Layout procedure
1. Collect the bulletin/ paper layout
6. Any process out of the bulletin contact the bulletin maker or senior.
7. Running layout.
9. At the first hour provide the capacity graph to the Authorized person PM/FM/IE Exe. ( 4 Day)
th
Work Study: Work study is the process that mainly concerns the critical examinations of human work.
2. Use the most accurate method until providing a sound basis production, planning, control &
incentive.
3. It is the most important tool of analysis.
1. Work methodology.
2. Work measurement.
Work Methodology: Method study is the systematic recording critical examination of the way of doing
things in order to make Improvement.
SRE DE DIM
Primary Idea of 5S
5S stand for
1. Overproduction.
2. Excess Inventory.
3. Waiting.
4. Transportation.
5. Disconnectivity.
6. Rework.
7. Over Processing.