INSULATION RESISTANCE TEST
‘Test Procedure : Connect a 500V Megger Tester between phases, phase
‘to netural, phase to earth and neutral to earth respectively with all control
devices and current consuming apparatus disconnected.
TEST RESULT :
Project : Holla {tes S o
Equipment: __ O° TEN NY CS. Foo CTE No -3
Test Insulation resistance Mohm, with all switching devices
Opened Closed
L1-L2 200 266
EELS 200 100
bis 20 200
biases DS 206
L2-13 200 20
12.N 200 20
ae 206 200
ISN 260 200
13-E : 260 200
xe Af - £0 i]
Tested By : Kl ( Laude
Z >
wines ZEA” _cHREA pate 14/3/20SAIS]
JEFF AIR CONDITIONING Co. Ltd.
RM, 1000, 10, NO. 69 JERVOIS STREET, SHEUNG WAN, HONG
TEL: 2548 2339 FAX: 2543 2555,
DD
rRIC
ST ( BS5486 PART I : SUB-CLAL
Purpose of Test : To verify the dielectric properties between all live
parts and the frames of FBA
INSULATION RESISTANCE TEST
‘Test Procedure : Connect a 500V Megger Tester between phases, phase
to netural, phase to earth and neutral to earth respectively with all control
devices and current consuming apparatus disconnected,
TEST RESULT : fe
Project : Halls ome Hox
Rquipmest: —__Cerdenariv, Duar. fae kfo
Test Insulation resistance Mohm, with all switching devices
Opened Closed
LLL? 149 300
LI-L3 | 200
LEN aoe
LLE a2 ee
L2-L3 iq é 200
12N —_
Tau a5 2 |
L3-N oe
BE ql 200
NE i a
‘ oH ~_¢ Ldesid ( hey
‘Tested By + a D d Cy
Witness Je x Ae CHLREA. > ee fe /Por\EER RAIRA A]
JEFF AIR CONDITIONING Co. Ltd.
RM, 1002, VF, NO. 69 JERVOIS STREET, SHEUNG WAN, HONG KONG
TEL: 2543 2339 FAX: 2543 2558
DIELECTRIC TEST ( BS5486 PART | : SUB-CLAUSE 8.3.2)
Purpose of Test : To verify the dielectric properties between all live
parts and the frames of FBA
INSULATION RESISTANCE TES
Test Procedure : Connect a SOV Megger Tester between phases, phase
to netural, phase to earth and neutral to earth respectively with all control
devices and current consuming apparatus disconnécted,
TEST RESULT
Project : \ 6 t Pee
Equipment : chile. ie, ee Pe 2 No. ~
‘Test Insulation resistance Mohm, with all switching devices
Opened Closed
LI-L2 b 3 > Yel
Te