You are on page 1of 6
STERLING & WILSON< REQUEST FOR INSPECTION GLOBELEQ Document Name : RFI Rev. 00 Project Names [sOMW DC/#0 MW ACSOLAR PY PLANT, Lagobaya, Malindi, Kenya RFI No. [SW-MSG-—IR- IPT SITE CONTROL BUTLDING 03 [Date-.19]. Dep: ‘Company Name :- Sterling & artment : - QA/QC ‘Sito Contro! ulldin - Footing Foundation Reinforcement and Shuttring for Footing reinforcement Work Nature/Type| CIVIL @ MECHANICAL 0 _-ELECTRICAL O OTHER O ‘Work Location| Site Control Building Drawing Refrence No.| SWLB-MSG-KEN-40MW.C-DWG-SCB-C-603 FQP Ref No| SW-SEPC-FQP-CVL, RO FQP Clause No] 3.&, A ‘Work Permic Ye @ Noo PTW No] r Checklist Ref No, ‘SW-SEPC-CVL.009 PONo|wainaussneroo,R0 | [Deiatied Description of Activ Times Site Contaol bei eae & Gendactiorn Forking eindwerine nd F Shuterng fo Aeoking [Attachments = [cede B= Approved with comments [Comments 2 pon rind Sid! sfetdirg bit¢rdig flit [Distribution A. Original Copy Document Controller SW. Soft Copy to Client, Site Malindi & Contractor Footer Tad For Sern & Wilken For MSG/GUORELED [Job Titte pm AM GALaC ELYIEX [Name signature . ML: {Ae nt — 9 Se sue ‘STERLING AND ] INSTALLATION CHECKLIST FOR Document No. eee REINFORCEMENT. SW-SEPC-CVL-009, Rev: 00 Project Name: leans ce] AM WAL Soiag Pv RANT, Lonjoboya, Metink wenn Drawing / Specification No.: SuiLB- MSG ~ KEN AME = C= DUI SCE = C= OS, Site Location / Area: Sife Contrat Puding Inspection Date: {9} 1)|219 | = DESCRIPTION ves | NO | N/A) — Remarks | isthe bar bending schedule approved by the a client? | 2 | 5 the reinforcement steel stacked on @ raised | 7 | platform minimum 300 mm above ground level? ‘Are the reinforcements free from dirt, grease, oll and paint? v fre the reinforcements tested for roling margin and | approved by clients and are the records maintained? | Afe the reinforcements tested from external agencies as | 7 per contract agreement? ‘Are the rods cut & bent as per the approved BBS? Before placing rods, is the centering leveled and mould 7 | release oil applied? i 5 fg _| |S Placing of the rods (spacing, position ofthe bars, ete) as | 7 specified in the structural drawings? 9 | Ave laps staggered and provided only at the approved | locations of the structure? 10__| Are laps in column avoided at column beam junctions? Wr 11_| Are the lap lengths provided as per structural drawings? [7 Is the cover to main reinforcement provided as per rawing? Footing bars Bottom fS ™) sh Sides 7 om™ v 12 | Column bars sides | Slab bars Bottom || Sides | Beam bars Bottom ¢ Sides 13 _| Are sufficient No. of covers to reinforcements provided? |” 14 [AP spacer bars provided in between layers of reinforcements in beams? Vv ‘Are the layers of steel in beams tied properly in position as per drawing to avoid any dislocation while concreting? 15, 1g | Are sufficient chairs provided to keep the layers of steel in position at slab, raft, etc? | Page 1 of 2 STERLING AND INSTALLATION CHECKLIST FOR: Document No.: WiLsoN REINFORCEMENT SW-SEPC-CVL-009, Rev: 00 Project Name: Bua De] dom Ad clay Py Pleat eaniplemyiny Meck nds as an DESCRIPTION ves | NO | N/A) — Remarks is the welding of reinforcement steel, mechanical splicing if any) done only with prior approval of structural “le consultant? ‘Are any dowel bars to be provided? 48 Vv ‘Are reinforcing bars in slab, beam, and footing etc, 39 | propery tied? ve 20_[ is proper binding wire used for tying bars? Uv 31._| 5 the substitution of bars (any) done only with prior ey approval? ied E | Checked by S&W: Fo, Noein Witnessed by Client. Z4AI2L 2222/7, | Signature: z Signature: a (Date: Wa] Dat LL Les & a Page 2 of 2 ‘STERLING AND INSTALLATION CHECKLIST FOR Document No.: penn ‘SHUTTERING WORK FOR FOUNDATION ‘SW-SEPC-CVL-005, Rev: 00 Project Name GeMUd O6/stemes Ae Solar PY Blank, lappobype, ralindc, Benga, Drawing / Specification No.: Sul(B - M10 -KEN- “Worm = O— Dulth - SCD = C= aS Site Location / Area : ite contno! Bullaing Inspection Date: 19( 11119 T Se DESCRIPTION ves | NO | N/A| — Remarks 1 | Shack the marking done as per drawing | measurements Check the inner measurements of foundation sides 2 v shuttering 3 Check the supports / tie rods provided are we sufficient to take the concrete pressure. Check whether form work is erected over the 4. | marking and the column marking is exactly at the | _/ centre. @ | Whether gaps between shuttering boards are 7 sealed with masking tape? v Check for right angle of formwork. 7 Whether mould release ol is applied on the 8 boards? 10 | Whether proper cover is maintained to the | > reinforcement bars? 12 | Check for stability of scaffolding around column ue 13 _| Check for vertical stability, plumb before concrete ams 14 | Check for vertical stability, plumb after concrete 15 | 'S the working platform and safety arrangements are adequate? ‘Comments if any: Checked by S@W: (ra. an Witnessed by Client: ZAP ADE A) Signature: Lay r Signature: Date: 19/14 fe [Dates LiL ae: Page 1 of 1 Gat nd Sra i TODENVOSANS Jo Neus a Cora aoagins | Peewee FMP | Go temp mas0e avy ProurovAgury | e Rees oe al | ee Ur pore be Proord oars | cadlevel puny gou Ryoods rays! © “Prrgacurs svajoq: aed Uo hms teas | Bay imcou09 vig Pd wang Andeto & ysrrcq su Ysp Fs >520/| IP 29% Lapaquorgns Y FerImasuy | 7 | fe18 ee fy rainnwro Sarmepeonams | saRyiE Gog ab PoneyegS [Toe aseoq) * | Suniel ~ +6360 “904090 “SO"naS6"'xd) — £99 -2- BES -VMA - 2 - Mot -NIA- OSL -BIMS ¥O~ ONICIING 70A1LNOIDLTS -Lar -ax -Osw-ms - ( iG

You might also like