Professional Documents
Culture Documents
(lbs)
1 2 2" SCH. 80 PIPE SA-106 B 5.5
2 2 2" 150# RFSO FLANGE SA-105 10
3 2 1.5" FNPT HALF COUPLING 3000# SA-105 3
4 2 16" OD 2:1 SE HEAD, 0.25"t SA-516 70 0.225" MIN.AF,1.5"SF 57
3 VIEW A 5 2 2" FNPT HALF COUPLING 3000# SA-105 3.5
A 6 1 SHELL-16"OD, 0.25"t, 30" LONG SA-516 70 107
N3 7 3 FOOTPLATE, 4X4X0.5" SA-36 6.8
LONG. SEAM 90° 9 8 3 ANGLE, 2X2X0.25" SA-36 12.4
N1 9 2 LIFTING LUG, 0.75" THK SA-36 2.3
4 207.5
1 2 5 TYP.
0.25
10.0
0°
45° 12
NAMEPLATE
180° N5
120°
NB#:
5.0
5.0
N6 N1 0°
CERTIFIED BY
N4 ABC MACHINERY CO., LTD.
45°
N6
100 PSI AT 300° F
N2 W
(MAXIMUM ALLOWABLE WORKING PRESSURE)
6 RT-4
-20° F AT 100 PSI
(MINIMUM DESIGN METAL TEMPERATURE)
SERAIL#:
YEAR BUILT:
Ø 16OD
270°
30.0
5 N2
28 NOTES:
49.0
.0
N5
R1
0.5 1.5 5 MILL TEST REPORTS: REQUIRED
N3 87
4.0
5.0
0.
5.0
Ø OTHERWISE NOTED.
CIRC. SEAM 75
0. 3. LIFTING LUGS DESIGNED FOR LIFTING EMPTY VESSEL
Ø
ONLY.
4. ALL FLANGES TO HAVE BOLT HOLES STRADDLING
4.0
NATURAL CENTER LINES
TYP. 5. VESSEL TO BE FREE FROM SPLATTER, DIRT AND OTHER
TYP.
1.5
0.25 TYP.
FOREIGN MATTER BEFORE SHIPMENT.
6. ALL WORKING SURFACES, EDGES, AND SHARP CORNERS
0.25
TO BE GROUND SMOOTH
7. X-RAY:SPOT ON BOTTOM CIRC. SEAM.
2.5 8. CORROSION ALLOWANCE: 0 INCH
11.5