11/9/98 3200 FINISH POOH 0 12 12/9/98 3200 CONTINUE TO 0 12 13/09/98 3200 CONTINUE TO 0 12 14/09/98 3200 LAY DOWN DST 0 12 15/09/98 3200 RIH 0 12 16/09/98 3200 RIH W/ TOOLS 0 12 17/09/98 3200 SHUT IN AT LPR- O 12 18/09/98 3200 WAIT ON 0 12 19/09/98 3200 R/U AND 0 12 OPERATIONS Cont'd to circulate at shoe,RIH to 3072 m,wash to bottom,Circulate clean well,POOH to shoe,Circulate well & M/U and RIH w/ bit to bottom, while R/U schlumb test equipment,Circulated,POOH to pick up DST Tools. P/U and M/U Haliburton DST Tool,Pressure test BHA,RIH w/ 22 stds tubing,Pressure test top of fresh water Cont'd pressure testing Schiumb. Lines repair leaking seperator inlet valve and pressure test to 1000 psi ,Hook Cont'd pressure testing Schlumb.lines repair leaking seperator inlet valves and pressure test to 1000 psi still Continue to POOH and Lay down test tools,M/U and RIH bit to bottom,Circulate well clean and cool down Circulate hole clean,POOH,P/U and M/U DST tools for barefoot DST # 1,Wait on Schiumb to repair gauge Finish run tubing,set packer,P/U and WU flowhead,open well slowly to 36/64" choke,Gas too wet to light in Well shut in at LPR-N and choke manifold,flow well on 12/64" choke H2S=50 ppm increasing to 90 Remove flowhead from tubinginstall stabbing valve,break out swivel ,open LPR-N to close choke,pressure