DATE DEPTH OPERATION AT DRILLED MUD

26/09/98 3200 BUILD MUD 0 12


27/09/98 3200 CIRCULATE AND 0 12
28/09/98 3200 MIXING 50 BBLS 11
29/09/98 3200 BUILDING MUD 0 11
30/09/98 3200 WORKING ON 0 12
01/10/98 . 3200 WELL CLOSING 0 12
2/10/98 3200 BUILDING MUD 0 12
3/10/98 3200 HOLDING 0 12
4/10/98 3200 CIRCULATING 0 12
OPERATIONS
R/D PLT and Schl,open well and flow on 48/64" choke,flow well on 64/64" choke switch thru separator temp
Cont'd build up volume,pumped 60 bbls LCM pill and displace to bottom w/ 60 bbls mud,observe well,remove
Circulate and condition mud to 11.6 ppg in and 11.3 ppg out,unseat RTTS Pcaker,pumped 60 bbls LCM
Monitor well.open well,circ. thru poorboy,continued to circ. over shaker,well started
Continued build mud volume,pumped 60 bbls 11.6 ppg mud,bullhead 1000 bbls inhibited water down
Continued working on stuck pipe, free, well started flowing, close in well SICP : 250 Psi, SITP : 0 psi,
Continued to build mud,open well,POOH 5 stds tbg, pumped 60 bbls mud,bullhead 1500 bbls water down
Continued circulating and building mud volume,work pipe/ well still swabbing while pulling,set RTTS
Cont'd POOH w/ 31/2" tubing, pump out, M/U bit and BHA ,RIFI to 1300 m and 2400 m, R/D test plug,