Professional Documents
Culture Documents
▪ Extraction
▪ Configuration
▪ Checks
▪ Pre-processing
▪ Execution
▪ Post Processing
Extraction:
Configuration:
https://www.linkedin.com/in/priti-prasanna-33698050/
Checks:
Pre-Processing:
This is the pre-downtime phase where all the pre-tasks need to complete by SUM
like
▪ Check for locked objects
▪ ABAP Workbench locking
▪ Run shadow system for preparation of new release (ACT_UPG, PARDIST, SGEN)
▪ SPDD Adjustments
Execution:
Sum tool downtime is called as execution where actual are copied from Shadow to Main
Instance and system were unavailable during the downtime.
Post Processing:
▪ SPAU change
▪ Backup
https://www.linkedin.com/in/priti-prasanna-33698050/