You are on page 1of 7
432,0EGUM PETH, SOLAPUR=413001. DATE = 1509-20006 To, ‘THE REGIONAL MANAGER, M.I.D.C. UDYAG BHAVAN VISHRAMBAG,SANGLIN416415 REP.NO./R03/ais/495/O8_ 200048 99-09-2000. ++« PLOT! NO .Ao134. M.T D.C. CHINCHOLT ,SO! SOLAPUR + qectic_ R/SIR, AS PER YBUR LETIER REP. NO./ROS/am/495/2000 DATED — 1 HEREBY CLEARED THAT I HAVE ALREADY COMPLETED THE FACTORY aR BUILDING AS'PER THE SANCTIONED PLAN ALSO I HAVE RECIEVED THE B.C.C, 10. A/134/1270/1999 RATED 14<09~1998 . WHICH I HEREBY ATTACHED THE SAME FOR YOUR KIND COUSIDERATION. THANKING YOU. YOUR!S FAITHFULLY, FOR TEX-MBCH INDUSTRIES. Scanned with CamScanner MAHARASHTRA INDUSTRIAL DEVELOPMENT CONPORATION (A Government of Meharashtra Undertaking) 1) 119.4n08/4-77 7 LAS /0£+2000 P Office of the Regionel Officers h.eNo. (9233) 322594} san 14) N.I.D.C. ‘Udyog Bhavan’. 326554 ‘J Behind Tata Petrol Pump, a) ee) et Sangll-416 415+ . 2) Office of the Ares Managers Me etcr, Greece Buliaing. lamorbigh Shai {nica rkat' nad, ISOLAPUR-413 006. 2 th le fu =—H18 09] Data, B 1 [2000 - a ea : eg EL —— i Indl-ares+ from ny ye Sir/centlemen, . | By an Agreenont f> Uaase dated the PT __ aay of, _ Apa] [4tb= + mace votween ents Corporation end yourself, the Corporation agreed to grant to you lease ef the above plot of land upen the performance and ebservance bf the obligatiens and conditions contained therein for term of 95 years in the manner therein stipulated. 2. re Cieuse 5 of the said Agreemant raed as under: 83(g) That he will within 40/60 months of the dete hereof submit-to the Executive Pnginecr+ jsharashtre industrial Development Corporation, Sangli Division, Sangli (hereinafter called "the Executive engineer" which expression shall include any other Officer f° whem the duties and Functions of the seid Executive Engineer, Mahareshtra qndustrial Development Corporations Division Sangli, may be assigned) for his approvel the specifications, plans. gievations, sections and details of the factory buildings hereby agreed by the Licenseesto be erected on the said jand and the Licensee shall at his own cost and as often an he may be coiled upon to do so amend ell or any such Scanned with CamScanner v plans and elevations © Swati supply {iis suen Engineer an ‘ re the Executive dese tons ‘shell be seme befo: details aa may be cated for of ENE specif a approved by the Executive Engineee ana ssgned PY es Licensee shall sign and leeve ith nim three copies 3 of any further conditions oF \petween the Licensee : : oh and also three signed copie stipulations which may be agreed upen and the Executive Engineer" + g(a) thet he shall within & period of three years se trom the date hereof commence and complete at his own expen end in 9 substentiel end workmen like manner ang with new ‘Sng sound materials end in compliance with 921 municipal rules, bye-lawa and regulations appiicable ‘thereto and in strict accordance with the piensa elevations, details and specifications to the satisfaction of the Executive enginéer? and conformable te the building lines marked on the’ pien hereto arinexed end the Building Reguiations annexed’ hereto by way o£ Second Schedule build end completely finish’ £4¢ © for occupation building to be used es en industrial. factory with all requisite drains and other proper coveniences thereto". : "5(b) (4) dn case the Licensee shall fail to complete the said factory building within the time aforesaid and in accordance with the stipuletions herein before ; contained time in his respect being the essence of ‘the controct of shell not proceed with the works with due @iligence or shall fail to observe any of the stipulations on his part herein contained right and power to re-enter through the Chief executive Officer, upon anc resume noo the id land and everything thereon and there A this Agreement shall cease and terminate and ell erections and materials, plant an? things upon the said plot of land shell notwithstanding any enatchment Scanned with CamScanner for the time being in force to the contrery belong to the Corporation without making any compensation or allowance to the Licensee for the same and without making any payment to the Licensee for refund sr repayment of the premium aforesaid or any part thereof but without prejudice’ never— theless to all sthe: legal rights, and remedinvs Government oo of the er the Corporation against the Licensee". The above stipulations required you to (a) submit | the specifications, plans, elevations, secticns and details o£ the factory buildings agreed by you to be constructed on the said plot of lend commence the construction of the factory building and complete the said building for being used as an Industrial factory on or before the The time-limit for submission of the specifications, plans, elevations, sections and details of the factory buildings, and commencement and’ completion of buildings was extended Although the period stipulated for completion of the factory buildings is over you have not completed the buildings nor produced » completion certificate as provided in the said Agreement. Se ¥eu have th comitted breach of the primary stipulation of the said Agreement and the Corporaticn has: become entitled to exercise its power reserved under sub- cleuse (b) (4) of Clause 5 of the said agreement to re- enter upon and resume possession of the said pict of lend and as provided in the sid clause. : . You are accordingly called upon to tender your explaination nd t2 show couse within one month fram the ote of receipt of this notice why action as pointea sut in paragroph 5 obsve should nst be taken. weed Scanned with CamScanner 2. In case you desire to be heard you may call on the undersigned on ony working day during office hours by prior appointment. : a 8. If no reply 4s received pursuant to this notice the Corporaticn will be free to proceed further to terminate the said Agreement and to re-enter upon and resume possession ef the soid plot of land fortwith. Yours faithfully, Officer, Sangli Region, ANGLI. Mex. Scanned with CamScanner “ott BUALDING COmPueTION CuRPIPLEALE = //n/, This is te Cértify that m/s._Shtte “eels Phaikh, allottee of Plot no.__A-?34 in Appagyy/Chincholi Industri. Area have completed the fsctory builJiny work on the apove said plot in accordance with the Building Plens “pproved vide this office letter fo. dated. need .rchitect M/s/Shri.. _— (dame) eg. C-. No., _— through the Lice Detsils of units constructed are as given below :- ShricAsKem. Shaikh (1) Neme of Allottee. Be me = ——— (2) Pldt-No. 4 eee 800. m2 (3) Plot Area in sa.m. ee 5/6/92 (4) Date of Allottment. (5). Approval of Plsns. Built-up Ares in Sa-m._. 1st Approval Date 2nd Approval Date. s- 3rd Agproval Dete.i= 4tn approval Date. .= (e) Position of Construction e on the site as on 27/8/98 (a) Built-up arca complete in all respect. (in sd-m.) (>) Areva under construction. (in sq.m.) (c) open area (in sq.m.) 725.44 m2 The allottee has submittea () tomon. _-REtPeP a Peg sae oe Solapur beating No.244" datea3/6/98 By STEE,OE Production within Scanned with CamScanner ieee tld ae /[----- (7) emarks of Executive “ngineer ss) Regarding: ogservation of Wit.’ : Rules (sxecutive Engineer may Indicate to whether the oe Construction hasbeen in accordance with the spsroved plan & give apy other observation which he Consivers necessary to give.) As per HIDE D.v. Rules, * (8) «area that could be considered as built-up area. (in sq.m.) (9). Actual utilisation of plot in view of the existing construction in the form of utilisition of 0.093 Beowdi : eee (10) Do you" réconimond grant of final lease of the entire -plot having regard to the ‘dre.of the plot & construction carried out so far ? ‘Tes (11) 3.0.C. is issue@\as pec the documentry evidences produced py. the party. (Authority 4s per the Circular ‘issued by ChO,nILe Bombay . - tinder nis letter No WCZGs/ Lands/2xt/4699, dt-10-4-1985) « r - + Depaty Engineer, 4IWC,Solapur Sub-Un. SOLAPUR, ro P-BYs NAF 998 sepeB de the DyBngineer, Othe; Solapur Sub-Division, SOLAPUR-413006. i pave:- IY 79 2998 *Copy £-WsC-S- to M/S. o copy £.w.c-8- to the Regional officer; met Deve Copy £.W.c.5- to the gt .c Oe for information. mIDC Marnl, 'Bombay-93- Scanned with CamScanner

You might also like