You are on page 1of 19

2013/8/13

Fiberhome DAS Solution

Company History

Company History of FiberHome Technologies


 Radio Network Engineering and Products division of Telechoice
International (wholly owned by SASAC)
Fiberhome Iran Branch
 Branch in Tehran with field offices
 Staff strength at almost 70
 Specializes in radio network planning, design, implementation and
management for operators and equipment vendors

1
2013/8/13

FiberHome RAN Products Track Record

– China
• National Olympic Stadium

• 2010 Shanghai World Expo

• Guangzhou Baiyun Airport 3rd Terminal

– Iran
• MCI Wireless Repeater

• Private Communication System (IIRR)

Contents

Fiberhome IDAS Solution


• IDAS
• Wireless Repeater Solution
• Passive IDAS Solution
• Active IDAS Solution
• BTS Hotel IDAS

Fiberhome ODAS Solution


• BTS Hotel ODAS

2
2013/8/13

IDAS Solution

Mobile Communication Road Map

<10kbps <200kbps 300kbps-10Mbps <100Mbps 100M-1Gkbps

2G 3G 4G
3GPP IMT-Advanced
FDD

WCDMA HSPA HSPA+ LTE FDD LTE+

GSM GPRS
GPRS/EDGE

TDD TD-SCDMA HSPA HSPA+ TD-LTE TD LTE+

BWM(OFDM/MIMO)

3GPP2 IS-95 UMB UMB+


cdma20001X DO Rev A DO Rev B
cdmaOne

DO
Rev 0

Remark: Incompatible IEEE 802.16e 802.16m


802.16

IDAS Solution

Indoor Signals

Mobile Signal

Space Transmission Loss

Effects of Multipath

Noise Interference

Penetrate
Loss

High Frequency
High Attenuation

How to improve the indoor mobile


signal?

3
2013/8/13

IDAS Solution

Definition of IDAS

 Indoor Distribution Antenna System, distribute mobile


communication signal inside of buildings to coverage the blind
area & shadow area, use more steadily quality signal to collect the
indoor mobile traffic.

 Most important system of traffic and income source for Operators


all over the world.

Why IDAS?

 In 2G network
Traffic Analyze
− About 70% of Voice traffic come from Indoor.
− About 30% of Voice traffic come from outdoor.
 In 3G network. 70% Indoor
− About 63% of Data service come from Indoor. 30% Outdoor
− About 35% of Data service come from outdoor.
 ABI Technology Market Research
− World DAS market goes to more than $9 billion in 2014.

IDAS Solution

Different Applications

 Small Building, Villa, Shop … …  Office, Apartment … …


 A lot of Traffic  A lot of Traffic
Small Medium
 Qty. of ANT < 20 pcs  Qty. of ANT around 100 pcs

Wireless Repeater
Passive IDAS
IDAS

4
2013/8/13

IDAS Solution

Different Applications

 Shopping mall, Residential… …  Airport, Stadium, Stations, Metro


 High Traffic  HighTraffic
Large Typical
 Qty. of ANT > 150 pcs  Special Coverage

Active IDAS Digital BTS Hotel

IDAS Solution

IDAS system
 low traffic Wireless Repeater IDAS
Features
 Sample system constitute

Application  Small Building, Villa … …

Donor coupler
Antenna

splitter
Wireless
Repeater
antenna

 Easy & short time Installation


 Low investment of CAPEX*
Advantage
 Wireless Access

CAPEX* Capital Expenditure

5
2013/8/13

IDAS Solution

IDAS system

 Donor Antenna, access the Donor


donor signal from outdoor BTS.

 Repeater, filter and amplifier UL


& DL signal for indoor coverage.

 Feeder, transfer IDAS signal.


Antenna
 Components, splitter, coupler…
… distribute and balance IDAS
signal.

 Antenna, transfer and receive Feeder

UL & DL signal. .

Repeater

IDAS Solution

IDAS system

Passive IDAS Active IDAS

6
2013/8/13

IDAS Solution

Passive IDAS system


Antenna
 BTS, provide the access source.

 POI, Pint of Interface combine


multiple band signal and multiple Components
Operator signal.

 Feeder, transfer IDAS signal.

 Components, splitter, coupler…


Feeder
… distribute and balance IDAS
signal.

 Antenna, transfer and receive


POI
UL & DL signal. .

BTS

IDAS Solution

Passive IDAS system


 medium traffic
Passive IDAS
Features  Sample system constitute

Application  Medium buildings, basement

 BTS output power limited


 BTS room required
Consider
Single BTS, 800~2500M Components & Antenna  Capacity low efficient

7
2013/8/13

IDAS Solution

Applications

 BTS Power was limited.

 Large Building, Modern office, Shopping Mall,


Stadium, Urban Residential.

 Metro, Rail way station, Airport.

 Antenna Qty. > 100 pcs

QESTION ?
 BTS Output power not enough.
 A lot of RF loose in feeder
transmission.
 Cost of RF feeder so high.
 Increase BTS cell cost so high.

IDAS Solution

Active IDAS system


 high traffic
Active IDAS Features  Large system constitute

 Large buildings, Urban


Residential, Shopping mall
Application
 Stadium, Metro, Stations

Fiber Transmission, Active equipment extend the


BTS coverage.
g

8
2013/8/13

IDAS Solution

Upgrade of Active IDAS system

Active IDAS Multiple Band Active IDAS

coupler

GSM BTS

Combiner
splitter
DCS BTS
antenna
MU

UMTS
OFC

RU

IDAS Solution

Upgrade of Active IDAS system

Multiple Band Active IDAS


 Keep using
Components
 Passive component and feeder
&
Antenna suitable for 800~2500MHz

coupler

 Additional
GSM BTS
Combiner
Combiner

 Dual or Multiple band access splitter


DCS BTS
antenna
MU

 Upgrade to Dual or multiple UMTS


band OFC
 GSM900 & DCS1800 &
Equipment
UMTS2100 Fiber Optical
Repeater
RU

9
2013/8/13

IDAS Solution

Digital BTS Hotel IDAS Applications


City Center Neighborly Building  High Traffic
 Large Area
Features  Centralized Population
 Huge Qty. Antenna & Investment

Each building need BTS and BTS


High cost Room ? If not, more feeder
required, more loss in feeder.

Sky Building Urban Residential

Frequency Much Frequency resource


Resource required for each building ?

System Different BTS room require


Maintenance Monthly Maintenance in one site.

IDAS Solution

Digital BTS Hotel IDAS system

City Center

BTS Hotel

Main
Remote Unit Twin Building
Unit

Neighborly OFC
Building

Remote
Remote Remote Unit
Unit Unit

10
2013/8/13

IDAS Solution

Digital BTS Hotel IDAS system

RF
GSM

DCS Digital
RF

UMTS RU1
splitter
MU
LTE antenna

RU2
Digital Signal System

Long Fiber Link Budget 20km

Multiple Frequency Band


RU20

IDAS Solution

BTS Solution & BTS HOTEL Solution

Each Building Invest BTS and Room


Low Investment
More Cost For BTS Room Construction
HIGH COST
Invest More in OPEX

Double Invest BTS in Dual Band System Centralized


Management
Complicated Frequency Planning

Medium Building Waste More Capacity HARD


OPERATION
Complicated Extend Capacity
Multiple Band
System Support
Separated BTS Maintenance Place

11
2013/8/13

Contents

Fiberhome IDAS Solution


• IDAS
• Wireless Repeater Solution
• Passive IDAS Solution
• Active IDAS Solution
• BTS Hotel IDAS

Fiberhome ODAS Solution


• BTS Hotel ODAS

ODAS Solution

Our Goal

Large floor space for BTS


Fewer towers, More
beauty

More Antennas, Not Nice


Environment

Crowded Cables

12
2013/8/13

ODAS Solution

Appearance Changed

Streetlight

 Beautiful Appearance.
 Multi-System Optical Digital Repeater,
Higher Integration.
 Provide UPS/Batteries protection(8 Pieces
of 12V 155AH Batteries, supporting 4 hours
backup).
 More Functions Provided By Camouflage
Tower

ODAS Solution

Camouflage Tower VS Classic Steel Tower

Classic Steel Tower Camouflage Tower


People’s Recognition Looking ugly, Low Pleasing to the eye, High
recognition recognition
Level of Integration Low Integration, complex High Integration, Simple
structure structure
Value‐added Services None AD. , Streetlight, etc.
Difficulty of Site Large floor space for BTS, Anywhere ,Small footprint, Land
Selection Land acquisition difficult acquisition easy
Difficulty of Construction is difficult, Construction is easy, short
Construction long construction period construction period
Difficulty of More equipments, more less equipments, less faults, less
Maintenance faults maintenance work
Cost of Construction More materials, more costs Less materials, less costs

13
2013/8/13

ODAS Solution

Proposed Solution for BTS Hotel Project

 Proposed solution is a Hybrid DAS Design


 Combination of Active and Passive DAS
 Maximize Technical Effectiveness of Active DAS and Retain Manageability
and Reliability of Passive DAS systems
 Multi-operator capable with multi-band support for iDEN800,
GSM900/1800,CDMA800/1900, UMTS2100 and up to 2.6GHz radio systems.
 A single MU can support 20 RUs
How we view Base Station
Hotel?
 Simple site acquisitions at CBD areas,
gated communities and semi-restricted
areas.
 Operator requires coverage, capacity,
filler, and (or) new wireless technology i.e.
4G LTE.
 Operator needs share BTS Capacity (BTS
serves both outdoor and indoor).
 Enables amplifier sharing and non-
scenarios for added cost savings and
smaller equipment footprints.
 Operator requires Indoor DAS/IBS
enhancement for Wireless Data 3G/HSPA,
4G LTE, CDMA Rev. A/B, WiFi.

ODAS Solution

Proposed Solution for BTS Hotel Project

Flexible access mode

GSM BTS

DCS BTS

UMTS NodeB

28

14
2013/8/13

ODAS Solution

Proposed Solution for BTS Hotel Project


Flexible networking mode

According to the optical fibe


r resources, we have
adapted flexible networking
mode, for saving fiber resou
rces to maximize.

2013/8/13

ODAS Solution

Up link noise analysis

RU QUANTITY OF WCDMA SYSTEM(BTS OUTPUT POWER LEVEL:40W,RU OUTPUT POWER


DL gain-UL gain(dB) LEVEL:40W)
8 9 10 11 12 13 14 15 16 17 18 19 20
5 -98.9 -98.4 -97.9 -97.5 -97.2 -96.9 -96.5 -96.3 -96 -95.7 -95.5 -95.3 -95
6 -99.9 -99.4 -98.9 -98.5 -98.2 -97.9 -97.5 -97.3 -97 -96.7 -96.5 -96.3 -96
7 -100.9 -100.4 -99.9 -99.5 -99.2 -98.9 -98.5 -98.3 -98 -97.7 -97.5 -97.3 -97
8 -101.9 -101.4 -100.9 -100.5 -100.2 -99.9 -99.5 -99.3 -99 -98.7 -98.5 -98.3 -98
9 -102.9 -102.4 -101.9 -101.5 -101.2 -100.9 -100.5 -100.3 -100 -99.7 -99.5 -99.3 -99
10 -103.9 -103.4 -102.9 -102.5 -102.2 -101.9 -101.5 -101.3 -101 -100.7 -100.5 -100.3 -100

RU QUANTITY OF GSM SYSTEM(BTS OUTPUT POWER LEVEL:40W,RU OUTPUT POWER LEVEL:40W)


DL gain-UL gain(dB)
8 9 10 11 12 13 14 15 16 17 18 19 20
5 -111.7 -111.2 -110.8 -110.4 -110 -109.7 -109.4 -109.1 -108.8 -108.6 -108.3 -108.1 -107.9
6 -112.7 -112.2 -111.8 -111.4 -111 -110.7 -110.4 -110.1 -109.8 -109.6 -109.3 -109.1 -108.9
7 -113.7 -113.2 -112.8 -112.4 -112 -111.7 -111.4 -111.1 -110.8 -110.6 -110.3 -110.1 -109.9
8 -114.7 -114.2 -113.8 -113.4 -113 -112.7 -112.4 -112.1 -111.8 -111.6 -111.3 -111.1 -110.9
9 -115.7 -115.2 -114.8 -114.4 -114 -113.7 -113.4 -113.1 -112.8 -112.6 -112.3 -112.1 -111.9
10 -116.7 -116.2 -115.8 -115.4 -115 -114.7 -114.4 -114.1 -113.8 -113.6 -113.3 -113.1 -112.9

15
2013/8/13

ODAS Solution

Antenna analysis

 Support Multi‐Band network

 Easier upgrade network

 Reduce the inference between antenna

 Decrease the quantity of antennas

 Lower construction investment

 Shorten the construction period

Camouflage Multi‐Band
Pole Antenna

ODAS Solution

Equipment analysis

 Master Unit supports up to 3-systems over a dual-core fiber-


optic cable
 More effective use of fiber-optic infrastructure
 Each MU supports up to four 3-bands RUs
 All devices remotely manageable, configurable and monitored
 Remote Units support any 3 systems of
CDMA800/GSM900/DCS1800/CDMA1900/WCDMA21000 in a
single box
– Each band is individually adjustable for attenuation and gain
Flexibility to achieve target radio coverage across bands
 Up to 40W (46 dBm) downlink power per band
 Remote unit support up to 50MHz for WCDMA. If the WCDMA
band is more than50MHz, more remote units would be needed.
 Less RUs required to achieve coverage
 Lower CAPEX
 Less clutter and simplify maintenance

16
2013/8/13

ODAS Solution

System reliability analysis

Equipment Passive components

MTBF >50000 Hours >100000 Hours

Working ‐40℃~55℃(Outdoor ‐35℃~65℃(Outdoor

Temperature Remote Unit) Remote Unit)

Ingress protection IP65 IP65

UPS capability 4 Hours

ODAS Solution

System Reliability Analysis

 Height  Anti-corrosion
capacity
8~15m Optional
Hot galvanized anti-
 Anti-Wind capacity corrosion treatment;
The zinc layer
Wind scale: 12 thickness not less than
Provide better 86 microns
stability
 Lightning  Tower bearing
protection capacity
and grounding
Max hanging equipment
Adopt lighting rod weight can be up to
Bottom conductor 1500kg
grounding

17
2013/8/13

ODAS Solution

BALI BTS HOTEL Telkomsel

Bali Island is the most shinning island of 13600 islands in Indonesia,and is a famous tourist
resort. Bali Island is at the east of Java and 1000km away from the capital city Djakarta.

ODAS Solution

BALI BTS HOTEL Telkomsel

Cell 1

Cell 2

Cell 3

18
2013/8/13

ODAS Solution

BALI BTS HOTEL Telkomsel

Thanks!

Wuhan Hongxin
The Expert in Wireless 
Communication Solution

19

You might also like