………………………………