You are on page 1of 25
FORM U-1A MANUFACTURER'S DATA REPORT FOR PRESSURE VESSELS (alternative Form for Singlo Chamber, Completely Shop or Field Fabricated Vessels Only} Fi* ‘As Required hy the Provisions of the ASME Cade Rules, Section Vil, Division + 1. Manulsclres end ceri by National Tank Company Highway 287 East Electra, Texas 76360, ‘one AMREYA, Alexandria, Egypt (bi ant Sac of purchaser) 2, Manulaciuresfor Sigma Petroleum General Free 2. Location of instalation Egypt : ‘ype: Horizomal EL2H490803 : EpO90663.R 2 50870 2009 Inor2.orvert any (ge sera! No. (cris ‘Crewe o (iat. No} (Year tat 5, Tne chemical ard pryeical propories of ll pare mest the raguicements of material “specications of the ASME” BOILER AND PRESSURE VESSEL CODE. The design, consirucion, and workmanship conform t ASME Rules, Section Vil, Division 1 20017 aie peepee srt gacsteGe 70 None Lanio0 ‘ecres sean Op Bu spe! ie Noe NA DBL Sp) ‘Lang. Wieled, Dbl RT. (Spat or Ful} FIR) KT.Temp.@F) Time the) Sih (Welded Di AT ISo0, Eh No.of Courses, hes: Wa sassi6G470 te : eke easel Been roe |g" ee E a ae “ps wa eee i eae leenera sy 7 Teale mecca een never Butte, Crain or Sie Tye Mat. Tak, i Mat aamened 1 Cocation ino | cutsown | santensan rn ee) Gora Ciwn | Savasmaree woe : se ee Gricnn canenras a ° Sec eee CLISOWN —_ SavoEBISAOS co 7 7 ee GiisowN | Sainensaes co 7 os a pect Waneay S066" % woe e See "icton Fancwaseel | sqsieon73 ou = me ee eee eae eee ees eee tresor na) ey 0) oscres) ners ara ho) Remarks: Manufacturers Pata Data Reports properly identified and signed by Commissioned Inspectors have been furnishat for the folowing fers of the report None (hems of pr itm ui i? 120°OD X 35"-0" S/S X 75# Horizontal Emulsion Treater “UW-16.1. Vessel constructed with no corrosion allowance, UG-20(1} & UCS-66(e) Exemption from impact testing. CERTIFICATE OF SHOPIFIELD COMPLIANCE We certly thatthe satements made in ths reson are corract and that ai Geta of design, mate, constuction, and workmanship of his vessel conform 10 ine ASME Coca or Pressure Vesees, Secton Vl Dison 1. "U' Caroste of Auhorzston NO. 19,76 erg 12131 2012 cae //~BO-O7 co name Nations! Tank Company | ‘Sioned Ay CERTIFICATE OF SHOPIFELD INSPECTION aa ‘esse consivvted by National Tank Compeny a Highway 287 East Blcerra, Texas 16360 {tne uedas ned, holding 2 vad commission ved by he National Board af ier ané Pressure Vessel species aor the Set of Provina at Texas nd enone 6 OneBeucon America Insurance Lyn, MA nave inspected thecomponent descrbed nts Manufacuters DataRepor on = «SE. @ Pansat iat, ote best of my knowadge an bbe, he Monuiacturerhas constructed iis pressure vessel in aecaréanee th ASNE Code, Section Vl, Division 1. By signing ins cerficate neither the Inspecter nor his ‘employer makee any watrany,expressadorimpliedraoncering the pressure versal dascribedin this Manutacturer's Data Report Furthermore neler the Inspector hor his emoiayor chal beable in any manne, fof ay persagalinuny or eoogtly damage oF a loss of any kind zrising from or comnepted with this inspection. dae f= ef. 7.0. Signed Connsslens WLP @5D2 MIE TE 0b i rt eneero Sel Hod $a ma 97 a ar Fecsaeaae year aa F om {an wosiauaans eae NOLLVANSWNN9OG BNOWUDIMSNI TWAS ON S.WITTAS gisd 972d #1831 QUOA SNOLLOBNNOI | wy Aq) AQ | AO dS ge sae sega geese USEnE SCE SCEDIGUIEE O02 eC ti| ReCeTTE ee To oadEvib yw 92-75 —_ 90-4558 018 Wea e| Go-\S5E0I Sle |FEeeeeeeS ac ee Lee 60a BUSS) Seis ws ou a ; bad Seepage seers sae spe see ped server #82 | ee eedeCveEL Ee BRYANT WaKs | ise aeee ec sae od ee (aeveseaetl| Aa jesse SL [ a ee _*-f—eu 29908003 : Eee Aso: aST§| GES * 00.021 e ~_WOBOVOBEH 1 2 aS SETS HS) oy sa gigvS et it __0lHoS ,.| owas tiv) ary oak ___| Hee 09 09 04) STINISIVS TLVIdaWv! __ SU3SWWNN NOLLVOILNIGL WiYELVW dud = uaouyu [ ae ON(X) S3Ai } GauInDay LNIMLVIEL LV3H | joaieg euudis a Ha) Lal} UNC) unt) 30N Bao AH1) cAHadvHDoIOWY | EX OOO AZ INOW) PL) CLutK) Zul “Tosovesra2 “ON Twas TassaA| ere OOLVN G@aYOOTE NOLLIGdSNEGNY NO WNUAVXE EXAMINATION ANDINSPECTION RECORD Serial No. :_EL 2H490A03-01 Dwg. No:__e0090663 RA~2> OPERATION [ ~_ EXAMINATIONS INSPECTIONS i NATCO fo AL DATE Fab | Date Insp Date | | a Sp | Gas | ooai09 | | ee i | | | tonsa gis i B 1b Bb-b9 | cnseiiag on G2 ea Geel 1038-09, | she tias-settis GE Boe “Wa-3b07 OV | 72/82 EN. 2Head~Sballfinp GS 1 fe-0% CAM | 1-90-09 Br— |v 78 IA’ | 9.2009 Ad ont | 10, se i | | | [tae ae {PD | A [2-97-08 | | A po-ss08. | i wre 8 erie avout ip $s ang 12, alin nie 3, inensnal One Era {| 4 £e | sewage | ima Era a | j | 17 AL ECDs inerperatd int fabigation i | [ume 78 (O93 | | ieee | susrnaun cae Lye _|it-ates A W9| pe | f--70 | | sna WO Romess ulte ‘pa lates (25; 2 eg [22 water] fi 26-09 Bx —| 1, ge 22, fi Bay geen at ao CH 1 A509 | br pe BO. tem: Chak SBR like piel ines omit rye bet Ela, Bandai li evised errd amd eco. a20-0% G4 Note: Ail appicble exaninations by NATCO are mandatory, and shal be noted when each operation is complet. The Authorized Inspector may designate mandatary inspection points by oxtendiag the appropiate fines and acknowledge his acceptance where nate. Fone QRO18 Re 1107 ‘BONDED tuseecrion RADIOGRAPHIC sniconrorareD EXAMINATION REPORT si (IABP Of one JO SL-B8. Seam 7 : ik es Sereen Tok & Type BE suena FEC Min, Source to Oblect tance SFP” bin. Ostance Source Side Oe o FP er ded Maha evien Tes Mo j BOF Dae! Single of Double Wall Exposure: Filen Type Source Type: ‘No. of Film par Cassette: Single or Gouble Wall Viewing: & Acceptance: Section Secon Wi, Ox: FERED M2, ult er P1324 Seton V, rile 2Tble Powering 23 rer eee eee eee rts Seam ne ‘ont Sone [we cer or Seam we [ieee REE TERI me : Zz Terms & Abbreviations We =snadequate Penetcation St= Slag une OU = Outside Undercot IF = tocomplete Fusion P= Porosity Lc tow Crown, Br = Buen Throweh R= rack 5 = Concave Stringer SL = Slag Inclusions 1 = Internal Undercut WT = Wogan Tracks INCORPORATED: ERAMIWA UW ner unt git: L290 AB? Date. F FO Beant ZZ, 32). Thk S37 Fim Type Ago Sorwen hk & Type: you Physical Source Size: -//F Strength 7H 2 Nin. Source to Object Distance, ‘Source Type: Je 1¥e Time: Zs Min, Distance Source Side Object to Fimazer ” Fen: s Shin The 2 MJeld hecakerceneat 2 - ‘evel: ZZ Revinyepher~—Z Interpreter, Le Level: hi Retien —— Date ar NATCO Review: ie 107 -0F Date: See ‘No. of Film por Cassette Single of Double Wall Exposure: ‘Single or Double Wall Viewing: i J Acceptance: Section Vili, Div. 1 UMEARoils built per APL 12-K Section V, Article 2, Table 9.1 Power Piping 8-31.1, interconnecting Piping B-31.3, Bonded Inspections, inc. Procedure RT P 10. Seam Ho, ‘Seam Neo. Seam @ | WE | ACCEPT [REJECT Semi | We | ACCEPT REJECT | i esac | f et | 717271 | | c I Par aia 4 | | { | I = |72 4 | I [Baer a i i | 1 i ee ee 1 | i “Ferms & Abbreviations 1P = inadequate Penetration SL = Slag ine IF = compete Fiion P= Posty BT = Burn Through : SL = Slag Inclusions WT = Wagon Tracks dkt3 he 301207 sonoeD muspECTION RADIOGRAPHIC tucogporareo EXAMINATION REPORT sm ZA 6 AOF wre Jf 122036. Seam 6 AS These a Fim Type ‘Screen Tk 8 Type ody Physical Source Se L22 Strength: FEO Bee Source type Boe ; : Iain. Source to Object Ostance > ‘Mie Dintance Source Side Object to Film Z Pen Sum Tak) Weld Reintorcement adiogranner A ae inspctions, We Procedure ATP 1. Seam ha RECT accerr soNDED inspection RADIOGRAPHIC tconrorereo EXAMINATION REPORT swe LYfG 2 fos oxe_ Ae OF Seama Za-f Tne 0. i zim toh Sean Th 8 ee o/h Physical sovke ce BE Cy Pi Sowce type $r-/4Z : Bin Soure ta Obeet Ontance JF ZS Time: Jones ‘in Oita Source Side OecttoFiim Ze fen ZOS “Shim td Weld Reinloresment Jr Rasonsaeties 7 agh y lel He pre INCORPORATED SIN: ZLZVIOLES. bate 52S Beant LLL OL md The JZ Fam type 2p Screen Thk. & Type: ora ‘Pheysical Source Size: WA Sweength: Ze Source Type: iA Win, Source to Object Distance 4g Time: pao in, Distance Source Side Object to Fim Pet ‘hin Tie ZZ Weld. Kesrbarcement Ke 2909 ZH ATCO Review: Wo, of Film per Cassette “Single or Doubie Wall Viewiog S ca < we ee fate fo = 0/8 a ‘Date Single of Double Wall Exposure: ¢ ‘Acceptance: Section Vii, Biv AMEE Riis built per API 12-K Section V. Article 2, Table 5.1 Power Piping B-31.1, tnterconnecting Piping 8-31.3, Bandod inspections, lac. Procedure, ATP 10. Seam Wo. | Seam No. Seam # we | ACCEPT. [REJECT _| Seamé | Wi | ACCEPT REJEST —_ {-—+—+ | [oi fecescteea gone eee Ne ioe ieee 7 +— [ ieee { I I wa aaa | r — | | | +t i I I - eee L I I t | ze] { { 1 “ Terms & Abbreviations BF = adequate Pensa SL Sip ie ov = sie niet FF = locale Fusion = Paeiy 1c kn Gown BT = Bum Tewugh GR = Crack CS = Concave Stings! {A= tetera! Undereat WT = Wagan Trasks SL = Slag Inclusions (4.13 for, 30112003 NATCO ELECTRA AIR TEST DOCUMENTATION JOB ORDER: dainty 21 4G ACS -ON We certify that weid(s) or components checked below were air tested at 5 psi and there were no leaks or leaks repaired. Cinozzie Repads (list) OPipe Line(s) (list) Before assembly After assembly {circle one) Dlinside t-pak box, corners at top of bath section at 5 psi. [XlFiretube at § psi (1-Pak water bath section before assembly Stack heater (internal chamber) Clother NATCO: Date: 18.27.08 Witness: és Date: (/ 2eq Clafter Assembly, Connections made during assembly at si Orpa water bath section after assembly NATCO: Date: Witness: Date: Separator S/N Coil S/N Scrubber S/N House. Form MEG-12 Revision @ O23 NATCO ELECTRA AIR TEST DOCUMENTATION JOB ORDER: 2u44o4gs -02 We certify that weld(s) or components checked below were air tested at ___5 __psiand there were no leaks or leaks repaired. Cnozzte Repads (list) ClPipe Line(s) (list) Before assembly After assembly (circle one) (Clinside t-pak box, corners at top of bath section at 5 psi. XJFiretube at 5 psi (it-pPak water bath section before assembly (Cistack heater (internal chamber) Other NATCO: Dreseo 19 ces Les, Date: //-4-095 Witness: ane SC LLE_ vue: UaY-O 7 |After Assembly, Connections made during assembly at psi T-Pak water bath section after assembly NATCO: Date: Witness: Date: Separator S/N Coil SIN Scrubber S/N House Form MFG-12 Revision © Dams HYDRO TESTING FORM r We certify that the component (work order # LHP OAS FZ ) has been, aig watertested In compliance with ASME Code and NATCO procedure-described on the face Of the blueprint. Description: Tested in the _ Venrical HonizonTat position. (Please circle one.) Design Pressure or MAWP: £ Psia Hydrostatic Test Pressure: 4 Psi Witnessed by: | NATCO Test Area” NATCO QC. Customer Rep. — NOTE: INDIRECT HEATERS REQUIRE 100 PSI APPLIED TO PRE-HEAT LINE AFTER BEING FILLED WITH WATER & BATH SECTION EXAMINED FOR BUBBLES. HYDRO SPLIT COILS TO ASSURE CHOKE STEM AND SEAT ARE HOLDING PRESSURE. REMARKS: gray pK, NS L Lob Be Fe hh : a eel NATCO HYDRO TESTING FORM : Bo ) has been d NATCO procedure-descrbed on the». | | We cgetify that the component (work order # air/y/atep tested in compliance with ASME Code an face of the blueprint | Description: Aweter ue | Tested in the — VERTICAL “Plonzon7al) position. (Please circle one.) sition. (Pre emer | | Design Pressure or MAWP: PSIG | | = | Hydrostatic Test Pressure: PsiG | ! i i | Witnessed by | | i | | | | NATTO Test Area x Bas Date NATCO Q.c. Lad Gime Date _ Date Customer Rep. NOTE: INDIRECT HEATERS REQUIRE 100 PSI APPLIED TO PRE-HEAT LINE AFTER BEING FILLED WITH WATER & BATH SECTION EXAMINED FOR BUBBLES. HYDRO SPLIT COILS TO ASSURE CHOKE STEM AND SEAT ARE HOLDING PRESSURE. as | REMARKS: : : |" Cogs} = 200. | al : i : eee ie vIN ‘ewe aH wa ABE f ! t vIN OCUNIN) HHL WS LM vIN vine VIN ‘SW - 31WOUd HOHONY ' ! 1 1

You might also like