You are on page 1of 14
CY ausin ayaa cine auwgo eG ESSAM AL-QUFAILI TRADING Co. 30000 5000 5000 [ | Dk Internal platform 4 Microwave 1 HES som. 2 Internal platform 4 Microwave tentenna brackets +44 3 Internal platform (SG [__Liooxs: Le3xS [= 050xS. LIOOXS Le3xS Lé3x5. LIPSxI0 L70x6, L70x6 LIeSxI0, L70X6. C70X6. LI40xie jeL75X6, L75xé a1 Internal platform section 0m 3 legs Angle tel Tower Drawinge= Led. LAN Cross section Heber Teng Yang Stee! General notes: 1, Design parameters: 1.1 Wind velocity = 150kph,3s qust wind speed 1.2 Wind loads as per ANSI/TIA-222-G 1.3 Antenna loading: 6*GSM(3m*0.3m*0.11m) at the top 6*GSM(3m*0.3m*0.11m) at the 3/4 of the height of the tower 4*MW(3m)at 2.5m from the top 4*MW(3m)at the 3/4 of the height of the tower 1.4 Exposure category = C 1,5 Topographic category = 1 1.6 Clsification of tower = II 1.7 Max. twist & sway = £0.5 degre at 70%*150kph 2.Material 2.1 Tower structure shall be Q420B & Q355B for legs, splice plates, tower shoes and anchor plates. And 2358 for other members. 2.2 Bolts shall be ISO grode 8.8 or equivalent. 3.Calvanizing and erection 3.1 Galvanizing to be in accordance with ISO 1461 specifications. 3.2 All components include bolts shall be hot dip galvanized. 3.3 Tower anchor bolts shall be embedded truly aligned and leveled with the aid of pale. 948 pol template. 4.,All dimensions are in mm unless otherwise specified. Ef ESSAM AL-QUFAILI TRADING Co. zy @ylaill enlyaall olmc Guugo Details of embedded parts 1500 Material List No. | Specifiaton ow. Remark 1 | 036, 2 | -so0xe 3 nat H36 4 | -s00x10 [100 Location plan of embedded parts, Note: 1. Dimensions are in millimeters. 2, Steel frame JG adopts Q235B sti seam height is 10mm, all around welding. jelding rod adopts £43 type, welding (Heber Teng Yang Steet e Structure Co., Ltd 30m 3 legs Angle Steel ‘Tower Embedded Parts Drawing 20201 GJ-1 EY suet susan pine ausso en 3@ ESSAM AL-QUFAILI TRADING Co. 2000 00 CO alka! Foundation on top view al 3642 mA i 4l “TH bom} 8-8 Mater ust a, nea A 2) fio. | spec. |Lengen Lom aah} Remark 2 a London Ta [eam os ia as y % Eos [se [oe 2 S a € 3 |b14 | 4900 | 52 321d — + g [sie [ow [or teen] 7514 [ See seo 25 S : me | Cath Gea eR es N TTR oN: 1. After the foundation pit is cleaned and leveled, 2 m0 the eatin Is pourey the usnan mage of C15 concrete; the foundation is made of C30 concrete. ‘The ground endurance of this foundation is 130KN/m2. 2.Stee! reinforcement: HPB300, HRB400. 3. Foundation construction should be carried out in| strict accordance with the "Code for Construction and Acceptance of Foundation and Foundation Engineering". 4.Foundation construction root opening dimension error <+10MM; The level of the templates is high a5MM. 5. The foundation backfill sll is compacted once for one layer of 300mm, and its bulk density should be greater than 1.6 tons/cubic meter; the surface should be equipped with a proper drainage slope. 6. The protective layer without indicating is 50mm. (Heber Teng Yang Steer Bea ne Pepe ot Layout of foundation reinforcement aE 30m 3 legs Angle Stee — a Foundation Drawing JC—1 igo “en ESSAM AL-QUFAILI TRADING Co. “Lrv4u il splat! ole dus: ean ient 700 foundation Ground embedding drawing Horizontal connection zone srondpg gece Qe foundation Layout of grounding grid 20 2000 Ground electrode amplification x Material List No. | spec. Length|aty,| 2ualt¥ aaa ae Fey |) a Microwave Antenna Brackets J + N CY ausin ayaa cine auwgo an ESSAM AL-QUFAILI TRADING Co. 4215 tae 9 201 @\/r1 oe a_| 2 v0 201 p30 29015 tle tone column ee ad ea my am a GSM Antenna Brackets c aylaill -nlyaall ole autwgo se00 4400 joints Ladder front & side view Ladder fixed ro a8 Ladder en. 3@ ESSAM AL-QUFAILI TRADING Co. c aylaill -nlyaall ole autwgo an ESSAM AL-QUFAILI TRADING Co. ‘Sr ble 215 lo}ojo} Tor tp ihn ed bi re ection siti Hae ee Lightning Rod

You might also like