a. Minimum cycle time = 2,4 minutes ; Maximum cycle time = 18 minutes
450 min per day b. Output rate (max) = = 187.5 units per day ≈ 187 units per day 2.4 min per day 450 min per day Output rate (min) = = 25 units per day 18 min per day Maka range output rate nya = 25-187 units per day 18 min c. Workstation needed = 450 min per day ( ) 187 min per day 18 min Workstation needed = = 7.481… workstations ≈ 8 workstations 2,406 450 min per day d. Cycle time = = 3.6 minutes 125units per day e. If cycle time is 9 minutes : 450 min per day Output rate = = 50 units per day 9 minutes If cycle time is 15 minutes : 450 min per day Output rate = = 30 units per day 15 minutes