CPRC MALDIVES PTE.

LTD
Project: RAH FALHU HURAA MALDIVES, RESORT ISLAND 3
Project No.: RFHISL3
CONCRETE CUBE TEST REPORT SUBMISSION

Transmittal No. : RFHISL3-SOC-RPT-025 Date: 23-Feb-19

Transmitted For:

X Approval Review & Comments For Action As Requested For Information

Method of Transmission:
Hand Mail Email Courier X Upload via Procore

Date of testing : 24-Feb-19


Time : 4.00 pm

Details of Testing
Test Method: : BS 1881

Location : South Central Walkway

Structural Element: : Beams

No of Samples : 3

Date of Casting: : 17-Feb-19

Date of Testing: : 24-Feb-19

Age at Testing : 7 Days

Specified Mix/ Grade: : SRPC/Grade 35

Test to be conducted by:


Umesh Chamara QA/QC Engineer 23-Feb-19

Name Title Signature Date

Test to be witnessed by:

Name Title Signature Date

CPRC MALDIVES PTE. LTD


M. Faaroshige, Level 2, Orchid Magu, Male’
Republic of Maldives