You are on page 1of 7
ANGGARAN BIAYA & PRASARANA UNTUK SWALAYAN PRO RAKYAT (PT. SPR) /1 SPR TIPE A - TYPE B & TYPE C: NO ITEM JUMLAH ITEM DESKRIPSI HARGA ‘SATU SET KOMPUTER KASIR SATU UNIT Processor Intel Core i5 650 3.2 GHZ> Motherboard BULDOZER H55 > Harddisk 500 GB Seagate > ‘Memory RAM 4 GB Hynix > Casing New Avaris 450 watt > LED Monitor Nathans 16 Inch (Garansi resmi 1 Tahun) > Keyboard & Mouse usb new > Program kasir IPOS 4.0 > Printer Termal QPOS 58mm New > Laci uang securebox new > Scanner barcode Auto sense plus stand Rp. 8.775.000,- ccrv iser PAKET 8CH HDD 1000GB CAMERA AHD IR 3megapixel RESOLUSI 720 1 UNIT DVR 4CH SUPPORT INTERNET ANDROID 10S 1 UNIT HARDISK. 1000GB 2 UNIT CAMERA AHD INDOOR 3Megapixel 2 UNIT CAMERA AHD OUTDOOR 3MEGAPIXEL Kabel + Power (50M) 1 unit Power Suply 10A 8 pe BNC drat taiwan 4pe Jack de DAN CCTV GARANSI 1 TAHUN. FREE KABEL HDMI 15M DVR Rp. 3.731.700,- Paral Pihiak Pertama FPibak Kedua LF PAKET RAK SUSUN 31 TEM NOTE: -Harga untuk 1 unit Rak Single Starter Tinggi 120em -Ukuran Model single (satu sisi/satu muka), ukuran: (t) 1200mm x 900mm x (1) 410mm, (®) 1500mm x 900mm x (1) 410mm, (®) 1800mm x 900mm x (1) 410mm, (200mm x 900mm x (1) 410mm, -Bahan dasar material COLD ROLLED STEEL (Besi Baja) Finishing, lapisan akhir cat menggunakan POWDER COATING Sistem pemasangan KNOCK DOWN (Mudah dibongkar pasang, tanpa bau!) Kapasitas penyimpanan 40 KG PER LEVEL, Standar 1 Set Rak Single (satu sisi / muka) terdiri atas 4 level, 1 Set Rak Double (Dua sisi / muka) terdiri atas 8 level ~ Lebar keseluruhan rak : 41cm Rp. 51.851.000, Paraf Pi lak Pertama hak Kedua Ketebalan SHELF: 0.6 mm = Ukuran UPRHT / TIANG: 3x6 em = Ketebalan UPHRT / TIANG : 1.5 mm - Diameter jaring: 3 mm - Kualitas terjamin bersertifikat ISO dan TUV 4.| KACA, PINTU | 7METER, | Kaca Tempered 10 mm sudah termasuk KACA bbahan/material PINTUKACA | Kaca 12mm 1 SET Frame less ‘Aluminium sisi atas dan bawah pinta No Fitting TOTAL Handle custom ukuran jarak AS Floor Hinge Rafes England Baru Rp. 19.247.800,- 5 SATUUNIT | Genset Rp. 13.433.750,- Open New Merk Maestro MT9O00LE, Output 6.600 Watt 220vae Iphase 6|PEMASANGA |SATUSET | Rp. 12,842,000, NLISTRIK, PLN 7.[INSTALASI | SATUPAKET | - Rp. 3.929.000,- LISTRIK 10 TITIK MATERIAL DAN JASA TUKANG 8. NEON BOX | SATU UNIT | Neon Box Papan Reklame komplit lampu, ballas | Rp. 5.893.000,- 2X3 METER, & travo 9. | KABEL 3GULUNG | Merk Supreme nym 3x2.5 panjang SOM Rp. 3.830.000, SUPREME 3X2.5 MM To TV SATU UNIT _ | Samsung UA43NS001 TV LED (43 Inch) Rp. 7.857.000, kualitas resolusi Full HD 1920x1080 Unique Selting Point TV LED 43 Inch 1920x1080 (Full HD) Connect Share Move Digital TV (DVB - T2) Dilengkapi dengan port USB dan HDMI Konektivitas HDMI 2 USB dan HDMI Component In (YIPb/Pr) | Composite In (AV) | Ethemet (LAN) N/A Digital Audio Out (Mini Jack) tal Audio Out (Optical) 1/ Cable input) 0/0 Ex-Link (RS-232C) N/A C1 Slot NA HDMI A/Return Ch Support N/A HDMI Quick Switch N/A Wireless LAN Adapter Paraf Pihak Pertama Paval Pihak Kedua € ‘Support N/A Wireless LAN Built-in N/A (HDMI-CEO)| NIA fi BILLBOARD 3X1 METER Kerangka : Pipa Besi Kotak Hollow + Catover : Plat Aluminium Gambar : Banner Vinyl Frontilite Digital Printing / Sticker / CatFrame : List Stainless Steel Sisi Keliling Gambar Rp. 3.636.000, SATU SET MEJA\ KASIR SATU PAKET Spesifikasi Material besi, finishing cat powder coating Warna : meja| merah, shelving depan hitam (bisa custom / request \warna sestai keinginan) Ukuran: panjang 5.5m x lebar 1.2m x tinggi 80cm Rp. 38.809.700,-| fis ‘SHOWCASE 3 PINTU 2 UNIT DAIMITSU DISC-9800 ‘Net Liter: 1.000 Voltage Frequency Dimensi WxDxH-1520x620x2120 mm Voltage: 220-240 V/S0 Hz. Daya Listrik: 389 Watt Handle-Lamp-Lock Cooling System: Defrost ‘Total Rak 15 Berat: 142 kg Garansi Resmi Daihatsu Rp. 44.191.200,,| lia AC 4 UNIT TG INVERTER 1/2 PK TO6EMV Rated Voltage / Frequency 1, 220V, 50Hz Cooling Capacity (Min-Max) 9,200 (2,430-13,780) Btwh Power Input 350 W Running Current 3.8 A EER 17.00 Buh Energy Grade Power Supply 1, 220~240V, 50 Hz Moisture Removal 1K g/h Setting Temperature Range 16 C-30 C Timer 24hr Ov/Oft Indoor Air Flow Rate 1m3/min ‘Sound Level (Noise) 36/30/24/18 dB(A)#+3 Net Weight 9 Kg Dimensions 837*302*189 mm Outdoor Air Flow Rate 28 m3/min Sound Level (Noise) 474B(A)+3, Net Weight 23.5 Kg Dimensions 720*500*270 mm Rp. 30.262.000, Paraf Pihak Pertama Paraf Pihak Kedua z qT - Bahan Aluminium Tebal - Dapat ditekuk dan dibentuk sesuai Keperluan ~ Anti Karat ~ Ketinggian Tanga Dapat Diatur is FILLING (4 UNIT Material Plat Besi Ketebalan 0.6mm Rp. 11.785.000,, KABINET Finishing Powder coating 4 Drawer Central Lock i Rel Laci Bes Dimensi W 45 x D 62 XH 133 em | fie [ALAT SATUUNIT | SKGKARBONDIOKSIDA (COA) - Set Rp. 1.515.500, PEMADAM Kompli KEBAKARAN Ready Stock - TONATA Karbondioksida (CO2) APAR| KG Set Komplit, Set Komplit: 1. Tabung APAR (CO2) 5Kg-+ 5Kg Gas Karbondioksia 2. Pressure Gate 3. Selang dalam 4, Nozzle 5. Leher tabung 6. Fire Extingusher Holder (SKG) 7. Safety tag 8. Keterangan Refill li7 KURSIMEIA [2 UNIT ‘Kursi Kantor hidrolik dan mekanis Rp. 1.813.000,- Kaki terbuat dari stainless steel Sandaran terbuat dari kain yang kuat dan plastik Sangat nyaman saat digunakan Pilihan warna biru merah hitam Kursi bisa ayun mengikuti gerakan badan Bisa untuk berat badan 110kg lis TANGGA SATU UNIT _ | Kelebihan Produk Rp. 1.911.000,- Paraf Pihak Perta Porat’ Pihak Kedua z. SUMMARY Paraf Pihak Pertama TOTAL ANGGARAN PROJECT PENGADAAN PT. SPR NO ITEM HARGA 1 ‘Satu set komputer Kasir Rp 8.775.000 2 CCTV 1 Set Rp 3.731.700 3 Paket Rak susun Rp _51.851.000 4 Kaca, Pintu kaca Rp 19,247.800 5 Genset Rp 13.453.750 6 Listrik 6600 Watt Rp 2.842.000 7 Instalasi listrik 10 Titik Rp 3.929.000 8 Neon box 2x3 m Rp 5.893.000 9 Kabel merk Supreme 3x2,5mm 3 group |Rp 3.830.000 10 TVLED42Inch Rp 7.857.000 i Bilboard 3x1 m Rp 3.636.000 12 ‘Meja kasir 1,20x5,50 M Rp 38.809.700 1B ‘Showcase 3pinu 2 unit — Rp 44.191.200 14 ‘AC (4 Unit) Rp 30.262.000 5 Selling Kabinet (4 Uit) Rp _11.785.000 16 ‘Alat pemadam kebakaran Rp 1.515.500 7 Kursi kerja 2 Unit) Rp 1.813.000 18 Tangga Rp _ 1.911.000 SUB TOTAL Rp — 265.333.650 PPN 10% Rp 26.533.365, PPH 2% — Rp 5.306.673 » DESIGN & Konsultan (4) Biaya Mupping | Rp 14.195.000 GRAND TOTAL Rp _311.368.688 DIBULATKAN [Rp _311.368.700 TERBILANG : Tiga Ratus Sebelas Juta tiga Ratus Enam Puluh Delapan Ribu tujuh ratus Rupiah Paraf Pihak Kedua ¢ ‘TOTALANGG: YUNG 100,000 Unit dan akan di laksanakan sb 1, TAHAP PERTAMA Sebanyak 50.000 unit 2. TAHAP KEDUA Sebanyak 50.000 Unit 3. Ready 5.000 unit siap untuk Laksanakan 4. Nilai kontrak kerja Rp. 20.000.000.000.000 (Dua puluh trilyun rupiah) tersebut, adalah yang nilai Rp. 5.000.000.000.000 (Jima trilyun rupiah) untuk pandanaan supply produck — produck yang di Distribusikan ke unit SWALAYAN PRO RAKYAT yang (erdiri dari produck — produek : Pt. Unilever, pt. Mayora, pt. Garuda food, pt. Dua kelinei, pt. Indo food, pt. Indo fora food, pt. Jaffa confood 5. PELAKSANAAN dari TOTAL 100.000 Unit Tersebut kami selaku MAINKONTRAKTOR UTAMA PT. SRI AYU SAKTI (PIHAK KEDUA) Bersedia untuk melaksanakan dan Bersedia untuk Melengkapi kuota dari UNIT — UNIT yang sudah Tersedia dari semua para SANTRI DI 28 PROPINST SELURUH WILAYAH INDONESIA Atas dasar dengan kesepakatan bersama Antara PIHAK PERTAMA dan PIHAK KEDUA Demikian perjanjian SURAT PERINTAH KERJA (SPK) ini dibuat Serta Ni KONTRAK KERJA nya, SATUAN HARGA PENGADAAN Dan RAB ADDEDDUM ini Sebagai lampirannya, Agar dapat di lakasanakan sebaik — baiknya dengan penuh tanggung jawab sesuai jangka waktu pekerjaan dalam perjanjian ini, dengan itikad baik untuk dipatuhi dan dilaksanakan oleh para pihak, Atas kerjasamanya kami ucapkan terimakasih. Jakarta, 22 Oktober 2020 PT, SWALAYAN PRO RAKYAT PT.G ESIK PUTRAJATIM, PIHAK KEDUA Pihak Penerima Perintah Kerja ‘Bambang Suratno) Direktur Utama’ 1 Pihak Pertam: Paraf Pihak Kedua Le |

You might also like