You are on page 1of 3

ECG Project Name

Job Ref.
Engineering Consultants Group CHECKING AND PACKING HALL
Bldg. 2, Block 10, El Sefarat District Calc. By Date Checked By Date Rev.

P.O.Box No. 1167, Cairo 11511, Egypt. M.Nour Sheet No.

PURLINS ID :- ( P-1 )

Span = 8.00 m
Spacing = 1.75 m
α = 10.00
Using tie rods = 2 tie rods Φ12
1)- APPLIED FORCES :-
DEAD LOAD
O.W of C.sheets = 20.00 Kg/m2
WDL = 35.54 Kg/m\
WXDL = 0.0535 t/m\ WYDL = 0.0094 t/m\
MXDL = 0.4281 m.t MYDL = 0.0084 m.t
QXDL = 0.2141 t

LIVE LOAD
a)Uniform load
Roof is inaccessible
L.L. = 48.24 Kg/m2
WLL = 84.43 Kg/m\
WXLL = 0.0831 t/m\ WYLL = 0.0147 t/m\
MXLL = 0.6652 m.t MYLL = 0.0130 m.t
QXLL = 0.3326 t
b)100 Kg concentrated load
PX = 98.48 Kg PY = 17.36 Kg
MXLL = 0.1970 m.t MYLL = 0.0116 m.t
QXLL = 0.0492 t
MAX LIVE LOAD :-
MXLL = 0.6652 m.t MYLL = 0.0130 m.t
QXLL = 0.3326 t

WIND LOAD
Ce = -0.60
K = 1.10
q = 50.00 Kg/m2
WXWL = -0.3275 t/m\
MXWL = -2.6201 m.t Neglect wind load
QXWL = 0.00 t

FINAL DESIGN LOADS :-


MX = 1.0933 m.t Case a
MY = 0.0214 m.t
QX = 0.5466 t
ECG Project Name
Job Ref.
Engineering Consultants Group CHECKING AND PACKING HALL
Bldg. 2, Block 10, El Sefarat District Calc. By Date Checked By Date Rev.

P.O.Box No. 1167, Cairo 11511, Egypt. M.Nour Sheet No.

2)-CHOICE OF SECTION :-
U.P.N. 160

Weight = 18.80 Kg/m\ Ix = 925.00 cm4


Sx = 116.000 cm3 Sy = 18.300 cm3

3)- CHECK STRESS :-


Normal Stress
fb = 1.060 t/cm2 < 0.58xFy SAFE

Shear Stress
qw = 0.14 t/cm2 < 0.35xFy SAFE

h
4)- CHECK DEFLECTION :- X
W

δL.L = 2.28 cm <B span/300 SAFE


ECG Project Name
Job Ref.
Engineering Consultants Group CHECKING AND PACKING HALL
Bldg. 2, Block 10, El Sefarat District Calc. By Date Checked By Date Rev.

P.O.Box No. 1167, Cairo 11511, Egypt. M.Nour Sheet No.

You might also like