DATE DEPTH OPERATION AT DRILLED MUD

10/9/98 3200 PRESSURE 0 12


11/9/98 3200 FINISH POOH 0 12
12/9/98 3200 CONTINUE TO 0 12
13/09/98 3200 CONTINUE TO 0 12
14/09/98 3200 LAY DOWN DST 0 12
15/09/98 3200 RIH 0 12
16/09/98 3200 RIH W/ TOOLS 0 12
17/09/98 3200 SHUT IN AT LPR- O 12
18/09/98 3200 WAIT ON 0 12
19/09/98 3200 R/U AND 0 12
OPERATIONS
Cont'd to circulate at shoe,RIH to 3072 m,wash to bottom,Circulate clean well,POOH to shoe,Circulate well &
M/U and RIH w/ bit to bottom, while R/U schlumb test equipment,Circulated,POOH to pick up DST Tools.
P/U and M/U Haliburton DST Tool,Pressure test BHA,RIH w/ 22 stds tubing,Pressure test top of fresh water
Cont'd pressure testing Schiumb. Lines repair leaking seperator inlet valve and pressure test to 1000 psi ,Hook
Cont'd pressure testing Schlumb.lines repair leaking seperator inlet valves and pressure test to 1000 psi still
Continue to POOH and Lay down test tools,M/U and RIH bit to bottom,Circulate well clean and cool down
Circulate hole clean,POOH,P/U and M/U DST tools for barefoot DST # 1,Wait on Schiumb to repair gauge
Finish run tubing,set packer,P/U and WU flowhead,open well slowly to 36/64" choke,Gas too wet to light in
Well shut in at LPR-N and choke manifold,flow well on 12/64" choke H2S=50 ppm increasing to 90
Remove flowhead from tubinginstall stabbing valve,break out swivel ,open LPR-N to close choke,pressure