QFDGN.OL
AGA SS Gat Ora ARATE fee
POWER GRID COMPANY OF BANGLADESH LTD.
180 9001 :2008, (An Enterprise of Bangladesh Powor Development Board)
CERTIFIED
TITLE : DOCUMENT/DRAWING APPROVAL/COMMENT TRANSMITTAL
PROJECT + Design, Supp), Erection, Testing and Commissioning ofAshugo Shula Tansrisson Line
‘and 400/230KV Substation on Turnkey Basis,
CONTRACT NUMBER: + PGCBIGoBM400KV/Bhulta-$S; Dated: 14,09,2015
DOCUMENT SUBMITTAL REF —; PGCB/Bhuita/Trans/Site/146; Date: 27.10.2016
SUBJECT 1 Foundation of 230kV Gantry at Bhulta 400/280kV Substation.
To, Copy to,
Project Director
‘Ashuganj-Shulta400kV Transmission Line Project, PCB
Red Crescent Concord Tower (6* Floor)
Manag Drectr, Pos
Executive Drecor P20), PCB
17, Mohakral C/A, Dhake-1212,
Bangladesh
Cri Epes (P80), P68
(hie Engle: Fees)
Kind Attn; Engr. Kaz Ishtiague Anmed
‘Superintending Engineer, PGCE.
Lal fe, AB Ie
Execute Erie, Ci Das
Dear Sir,
‘We are pleased to convey our comments on the following documents forthe purpose indicated below.
tn cabo of any modification other than those desired are cared out the same —_lesued by
Shall be highighted cleerly in the Drawing/Dacument with ful justification
thorecf and esubmited fr approval
nea Cony
nye
Aseonalcanmanstomaten comyed tern cater wives no Sum epene lng,
Conn eens esgaton rhea tcoreanes ——« Smname reer
Senenine “mae of crews wine name See
Siecle fu pfemarce pau an cota) aie gehg maeae oy ap
Sitio Lave ot Baraat araybe sical nr sein be OF OLPSCBSEDuntceanz2
Enyce thtnder pera oie SZ Ye
ize avn zi 5
in Descrpton ae sia Enosed
2k Gan Foudon Den : |
1 ny Fun sccesnnciucm | 0
ae ~
2 | mavonyranaienoen, | gcsmavancrs | » | See
=e
Please acknowledge resist of documents:
Reiety [ae
Page 1 of 1
Institution of Engineers Bangladesh (IEB) Bhabon (New), 3rd & 4th Floor, 8/A Ramna, Dhaka-1000, Web : wwrw,pgcb.org.bd
PABX :9550514, 9553663, 9558054, 9560064, 9582184, FAX : +88-02-9582382, E-mail :
info@pgcb.org.bd1 = 3 4 5 6 af 8
2820 C/C OF PEDESTAL ie
be rot :
ies ea at \GLADESH
e POWER GRID COMPANY OF BAN
"APPROVED. es
5 roars cry a ow eae
a7 PILE CASTING LEVEL pe isuppie from cor A
5 om iP
{| | se nin sn won
ne ER BS “BLE Bir-orF Love. spectcaion ans ot aia’ if
a Eure “nd perfor
5 a
109220nen 6/2 ana oF Pe Ow
8) Eel: i
s-020 5
Yee asain)
Bu oY ig eguvparedeisbnansone Eagle DEACEE Cy
4 Wabeees gre” Buea El
ies i o16 L120, oan uy bene
Th oe =) El 4 JES, Z 4
ore eee a} eer {ALNAG)
3600 1 as 3 uperintending Enger
ze 1 |) |e ivi Design & Quality Contre
y a (ES OCB, Dinka
zr mur oft 8 |g so
3 2 Bags ges ecw oon at
sl | g
q a 3 Aas coe Gus ¥ ATs HOFOMIND 6138
eae eee
Ee] sma oa pe ersener ¢
g Ce} 38 BES Gea a ena
Pee 9 pe trom 0 to oF un
Ney ies 4 A OMENSENS ME WA NOT MEENED OTHERS.
3600 SECTIONSS=3 OUG_SECTON 7 Sanceanee Ra
leona Tas LENO GIO ORE Sa erase ene
be seer sa
sor 3.5 1 oF tos ae
ql i coon c 2. bo lo on
ae X O|
- "ALT BAR TACK WELDED "ALT BAR TACK WELDED
‘SECTION; 1=1 SECTION ; 11
PLE Div 800 PLE DA 800
4 2760 9/8. OF RL
&
se "E i) ¢
z = et) root sumesnann
[gp een PT ead acd Sate an
1 oF e-1ee on ste eS ete
8 as aunt aero
eae era
section «121 secmon «1-1
PLE DA 800 PLE OA 500
eso omen eos con
cy 2 8/8 Of REE
z TSO EY BAT GOT
g Baran | rss A
sae ae alone
EA = rn
al zls = @
ag i5 omen GR COMPANY OF RANGLADESE LD.
qe i3
ae Far SSR ano cinciaae
8} 32) ASHUGANI-BHULTA TRANSMISSION LINE AND BHULTA 400/230KV
ala SUESTIONS ON TURHEY BASS (ET-2SURTANON]
Gc we PGCE / Ce /4O0KY/BHULTA-SS;ONTED 14082015
3 aan essa 3
Gea -ae] urna PSOKY GARY FOUNDATON DESC
8 FO RSL OE = ee ~ TOWER 204 as
a a TT Fo
es (a) Pog3COR A675
zi 8