You are on page 1of 3
ERR RAIRA F] JEFF AIR CONDITIONING Co. Ltd. RM, 1002, 10/E, NO. 69 JERVOIS STREET, SHEUING WAN, HONG KONG ‘TEL: 2543 2339 FAX: 2543 2558 DIELECTRIC ST (BS5486 PART 1 : SUB-CLAUSE 8.3.2) Purpose of Test: To verify the dielectric properties between all live parts and the frames of FBA INSULATION RESISTANCE TEST ‘Test Procedure : Connect a 500V Megger Tester between phases, phase ‘to netural, phase to earth and neutral to earth respectively with all control devices and current consuming apparatus disconnected. TEST RESULT : Project : Holla {tes S o Equipment: __ O° TEN NY CS. Foo CTE No -3 Test Insulation resistance Mohm, with all switching devices Opened Closed L1-L2 200 266 EELS 200 100 bis 20 200 biases DS 206 L2-13 200 20 12.N 200 20 ae 206 200 ISN 260 200 13-E : 260 200 xe Af - £0 i] Tested By : Kl ( Laude Z > wines ZEA” _cHREA pate 14/3/20 SAIS] JEFF AIR CONDITIONING Co. Ltd. RM, 1000, 10, NO. 69 JERVOIS STREET, SHEUNG WAN, HONG TEL: 2548 2339 FAX: 2543 2555, DD rRIC ST ( BS5486 PART I : SUB-CLAL Purpose of Test : To verify the dielectric properties between all live parts and the frames of FBA INSULATION RESISTANCE TEST ‘Test Procedure : Connect a 500V Megger Tester between phases, phase to netural, phase to earth and neutral to earth respectively with all control devices and current consuming apparatus disconnected, TEST RESULT : fe Project : Halls ome Hox Rquipmest: —__Cerdenariv, Duar. fae kfo Test Insulation resistance Mohm, with all switching devices Opened Closed LLL? 149 300 LI-L3 | 200 LEN aoe LLE a2 ee L2-L3 iq é 200 12N —_ Tau a5 2 | L3-N oe BE ql 200 NE i a ‘ oH ~_¢ Ldesid ( hey ‘Tested By + a D d Cy Witness Je x Ae CHLREA. > ee fe /Por\ EER RAIRA A] JEFF AIR CONDITIONING Co. Ltd. RM, 1002, VF, NO. 69 JERVOIS STREET, SHEUNG WAN, HONG KONG TEL: 2543 2339 FAX: 2543 2558 DIELECTRIC TEST ( BS5486 PART | : SUB-CLAUSE 8.3.2) Purpose of Test : To verify the dielectric properties between all live parts and the frames of FBA INSULATION RESISTANCE TES Test Procedure : Connect a SOV Megger Tester between phases, phase to netural, phase to earth and neutral to earth respectively with all control devices and current consuming apparatus disconnécted, TEST RESULT Project : \ 6 t Pee Equipment : chile. ie, ee Pe 2 No. ~ ‘Test Insulation resistance Mohm, with all switching devices Opened Closed LI-L2 b 3 > Yel Te

You might also like