BFW 40503

Individual Assignment 2

1. A multi-purpose hall is to be developed within Batu Pahat city area. The project area is
0.60 ha. 75% of it shall be occupied by building, access road and pavement while 25% by
garden and turfed areas. The catchment area of the project where it connects to the main
drain is 0.60 ha and has a terrain slope about 1:1999. It is more economical to construct an
OSD tank than to upgrade the existing drainage system for this new development. Based
on the design procedure, calculate the Permissible Site Discharge (PSD), Site Storage
Requirement (SSR) and inlet and outlet pipe sizes.
Ch4: C3 & C4 (15 marks)

2. A developed factory in Seremban is proposed to be included rain water tank in the design.
The roof building area and workers are 4500m2 and 450 peoples, respectively. The factory
will has toilets with single flush system and small landscaping area at the entrance.
a. Determine annual rainwater demand (m3)
b. Determine rainwater tank size
c. Evaluate percentage of rainwater yield over rainwater demand.
Ch5: C4 & C5 (15 marks)

3. A wetland is proposed to be constructed in the area. Develop a steps to design the wetland.
Ch6: C6 (10 marks)