b = 450 mm
h = 450 mm
n tulangan per
baris = 4 batang
d tulangan = 22 mm
ds = 60 mm
fc' = 20 Mpa 0.02 kN/mm²
fy = 300 Mpa 0.3 kN/mm²
Es = 200000 Mpa = 200 kN/mm²
Pu = 1280 kN
Mu = 150 kNm
Ꜫcu' = 0.003
REKAPAN
Kuat Nominal Kuat Rencana
Tinjauan
Pn (kN) Mn (kNm) ØPn ØMn
(Po) 4303.466857 0 2797.253457 0
a. Beban sentris
(Pn,max) 3442.773486 0 2237.802766 0
b. (c>cb) 1834.730726 333.703973 1192.574972 216.90758
c. (cb) 1690.65 344.172568 1098.9225 223.71217
d. (c<cb) 1009.513125 311.124658 656.1835313 202.23103
Ø=0.65 0 164.210616 0 106.7369
e. P=0
Ø=0.8 0 164.210616 0 131.36849
3.14286
)
>cb
Momen (kNm)
64.9346579292268
193.472743359375
75.2965714285714
Mn= 333.70397
0.003
0.003
0.003
0.003
(h-a)/2
160.531515246094
0.1590188
(h/2-ds')
75.2965714285714
0.165
Mn= 311.12466
450 x 450
kan (A1=A2'), maka tulangan pasti