You are on page 1of 1
neato Manual 7 Final installation operations 72 Fataning torque an conto torque af btn point Fastening que cont trque [sim son 72 checkof HW ennectone © chackeating st he cable ns © Check econo the du waar Use toque wrenchto make random inspection to boing pol ofthe saltchoea "> Make anor inspection to ono ale cnactons inde the iene an on the +> chek contd connections fhe cnt aati the low-tage compare any tein ist mtd, shall be med coring tthe ete wing astm 175 unping of suichgear +> sea plce af ft and nt re dry lth to wipe al contact cover and wall bueiog Instore ne ranstomer. The instar srac sa be ee fan a ion overt Paton + Tahanal fing bots 77 Check nd eps ofsurace protective ayer (an nting) “The fllowng products my be wad to rept scratch or caage of he painting sree: + Pltrepa en, sed repair pao damage 82007 178 cneckot instalation operation > Check whether stallion operations ate cate caring athe description in the chaperszdove

You might also like