The document outlines a construction work plan involving ground preparation, compaction, installation of a 300mm gypsum layer, water compaction, level checks, and density testing for multiple locations identified as BVS1-5, GS1-2, REZ-1, BOG-1-16, and REB. The same series of steps is listed sequentially for each location.
The document outlines a construction work plan involving ground preparation, compaction, installation of a 300mm gypsum layer, water compaction, level checks, and density testing for multiple locations identified as BVS1-5, GS1-2, REZ-1, BOG-1-16, and REB. The same series of steps is listed sequentially for each location.
The document outlines a construction work plan involving ground preparation, compaction, installation of a 300mm gypsum layer, water compaction, level checks, and density testing for multiple locations identified as BVS1-5, GS1-2, REZ-1, BOG-1-16, and REB. The same series of steps is listed sequentially for each location.
2 BVS1 Water or machean compaction 3 BVS1 300mm gypsum layer 4 BVS1 Water and compact 5 BVS1 Level check and modify 6 BVS1 Density test 7 BVS2 Ground prepration 8 BVS2 Water or machean compaction 9 BVS2 300mm gypsum layer 10 BVS2 Water and compact 11 BVS2 Level check and modify 12 BVS2 Density test 13 BVS3 Ground prepration 14 BVS3 Water or machean compaction 15 BVS3 300mm gypsum layer 16 BVS3 Water and compact 17 BVS3 Level check and modify 18 BVS3 Density test 19 BVS4 Ground prepration 20 BVS4 Water or machean compaction 21 BVS4 300mm gypsum layer 22 BVS4 Water and compact 23 BVS4 Level check and modify 24 BVS4 Density test 25 BVS5 Ground prepration 26 BVS5 Water or machean compaction 27 BVS5 300mm gypsum layer 28 BVS5 Water and compact 29 BVS5 Level check and modify 30 BVS5 Density test 48 GS1 Ground prepration 49 GS1 Water or machean compaction 50 GS1 300mm gypsum layer 51 GS1 Water and compact 52 GS1 Level check and modify 53 GS1 Density test 54 GS2 Ground prepration 55 GS2 Water or machean compaction 56 GS2 300mm gypsum layer 57 GS2 Water and compact 58 GS2 Level check and modify 59 GS2 Density test 60 REZ-1 Ground prepration 61 REZ-1 Water or machean compaction 62 REZ-1 300mm gypsum layer 63 REZ-1 Water and compact 64 REZ-1 Level check and modify 65 REZ-1 Density test 66 BOG-1 Ground prepration 67 BOG-1 Water or machean compaction 68 BOG-1 300mm gypsum layer 69 BOG-1 Water and compact 70 BOG-1 Level check and modify 71 BOG-1 Density test 72 BOG-2 Ground prepration 73 BOG-2 Water or machean compaction 74 BOG-2 300mm gypsum layer 75 BOG-2 Water and compact 76 BOG-2 Level check and modify 77 BOG-2 Density test 78 BOG-3 Ground prepration 79 BOG-3 Water or machean compaction 80 BOG-3 300mm gypsum layer 81 BOG-3 Water and compact 82 BOG-3 Level check and modify 83 BOG-3 Density test 84 BOG-4 Ground prepration 85 BOG-4 Water or machean compaction 86 BOG-4 300mm gypsum layer 87 BOG-4 Water and compact 88 BOG-4 Level check and modify 89 BOG-4 Density test 90 BOG-5 Ground prepration 91 BOG-5 Water or machean compaction 92 BOG-5 300mm gypsum layer 93 BOG-5 Water and compact 94 BOG-5 Level check and modify 95 BOG-5 Density test 96 BOG-6 Ground prepration 97 BOG-6 Water or machean compaction 98 BOG-6 300mm gypsum layer 99 BOG-6 Water and compact 100 BOG-6 Level check and modify 101 BOG-6 Density test 102 BOG-7 Ground prepration 103 BOG-7 Water or machean compaction 104 BOG-7 300mm gypsum layer 105 BOG-7 Water and compact 106 BOG-7 Level check and modify 107 BOG-7 Density test 108 BOG-8 Ground prepration 109 BOG-8 Water or machean compaction 110 BOG-8 300mm gypsum layer 111 BOG-8 Water and compact 112 BOG-8 Level check and modify 113 BOG-8 Density test 114 BOG-9 Ground prepration 115 BOG-9 Water or machean compaction 116 BOG-9 300mm gypsum layer 117 BOG-9 Water and compact 118 BOG-9 Level check and modify 119 BOG-9 Density test 120 BOG-10 Ground prepration 121 BOG-10 Water or machean compaction 122 BOG-10 300mm gypsum layer 123 BOG-10 Water and compact 124 BOG-10 Level check and modify 125 BOG-10 Density test 126 BOG-11 Ground prepration 127 BOG-11 Water or machean compaction 128 BOG-11 300mm gypsum layer 129 BOG-11 Water and compact 130 BOG-11 Level check and modify 131 BOG-11 Density test 132 BOG-12 Ground prepration 133 BOG-12 Water or machean compaction 134 BOG-12 300mm gypsum layer 135 BOG-12 Water and compact 136 BOG-12 Level check and modify 137 BOG-12 Density test 138 BOG-13 Ground prepration 139 BOG-13 Water or machean compaction 140 BOG-13 300mm gypsum layer 141 BOG-13 Water and compact 142 BOG-13 Level check and modify 143 BOG-13 Density test 144 BOG-14 Ground prepration 145 BOG-14 Water or machean compaction 146 BOG-14 300mm gypsum layer 147 BOG-14 Water and compact 148 BOG-14 Level check and modify 149 BOG-14 Density test 150 BOG-15 Ground prepration 151 BOG-15 Water or machean compaction 152 BOG-15 300mm gypsum layer 153 BOG-15 Water and compact 154 BOG-15 Level check and modify 155 BOG-15 Density test 156 BOG-16 Ground prepration 157 BOG-16 Water or machean compaction 158 BOG-16 300mm gypsum layer 159 BOG-16 Water and compact 160 BOG-16 Level check and modify 161 BOG-16 Density test 162 REB Ground prepration 163 REB Water or machean compaction 164 REB 300mm gypsum layer 165 REB Water and compact 166 REB Level check and modify 167 REB Density test