HUME QUOTATION INQUIRY

Project: CADANGAN PELEBARAN JALAN DARI TAMAN KOTA MASAI KE TAMAN PASIR PUTIH, ( JALAN KOTA
MASAI 1).
MUKIM PLENTONG, DAERAH JOHOR BAHRU, JOHOR DARUL TAKZIM

ITEM RATE AMOUNT


DESCRIPTION QTY UNIT
NO (RM) (RM)

Box Culvert

115 m
600mm x 600mm hume precast concrete box culvert or approved
equivalent including excavation, 50mm thick lean concrete;
150mm thick well compacted hardcore, part backfill, compact
and excess dispose off; etc. all as per Engineer's Drawing no.
MPPG/CV/JKM1/RD03

M8 Beams

Supply and Deliver to site for Precast Pre-Tensioned 22 nr


M8 beam to Manufacturer's detail including unloading,
launching ,fixing of position M8 beams