ANGGARAN BIAYA & PRASARANA UNTUK SWALAYAN PRO
RAKYAT (PT. SPR) /1 SPR TIPE A - TYPE B & TYPE C:
NO ITEM
JUMLAH
ITEM
DESKRIPSI
HARGA
‘SATU SET
KOMPUTER
KASIR
SATU UNIT
Processor Intel Core i5 650 3.2 GHZ>
Motherboard BULDOZER H55 >
Harddisk 500 GB Seagate >
‘Memory RAM 4 GB Hynix >
Casing New Avaris 450 watt >
LED Monitor Nathans 16 Inch (Garansi resmi
1
Tahun) >
Keyboard & Mouse usb new >
Program kasir IPOS 4.0 >
Printer Termal QPOS 58mm New >
Laci uang securebox new >
Scanner barcode Auto sense plus stand
Rp. 8.775.000,-
ccrv
iser
PAKET 8CH HDD 1000GB
CAMERA AHD IR 3megapixel
RESOLUSI 720
1 UNIT DVR 4CH
SUPPORT INTERNET ANDROID 10S
1 UNIT HARDISK. 1000GB
2 UNIT CAMERA AHD INDOOR
3Megapixel
2 UNIT CAMERA AHD OUTDOOR
3MEGAPIXEL Kabel + Power (50M)
1 unit Power Suply 10A 8 pe
BNC drat taiwan 4pe
Jack de
DAN CCTV GARANSI 1 TAHUN.
FREE KABEL HDMI 15M DVR
Rp. 3.731.700,-
Paral Pihiak Pertama
FPibak Kedua
LFPAKET
RAK
SUSUN
31 TEM
NOTE:
-Harga untuk 1 unit Rak Single Starter Tinggi
120em
-Ukuran
Model single (satu sisi/satu muka), ukuran:
(t) 1200mm x 900mm x (1) 410mm,
(®) 1500mm x 900mm x (1) 410mm,
(®) 1800mm x 900mm x (1) 410mm,
(200mm x 900mm x (1) 410mm,
-Bahan dasar material COLD ROLLED
STEEL
(Besi Baja)
Finishing, lapisan akhir cat menggunakan
POWDER COATING
Sistem pemasangan KNOCK DOWN
(Mudah dibongkar pasang, tanpa bau!)
Kapasitas penyimpanan 40 KG PER LEVEL,
Standar 1 Set Rak Single (satu sisi / muka)
terdiri atas 4 level,
1 Set Rak Double (Dua sisi / muka) terdiri atas
8 level
~ Lebar keseluruhan rak : 41cm
Rp. 51.851.000,
Paraf Pi
lak Pertama
hak KeduaKetebalan SHELF: 0.6 mm
= Ukuran UPRHT / TIANG: 3x6 em
= Ketebalan UPHRT / TIANG : 1.5 mm
- Diameter jaring: 3 mm
- Kualitas terjamin bersertifikat ISO dan TUV
4.| KACA, PINTU | 7METER, | Kaca Tempered 10 mm sudah termasuk
KACA bbahan/material
PINTUKACA | Kaca 12mm
1 SET Frame less
‘Aluminium sisi atas
dan bawah pinta
No Fitting TOTAL
Handle custom ukuran jarak AS
Floor Hinge Rafes England Baru Rp. 19.247.800,-
5 SATUUNIT | Genset Rp. 13.433.750,-
Open
New
Merk
Maestro
MT9O00LE,
Output 6.600 Watt 220vae Iphase
6|PEMASANGA |SATUSET | Rp. 12,842,000,
NLISTRIK,
PLN
7.[INSTALASI | SATUPAKET | - Rp. 3.929.000,-
LISTRIK 10
TITIK
MATERIAL
DAN JASA
TUKANG
8. NEON BOX | SATU UNIT | Neon Box Papan Reklame komplit lampu, ballas | Rp. 5.893.000,-
2X3 METER, & travo
9. | KABEL 3GULUNG | Merk Supreme nym 3x2.5 panjang SOM Rp. 3.830.000,
SUPREME
3X2.5 MM
To TV SATU UNIT _ | Samsung UA43NS001 TV LED (43 Inch) Rp. 7.857.000,
kualitas resolusi Full HD 1920x1080
Unique Selting Point TV LED 43 Inch
1920x1080 (Full HD)
Connect Share Move
Digital TV (DVB - T2)
Dilengkapi dengan port USB dan HDMI
Konektivitas HDMI 2 USB dan HDMI
Component In (YIPb/Pr) |
Composite In (AV) | Ethemet
(LAN) N/A Digital Audio Out (Mini Jack)
tal Audio Out (Optical)
1/ Cable input)
0/0 Ex-Link (RS-232C) N/A C1
Slot NA HDMI A/Return Ch
Support N/A HDMI Quick Switch
N/A Wireless LAN Adapter
Paraf Pihak Pertama Paval Pihak Kedua
€‘Support N/A Wireless LAN Built-in N/A (HDMI-CEO)|
NIA
fi
BILLBOARD
3X1 METER
Kerangka : Pipa Besi Kotak Hollow +
Catover : Plat Aluminium
Gambar : Banner Vinyl Frontilite Digital
Printing / Sticker / CatFrame : List Stainless
Steel Sisi Keliling Gambar
Rp. 3.636.000,
SATU SET MEJA\
KASIR
SATU PAKET
Spesifikasi
Material besi, finishing cat powder coating Warna : meja|
merah, shelving depan hitam (bisa custom / request
\warna sestai keinginan) Ukuran:
panjang 5.5m x lebar 1.2m x tinggi 80cm
Rp. 38.809.700,-|
fis
‘SHOWCASE 3
PINTU
2 UNIT
DAIMITSU DISC-9800
‘Net Liter: 1.000
Voltage Frequency
Dimensi WxDxH-1520x620x2120 mm
Voltage: 220-240 V/S0 Hz.
Daya Listrik: 389 Watt Handle-Lamp-Lock
Cooling System: Defrost
‘Total Rak 15
Berat: 142 kg
Garansi Resmi Daihatsu
Rp. 44.191.200,,|
lia
AC
4 UNIT
TG INVERTER 1/2 PK TO6EMV
Rated Voltage / Frequency 1, 220V, 50Hz Cooling
Capacity (Min-Max) 9,200
(2,430-13,780) Btwh
Power Input 350 W Running
Current 3.8 A EER 17.00
Buh
Energy Grade
Power Supply 1, 220~240V, 50 Hz
Moisture Removal 1K g/h
Setting Temperature Range 16 C-30 C
Timer 24hr Ov/Oft
Indoor
Air Flow Rate 1m3/min
‘Sound Level (Noise) 36/30/24/18 dB(A)#+3
Net Weight 9 Kg
Dimensions 837*302*189 mm
Outdoor
Air Flow Rate 28 m3/min
Sound Level (Noise) 474B(A)+3,
Net Weight 23.5 Kg
Dimensions 720*500*270 mm
Rp. 30.262.000,
Paraf Pihak Pertama
Paraf Pihak Kedua
z
qT- Bahan Aluminium Tebal
- Dapat ditekuk dan dibentuk sesuai Keperluan
~ Anti Karat
~ Ketinggian Tanga Dapat Diatur
is FILLING (4 UNIT Material Plat Besi Ketebalan 0.6mm Rp. 11.785.000,,
KABINET Finishing Powder coating
4 Drawer Central Lock i
Rel Laci Bes
Dimensi W 45 x D 62 XH 133 em |
fie [ALAT SATUUNIT | SKGKARBONDIOKSIDA (COA) - Set Rp. 1.515.500,
PEMADAM Kompli
KEBAKARAN Ready Stock - TONATA Karbondioksida (CO2) APAR|
KG Set Komplit,
Set Komplit:
1. Tabung APAR (CO2) 5Kg-+ 5Kg Gas
Karbondioksia
2. Pressure Gate
3. Selang dalam
4, Nozzle
5. Leher tabung
6. Fire Extingusher Holder (SKG)
7. Safety tag
8. Keterangan Refill
li7 KURSIMEIA [2 UNIT ‘Kursi Kantor hidrolik dan mekanis Rp. 1.813.000,-
Kaki terbuat dari stainless steel
Sandaran terbuat dari kain yang kuat dan plastik
Sangat nyaman saat digunakan
Pilihan warna biru merah hitam
Kursi bisa ayun mengikuti gerakan badan
Bisa untuk berat badan 110kg
lis TANGGA SATU UNIT _ | Kelebihan Produk Rp. 1.911.000,-
Paraf Pihak Perta
Porat’ Pihak Kedua
z.SUMMARY
Paraf Pihak Pertama
TOTAL ANGGARAN PROJECT PENGADAAN PT. SPR
NO ITEM HARGA
1 ‘Satu set komputer Kasir Rp 8.775.000
2 CCTV 1 Set Rp 3.731.700
3 Paket Rak susun Rp _51.851.000
4 Kaca, Pintu kaca Rp 19,247.800
5 Genset Rp 13.453.750
6 Listrik 6600 Watt Rp 2.842.000
7 Instalasi listrik 10 Titik Rp 3.929.000
8 Neon box 2x3 m Rp 5.893.000
9 Kabel merk Supreme 3x2,5mm 3 group |Rp 3.830.000
10 TVLED42Inch Rp 7.857.000
i Bilboard 3x1 m Rp 3.636.000
12 ‘Meja kasir 1,20x5,50 M Rp 38.809.700
1B ‘Showcase 3pinu 2 unit — Rp 44.191.200
14 ‘AC (4 Unit) Rp 30.262.000
5 Selling Kabinet (4 Uit) Rp _11.785.000
16 ‘Alat pemadam kebakaran Rp 1.515.500
7 Kursi kerja 2 Unit) Rp 1.813.000
18 Tangga Rp _ 1.911.000
SUB TOTAL Rp — 265.333.650
PPN 10% Rp 26.533.365,
PPH 2% — Rp 5.306.673
» DESIGN & Konsultan (4) Biaya Mupping | Rp 14.195.000
GRAND TOTAL Rp _311.368.688
DIBULATKAN [Rp _311.368.700
TERBILANG : Tiga Ratus Sebelas Juta tiga Ratus Enam Puluh Delapan Ribu tujuh
ratus Rupiah
Paraf Pihak Kedua
¢‘TOTALANGG: YUNG 100,000 Unit dan akan di laksanakan sb
1, TAHAP PERTAMA Sebanyak 50.000 unit
2. TAHAP KEDUA Sebanyak 50.000 Unit
3. Ready 5.000 unit siap untuk Laksanakan
4. Nilai kontrak kerja Rp. 20.000.000.000.000 (Dua puluh trilyun rupiah)
tersebut, adalah yang nilai Rp. 5.000.000.000.000 (Jima trilyun rupiah) untuk
pandanaan supply produck — produck yang di Distribusikan ke unit
SWALAYAN PRO RAKYAT yang (erdiri dari produck — produek : Pt.
Unilever, pt. Mayora, pt. Garuda food, pt. Dua kelinei, pt. Indo food, pt.
Indo fora food, pt. Jaffa confood
5. PELAKSANAAN dari TOTAL 100.000 Unit Tersebut kami selaku
MAINKONTRAKTOR UTAMA PT. SRI AYU SAKTI (PIHAK KEDUA)
Bersedia untuk melaksanakan dan Bersedia untuk Melengkapi kuota dari UNIT
— UNIT yang sudah Tersedia dari semua para SANTRI DI 28 PROPINST
SELURUH WILAYAH INDONESIA Atas dasar dengan kesepakatan
bersama Antara PIHAK PERTAMA dan PIHAK KEDUA Demikian
perjanjian SURAT PERINTAH KERJA (SPK) ini dibuat Serta Ni
KONTRAK KERJA nya, SATUAN HARGA PENGADAAN Dan RAB
ADDEDDUM ini Sebagai lampirannya, Agar dapat di lakasanakan sebaik —
baiknya dengan penuh tanggung jawab sesuai jangka waktu pekerjaan dalam
perjanjian ini, dengan itikad baik untuk dipatuhi dan dilaksanakan oleh para
pihak, Atas kerjasamanya kami ucapkan terimakasih.
Jakarta, 22 Oktober 2020
PT, SWALAYAN PRO RAKYAT PT.G
ESIK PUTRAJATIM,
PIHAK KEDUA
Pihak Penerima Perintah Kerja
‘Bambang Suratno)
Direktur Utama’
1 Pihak Pertam: Paraf Pihak Kedua
Le |