You are on page 1of 3

ELECTRICAL WORKS

TECHNICAL SPECIFICATIONS (GENERAL)


TABLE OF CONTENTS

SR. NO. D E S C R I P T I O N PAGE NO.

E.1.1 TECHNICAL PROVISION 2-8

E.2.1 CONDUITS & CONDUIT ACCESSORIES 9-12


E.2.2 WIRES & CABLE 13-14
E.2.3 WIRING ACCESSORIES 15-15
E.2.4 POINT WIRING, CIRCUIT WIRING AND SOCKET OUTLETS WIRING 16-16
E.2.5 FANS 17-18
E.2.6 LIGHT FIXTURES 19-21
E.2.7 POWER CABLES / LT. CABLES 22-26
E.2.8 L.T SWITCH BOARDS 27-31
E.2.9 SUB-MAIN BOARDS 32-32
E.2.10 DISTRIBUTION BOARDS 33-34
E.2.11 EARTHING 35-36
E.3 TESTING 37-38
LIST OF APPROVED MANUFACTURE’S BRANDS 39

1
E-1- TECHNICAL PROVISION___________________________________________________

E.1.1 General

The general instructions are given to the tenders elsewhere in this contract documents. The
additional instruction in the following paragraphs are given in order to invite the tenderer’s
attention towards some major points pertaining to electrical work only and to assist them in
preparing tenders. These instructions shall be deemed as Technical Provision of the
Contract.

E.1.2 Scope of work

The work consists of furnishing all tools, plants, labour material and equipment and
performing the internal and external electrical works comprising of:

a) Light and Power Wiring / Accessories


b) Fan, light and other fixtures
c) Wires and Cables
d) L.T.Switchgear
e) Distribution Equipment
f) Public Address System
g) Fire Alarm System
h) Loop Induction System
i) Exerthing System
j) External Lighting
k) Any other system / item given in the drawings but not mentioned above

The work shall be carried out in strict accordance with the conditions of Contract, special
Conditions, Drawings, Technical Specification and as per items of Bill of Quantities and
including the responsibility of all related work necessary for their proper functioning,
testing, commissioning and satisfactory operation and performance including maintenance
for the period specified elsewhere. The contractor shall provide for all required technical
and non – technical personel, skilled and non- skilled labour, construction equipment,
transportation etc. as required for the completion of work is strict according with the
Technical Specification laid herein- after.

E.1.3 Prequalification

The Electrification work shall be carried out only by a licensed Contractor authorized to
undertake such work under the provision of Electricity Act.1910 and the Electricity Rules,
1973 as adopted and modified by the Government of Pakistan.