You are on page 1of 4
aa Preparation of Tube Co Maximum height H for Straight tube end Minimum length for shor piece of tube Series | tt Series L Series 'S Series: Tube od. [4] 6] 8 | 6] 8 |10]12[15] 1822] 28]35]42| 6 | 8 | 10] 12] 16]20|25]30|38 Hmin |24|25[26] 31] 31]23) 33] 36[28|42| 2/0] 4a] 95|25) 97] 37|45[50] 54] 58|65) Lain [3032] 38|39|59] 42|42|45]48]53]53] 60| 60] +4] 44] 47|47[54] 6358] 73] 82| Saw off Tube at 90° Do not use Tube cutters oo Tube cut with tube cutter generates heavy burr/bevel cut oe, Saw off Tube Deburr inside and Outside edges of tube upto 0.2x45° Lubricate threads (Exteral and Internal), cone of the Coupling body and the Ferrule Slip the Coupling Nut and Ferrule over tube end Ensure Coupling Nut and Ferrule are facing the right way A Correct Incorrect Screw the Coupling Nut Tighten the coupling Nut manually on to Coupling body by spanner until the tube until finger tight. stops rotating by hand Mark the Coupling Nut and Tighten the Coupling Nut holding device to measure the around 1 1/4 to 1 1/2 round prescribed turns Tube must not rotate ONT eee Sectional View of Straight Coupling assembly with Tube —,

You might also like