HARGA
No URAIAN VOLUME UNIT SATUAN
(Rp.)
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1. Boplang 35.00 M' 35,000.00
2. Galian tanah 7.00 M³ 55,000.00
II PEKERJAAN PONDASI
1 Pemasangan batu kali 18.00 M³ 675,000.00
2 Sloof bawah 15X20 1.49 M' 5,400,000.00
3 Kolom praktis 0.70 M³ 2,400,000.00
V PEKERJAAN LISTRIK
1 Lampu 8.00 Titik 265,000.00
2 Stop kontak 5.00 Titik 225,000.00
VI PEKERJAAN SANITASI
1 Saluran air kotor 19 M' 75,000.00
2 Saluran air bersih 16 M' 75,000.00
3 Saptitank 1 Ls 4,500,000.00
VII PEKERJAAN CAT
1 Cat dinding 252 M2 45,000.00
1,225,000.00
385,000.00
1,610,000.00 1.11
12,150,000.00
8,046,000.00
1,680,000.00
21,876,000.00 15.02
28,350,000.00
9,600,000.00
3,600,000.00
3,576,000.00
14,364,000.00
855,000.00
13,680,000.00
74,025,000.00 50.82
12,650,000.00
4,800,000.00
17,450,000.00 11.98
-
2,120,000.00
1,125,000.00
3,245,000 2
1,425,000.00
1,200,000.00
4,500,000.00
7,125,000.00 4.89
11,340,000.00
11,340,000.00 7.78
9,000,000.00
9,000,000.00 6.18
145,671,000.00 100.00