LNG
NomorSPK ; 234/SPKANGM/2020
TanagalSPK —: 13.0ctober 2020
‘Alamat Pemesan 8 Penagiban :
DT LAIU NIAGA GEMILANG.
kan Sentra Naga BIOK
{Green Lake City, uri Kosambi
SURAT PERINTAH KERJA (SPK) =
Nomor Referens!
[Nomor FP): 042/FPI/HNKM/LNG/IK/2020,
‘Nama Vendor
sam Mansur
“Kel. Levwinanggong RY/RWO1]06
Kecamatan Lemahabang, Crebon
Jakarta 11730) UP. :fisem Mansur
Telp +62 838-6606-1855,
Fax
Email
No KETERANGAN PEKERIAAN SATUAN HARGA SATUAN JUMLAH
|JASA PEKERJAAN PENGECATAN PROYEK SPBU SHELL HANKAM
1 |Pengecstan Building interior 23795 m2__| Ro 38,000 | Rp ERIEET
2_[Pengecatan Buldng 1 Eksterior 383.77 m2 | Rp 20,000/| Rp 3,675,380)
3 [Pengecatan Plint Dinding interior Building T ‘801 _m2 | Rp 35,000 | Rp 280,210)
‘4_[Pengecatan Pint nding Eksterior Suilding T 40.10 m2 [Ro 37,000 [Rp 373,808
'5[Pengecatan Building ? interior 306.55 m2 | Rp 38,000 [Rp 517.828]
6 _[Pengecatan Building Eksterior 32522 m2 | Rp 20,000 | Rp 2,504,480
7” [Pengecatan Pint Dinding interior Buiing 2 9.56 m2 Rp 35,000 | Rp 334513
8 _[Pengecatan Pint Dinding Etsterior Sullding ? 7073-m | Rp 37,000 | Rp 399,198,
9 [Pengecatan Rumah Drum 100 Is] ®p 200,000-[ Re 200,000)
710 |Pengecaran Rumah APAR. 100s | Rp 100,000-[ A 100,000)
11 [Pengecatan Bollard 29.00 unit | Ro 250,000 | Ro 7,250,000]
22 [Pengecatan Bak Kontrol Canopy 3.00-unit | RD 50,000 | Rp 150,000]
25 [Pengecata Pulau Pompa 3.00 unit | RD 700,000 | Rp 600,000
14 [Pengecatan Payment Booth 3.00-unit | Rp 500,000 | Rp 4,500,009
15 [Pengecatan Water Facity 4.00 unit | Rp. 500,000 | Rp 500,000
16 [Pengecatan Tang Benders 3.00-unit | RD '300,000,| Re 900,000
17 [Pengecatan Gril Dranase ingress Fares 32a7m | Rp '50,000 {Ro 7508 500|
18 [Pengecatan Grating 70x70x7 30.00 unit | RP 50,000 | Ro 500,000
79 [Pengecatan Tutup Ol Catcher 1.00-unit | RP 200,000,| Rp 200,000
20_[Pengecatan Tutup Septic Tanj 31.00-unit | Rp 150,000 | Ro 150,000.
21 [Pengecatan Frame Vent Stack 1.00-unit RP 50,000 | Rp 50,000]
22 [Pengecatan Bollard Vent Stack 1.00-unit | Rp 350,000 | Ro 350,000
23 [Pengecatan Bak Kontrol Eettral dan iT 2.00 unit | Ro. 50,000 [Rp 100,000,
24 [Pengecatan Bak Kontrol Grounding 32.00 unit | Rp 30,000 | Rp 120,000
25 [Pengecatan Bak Kontrol Bonding di Decharge Point 11.00"unit RP 20,000 | Re 10,000]
26 [Pengecatan Rumah Pompa 31.00-unit | Rp 7100,000-[ Ro 700,000]
27 [Pengecatan Siu Edge Basm [Ap 20,000 [Ro 7049,000)
728 |Pengecatan Zebra Cross 1100_lot__| Rp 7,000,000 [Ro 000,000
729 [Pengecatan Difable Sign 4100_lot | Rp '150,000,[ Rp 150,000,
30 [Pengecatan Marka Jalan di Area Discharge Point 4100 lot | Ro 500,000,[ Ro 500,000)
‘SUBTOTAL fp S5ASE OS.
‘DISKON| RP 10,456,005
‘GRAND TOTAL] Rp 25,000,000.
‘Term of Payment FOP] ‘Dokumen Pendukung Tagihan
T__[Rotanst Aa bermeterat
‘Pembayaran Sebesar Rp 25.000.000 dibayarkan 7 Hari
1 | Kerja Setelah Pokerjaan Selesa Serta dokumen 2 |AstiBerita Acara dan serahterima Pekerjaan yang ditandatangani oleh kedvabelah pihak
persion et eee nee ENKAE 3__|Bomamentasi Pekerjoan
eee “4 [Copy Surat Perintah Kerja (SPR) yang sudah dtanda tangani
Pembayaran dtujukan Ke:
2 Pembayaran ‘Bank A/C [BCA 3000617488
‘tas Nama [Hlsam Mansur
a
Page 1 of 2