13-Purlins Upn Channel
13-Purlins Upn Channel
Job Ref.
Engineering Consultants Group CHECKING AND PACKING HALL
Bldg. 2, Block 10, El Sefarat District Calc. By Date Checked By Date Rev.
PURLINS ID :- ( P-1 )
Span = 8.00 m
Spacing = 1.75 m
α = 10.00
Using tie rods = 2 tie rods Φ12
1)- APPLIED FORCES :-
DEAD LOAD
O.W of C.sheets = 20.00 Kg/m2
WDL = 35.54 Kg/m\
WXDL = 0.0535 t/m\ WYDL = 0.0094 t/m\
MXDL = 0.4281 m.t MYDL = 0.0084 m.t
QXDL = 0.2141 t
LIVE LOAD
a)Uniform load
Roof is inaccessible
L.L. = 48.24 Kg/m2
WLL = 84.43 Kg/m\
WXLL = 0.0831 t/m\ WYLL = 0.0147 t/m\
MXLL = 0.6652 m.t MYLL = 0.0130 m.t
QXLL = 0.3326 t
b)100 Kg concentrated load
PX = 98.48 Kg PY = 17.36 Kg
MXLL = 0.1970 m.t MYLL = 0.0116 m.t
QXLL = 0.0492 t
MAX LIVE LOAD :-
MXLL = 0.6652 m.t MYLL = 0.0130 m.t
QXLL = 0.3326 t
WIND LOAD
Ce = -0.60
K = 1.10
q = 50.00 Kg/m2
WXWL = -0.3275 t/m\
MXWL = -2.6201 m.t Neglect wind load
QXWL = 0.00 t
2)-CHOICE OF SECTION :-
U.P.N. 160
Shear Stress
qw = 0.14 t/cm2 < 0.35xFy SAFE
h
4)- CHECK DEFLECTION :- X
W