You are on page 1of 3
NCCLIDMRCIPMRTS/617/2020-21 To, ‘The Project Director! Patna Metro-1 Coridor-2, DMRCL, Patna, Bihar-601503 Kind Attn: Mr. Sushil Kumar, PD, DMIRC, Patna NCC Date-2/.06.2021 ‘Sub: CONTRACT PC-01: Part Design and Construction of Elevated Viaduct, Viaduct connection to Depot including elevated ramp for Depot, Stabling & Extension of Viaduct for Corridor-1 at Khemni Chak Station, Special Spans, Elevated Ramp at Malahi Pakri and Five Elevated Stations viz. Malahi Pakri, Khemni Chak (Interchange station), Bhoothnath, Zero Mile & New ISBT (Excluding Architectural Finishing works of stalions & PEB works of stations) from Chainage 8020.00 mi. to 14127.726 mt, of Patna Railway station to New ISBT Corridor-2 of Phase-1 of Patna MRTS. Sub: Submission of Drinking Water Pipe Line Drawing Ref: 1.LOA No. - DMRC/20/111-700/2020 Date-18.09.2020, Dear Sir, ‘This is with reference to subject and subsequent LOA; we are submitting herewith proposal drawing for shifting of drinking water pipe fine of Patna Jal Board during construction of elevated viaduct from Malahi Paki to New ISBT. We request you to kindly accord you approval al the earliest. Thanking and assuring you of our best services at all imes.ss With Regards For NCC Limited “yf yy? hy. Authorized Signatory (Rajnish Kumar Mishra) (Project Manager/Team Leader) Enclosure: Drawing of pipe fine NCC Limited (Formerly Nagarjuna Construction Company Limited) CIN No.L72200AP1990PLCO11146 MRTS Project Office, Patna D-24, P.C Colony, Kankarbagh, Patna, Bihar - 800020 E-mail ID: bldgs.patnametro@nccitd.in, www.ncclimited.com Page Loft | MALAHI PAKRI NEW ISBT sre ATER UNE ‘rr exisTnG waTeR UME (6 PROPOSED WATER UNE contractor. ~NAGARJUNA CONSTRUCTION COMPANY "Pari Design and Constiction of Eievaied Viaduct, Viaduct connection to Depot including elevated ramp for Depot, Stabling & Extension of Viaduct for Corridort PROJECT: a Khem Chk Staion Special Spans, Elevated Ramp at Mala Paki and Five Elevated Salons. ve. Malai Paks, Khemni Chak (Interchange station) Bhoothnath, Zero Mite & New ISBT (Exchuding Architectural Finishing works of slations & PEB works of stations) from Chainage 8020.000 mt. to 14127.726 mt. i : of Patna Rail tion to New ISE i Client: of P iway station BT Copier hace tstFsina MAES ——] PROPOSAL FOR SHIFTING OF DRINKING WATER PIPELINE OF "PATNA JAL PATNA METRO ORATION LTD. PRG-TITLE goaRD* DURING CONSTRUCTION OF ELEVATED VIADUCT FROM MALAHI oy PAKRI TO NEW ISBT. MALAHI PAKRI ‘SSRN 1 wus aren ne Na Froroo men NEW ISBT S PATNA METRO R, ORATION LTD. w= SS g 2 ee SS SsassSicc SS SSN SS a Se = a we SS SV SS STZ SS SS RS SS: SSK TH ay i SS a =e c sania os | & _— ‘AAT PARTIR ARG ‘80- net -W- i = = Re & ESS |/ SSS SSS||ERSSRSS Sj S SS NERS S S SSS has] RS << SS F SSS RSS Ss HSS iS | &S NG SERS PERS ae QO Biisting Drinking Water Line O Proposed Water Line LHS RHS ae tb = 2 [A Sf | 1.80 | contractor ~NAGARJUNA CONSTRUCTION COMPANY | Part Design and Construction of Elevated Viaduct, Viaduct ésanection te Depot | including elevated ramp for Depot. Stabing & Extension of Viaduct for Corridor | _ JECT. at Khem Chak Station Special Spans, Elevated Ramp at Malai Pak and Five L His 4 PROJECT: Frevated Stations vz.” Malai Paks Khemni Chak (interchange. station) Bhootnnath, Zero Mile & New ISBT (Excluding Architectural Finisting works of SECTION A-A & BB — —— = stations & PEB works of stations) from Chainage 8020.000 mt. to 14127.726 mt. Client: of Paina Rainay sation © New ISBT Copsersetthesesteinesinzs— DRG. TITLE PROPOSAL FOR SHIFTING OF DRINKING WATER PIPELINE OF "PATNA JAL BOARD" DURING CONSTRUCTION OF ELEVATED VIADUCT FROM MALAH! PAKRI TO NEW ISBT.

You might also like