You are on page 1of 16

Journal of Glaciology (2016), 62(236) 1049–1064 doi: 10.1017/jog.2016.

97
© The Author(s) 2016. This is an Open Access article, distributed under the terms of the Creative Commons Attribution licence (http://creativecommons.
org/licenses/by/4.0/), which permits unrestricted re-use, distribution, and reproduction in any medium, provided the original work is properly cited.

Rapid Access Ice Drill: a new tool for exploration of the deep
Antarctic ice sheets and subglacial geology
JOHN W. GOODGE,1 JEFFREY P. SEVERINGHAUS2
1
Department of Earth and Environmental Sciences, University of Minnesota, Duluth, MN 55812, USA
2
Scripps Institution of Oceanography, UC San Diego, La Jolla, CA 92093, USA
Correspondence: John W. Goodge <jgoodge@d.umn.edu>

ABSTRACT. A new Rapid Access Ice Drill (RAID) will penetrate the Antarctic ice sheets in order to create
borehole observatories and take cores in deep ice, the glacial bed and bedrock below. RAID is a mobile
drilling system to make multiple long, narrow boreholes in a single field season in Antarctica. RAID is
based on a mineral exploration-type rotary rock-coring system using threaded drill pipe to cut
through ice using reverse circulation of a non-freezing fluid for pressure-compensation, maintenance
of temperature and removal of ice cuttings. Near the bottom of the ice sheet, a wireline latching assem-
bly will enable rapid coring of ice, the glacial bed and bedrock below. Once complete, boreholes will
be kept open with fluid, capped and available for future down-hole measurement of temperature
gradient, heat flow, ice chronology and ice deformation. RAID is designed to penetrate up to 3300 m
of ice and take cores in <200 hours, allowing completion of a borehole and coring in ∼10 d at each
site. Together, the rapid drilling capability and mobility of the system, along with ice-penetrating
imaging methods, will provide a unique 3-D picture of interior and subglacial features of the Antarctic
ice sheets.
KEYWORDS: Antarctica, bedrock coring, ice drilling, million year-old ice, subglacial access

1. INTRODUCTION system in Antarctica on a variety of timescales, but our under-


By many measures, Antarctica is the last continental frontier. standing of these interdependencies is derived from only a
Although more than 98% of Antarctica’s geology is hidden tantalizingly small body of data. Focused study of the rela-
beneath ice cover, coastal and mountain exposures demon- tionships and feedbacks between these elements is possible
strate an ancient ancestry tied to early crustal growth through multidisciplinary research in geology and geophys-
and supercontinent evolution (Harley and others, 2013). ics, glaciology, paleoclimate and microbiology, providing
Antarctica is also central to changing global climate patterns, a unique opportunity to better understand the temporal-
both as a recorder of past changes and as a sensitive witness spatial variations and operative dynamic processes in a
to changes currently underway, providing crucial motivation polar continental setting (Zapol and others, 2011). Since
for future research on ice-sheet and global climate systems. the time of the International Geophysical Year in 1958,
Marine records and general circulation models suggest that scientists have pushed ever deeper into Antarctica, both
the major ice cap of Antarctica nucleated ∼34 Ma (Zachos across and through the major ice caps. Now, decades later,
and others, 1996; DeConto and Pollard, 2003), but the inter- Antarctica remains a cryptic but accessible natural laboratory
ior structure of the ice sheets are poorly known and major in which to study a polar continent and its overlying ice
questions remain about their expanse and persistence over sheets, subglacial mountains and subglacial lakes.
time. Existing ice cores provide a paleoclimate and green- However, because Antarctica is ∼89% the area of the con-
house-gas record reaching back 0.8 Ma, but there is very tiguous US and Europe combined, the vast scale offers both
likely to be older ice that preserves a record of the enigmatic scientific and logistical challenges. Furthermore, a significant
climate transition that occurred between 1.3 and 0.9 Ma impediment to our understanding of dynamic change in the
(Fischer and others, 2013; Van Liefferinge and Pattyn, Antarctic earth system is our inability to quickly obtain
2013). In this event, known as the ‘mid-Pleistocene transi- samples at the deepest levels of the ice caps. Ice coring pro-
tion’, well-ordered 41 ka glacial cycles driven by orbital ob- grams, for example, typically take several years and tens of
liquity gave way to irregular ∼100 ka glaciations whose millions of US dollars to complete.
origin is still not well understood (Raymo and others, 2006; Access to deep (therefore ancient) ice and bedrock
Lisiecki and Raymo, 2007). geology over large areas of the Antarctic interior will allow
Knowledge derived from a variety of disciplines now scientists to address a wide range of interdisciplinary ques-
points to important linkages between the solid earth, atmos- tions, including, from top to bottom:
phere, cryosphere and biosphere. The connected geologic,
glacial and hydrologic elements of this integrated system (1) can we find >1 Ma ice and, if so, what paleoclimate in-
play a critical role in global climate changes currently under- formation does it contain?
way, including future sea level, and detectable changes in (2) what caused the switch from 41 to ∼100 ka glacial
Antarctica provide a measure of the broader climate vari- cycles ∼1 Ma?
ation. Rock, sediment and ice all harbor critical information (3) what is the current dynamic behavior of the major ice
about past changes to the landmass, ice caps and climate caps?

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
1050 Goodge and Severinghaus: Rapid Access Ice Drill

(4) how much will sea level rise in the future due to
Antarctic ice loss? Box 1. RAID science requirements.
(5) what are the physical conditions and material properties
of the ice/rock interface?
(6) what is the subglacial landscape history? (1) Provide borehole access to 2500–3300 m
(7) what do interior sedimentary basins tell us about long- depth in a short timeframe
term ice-sheet stability? (2) Drill in dry, frozen-bed conditions in order to
(8) is there life at the base of the ice sheets?
avoid contaminating the subglacial
(9) what is the effect of subglacial heat flow on ice-sheet
hydrologic environment
stability?
(10) what is nature and history of Antarctic lithosphere? (3) Retrieve short ice cores (∼50 cm) at depth
(reconnaissance for old ice)
Questions such as these drive an inter-related set of goals for
gaining deep access within the Antarctic ice sheets, includ- (4) Sample the bed interface and retrieve a
ing: (a) documenting the presence of Eemian-age ice to test minimum of 25 m of bedrock cores (up to
models of ice-sheet collapse in West Antarctica (∼125 ka); 5 cm diameter)
(b) understanding the mid-Pleistocene transition from 41 to (5) Traverse over ice and be self-sufficient,
100 ka climate cycles (by sampling ice as old as ∼1.5 Ma); alleviating need for fixed camps
(c) evaluating the thermal, mechanical and biological condi- (6) Provide a clean borehole that remains open
tions at the base of the ice sheets; (d) exploring the deep in- for optical ice-logging, heat-flow
terior geology of Antarctica for the first time, including the
measurements and other down-hole
characterization of geophysically-imaged geological fea-
observation.
tures; and (e) testing models of cratonic growth related to
supercontinent assembly in the Mesoproterozoic (∼1 Ga).
To address these questions in deep ice, we need the ability
to rapidly penetrate the Antarctic ice sheets in multiple loca-
tions. The concept for such a drilling technology has circulated
These six core science requirements have carried through
in the science community for some time. Early ideas for fast
every stage of RAID development, informing concept,
mechanical access drilling in ice and subglacial bedrock
design, engineering and our planned future operations.
were described by Clow and Koci (2002), but cost and tech-
A key to RAID is its ability to make deep boreholes in
nology limitations prevented their development. This paper
Antarctica, providing access for logging, core sampling and
outlines the scientific goals, guiding principles of engineering
placement of borehole instrumentation. More importantly,
and environmental stewardship, technical design and status of
by virtue of high-speed ice cutting, this drilling system will
a Rapid Access Ice Drill (RAID) currently in development for
be able to make multiple boreholes per field season.
the US Antarctic Program. RAID is being developed by the
Together then, the mobility, rapid drilling rates, and deep
authors with support from the US National Science
penetration will allow RAID to make numerous penetrations
Foundation to support the scientific goals outlined above,
to the base of the Antarctic ice sheets and thereby establish a
and after further testing it will be put to use as a research instru-
borehole array, or observatory. In addition to rapidly making
ment in Antarctica with broader community participation.
boreholes, this drilling system will be used to sample ice,
glacial bed materials and bedrock using a rotary diamond
coring assembly inserted by wire line. RAID thus provides
2. SCIENTIFIC GOALS both deep borehole access and the ability to core solid mate-
RAID is intended as an ice and rock drilling system that can rials. Future development of equipment for clean access will
give the scientific community access to a rich record of geo- also allow RAID to explore areas where ice is melted or for
logical and glaciological change on a variety of timescales, penetration into subglacial lakes.
from the billion-year rock record to thousand-year ice and In addition to its interdisciplinary focus, RAID is also
climate histories recorded at the interface between the ice designed to be autonomous, lightweight and environment-
sheets and underlying solid earth. The RAID drilling platform ally benign. These design parameters for RAID reflect a
is mobile, fast and capable of coring both deep ice and need to economize and add efficiency to activities within
bedrock, providing unprecedented access to critical parts the US Antarctic Program, as highlighted by Augustine and
of the coupled cryosphere and solid earth. RAID therefore others (2012). Borrowing the catchphrase ‘lean, mean, and
represents a significant technological step forward for glacio- green,’ a central theme throughout the RAID design
logical, paleoclimate and geological research. This new dril- process has been to build in operational autonomy, inde-
ling platform also supports the vision of future Antarctic pendence from airlift support, compact and lightweight tra-
research (Zapol and others, 2011) by deploying new verse capability, nimble and swift operation, energy
sensors, creating remote observing networks, enhancing efficiency, drilling fluid conservation, low environmental
interdisciplinary research and providing data and samples impact, minimal staffing and minimal footprint of scientists
that can constrain earth system models. in the field. As detailed below, the RAID system is container-
Basic scientific goals used to define the capabilities of ized and towable by tractors in a mobile format, thus being
RAID were developed at a workshop in Herndon, Virginia, capable of visiting several sites per season without establish-
sponsored by the Ice Drilling Program Office in 2011 ing fixed camps. We currently estimate a complete drilling
(Goodge and others, 2011). Refined by further technical cycle, from site preparation through setup, drilling and
and logistical considerations, six resulting goals for the dril- coring to break-down and mobilization, of <200 hours.
ling system are listed in Box 1. This will also be achieved by minimizing personnel; ideally

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
Goodge and Severinghaus: Rapid Access Ice Drill 1051

comprising 2–3 three-person drilling crews for 24-hour set of competing parameters, the resulting RAID design,
operations plus additional traverse staff. Scientific personnel described below, achieves an optimized balance of speed,
are not expected to travel with the drilling system, in order to efficiency and minimal environmental impact.
reduce field support requirements in favor of efficiency; tra- To meet these engineering requirements for both ice-
verse routes and drilling targets will be pre-selected by inte- cutting and coring, several types of drilling systems were con-
gration of surface imagery and subglacial geophysics (radar, sidered, including hot-water drills, coiled tube drills, tethered
acoustics, magnetics, gravity, etc.). Initial core characteriza- electromechanical drills and jointed-pipe rotary drills.
tion will be done off-site, whereas borehole logging will be Advantages and disadvantages of each approach are sum-
done on-site both immediately after drilling and in follow- marized in Table 1. Based on considerations of capability,
on expeditions to capped boreholes. cutting rate, robustness, ease of use, ability to repair in the
Figure 1 shows the anticipated area of operations for the field, energy efficiency, length of core and cost, we
RAID drilling system. RAID’s initial focus will be in East adopted a conventional mineral industry-type rotary drilling
Antarctica, in consideration of the scientific questions out- system using jointed hollow drill pipe for fluid circulation
lined above. RAID will be wintered and staged from the US and wireline coring, as described in the section below.
research station at South Pole, and it will launch from there
each season on traverse with sufficient supplies of consum-
ables to drill 5–6 boreholes per season. 4. RAID DESIGN
The design for RAID was developed jointly by the authors with
an engineering team led by Chris Delahunty of DOSECC
3. ENGINEERING REQUIREMENTS Exploration Services (DES) in Salt Lake City, Utah. Members
Based on the general science goals outlined above, a series of of the design team also included Gary Clow (US Geological
more specific technical requirements was defined in consult- Survey), Arnold Law (Machine Engineering, LLC), and Chad
ation with the Ice Drilling Design and Operations (IDDO) Clarke, Dan McClellan, Dennis Nielson and Philippe Wyffels
office in Madison, Wisconsin and other consulting engineers. (all of DES).
The resulting technical requirements adopted for RAID are Principal design specifications of the drilling equipment
listed in Box 2. Specific considerations were given to and parameters of operation are listed in Table 2.
achieve a balance of mobility, fast drilling rates, minimizing
borehole volume, limitation with frozen conditions, effi-
ciency of coring, minimizing drilling crews, energy effi- 4.1. General outline of components
ciency, environmental stewardship, ability to withstand the As shown in Figure 2, the RAID drilling system is designed to
severe Antarctic environment and providing for post-drilling penetrate three sections of the ice sheet – porous firn, non-
access in a clean, stable, vertical borehole. Despite this large porous glacial ice and a basal section consisting of deep

Fig. 1. Maps of Antarctica showing (a) ice velocity derived from satellite interferometry (from Rignot and others, 2011) and (b) sub-ice surface
elevations (from BEDMAP2; Fretwell and others, 2013). In (a), black lines show major ice divides; white circles show existing ice cores, with
depth of penetration and age of ice record; white outlines show major subglacial lakes. In (b), area of high seismic velocity anomalies at 150
km depth attributed to fast cratonic lithosphere (dashed white line) from Ritzwoller and others (2001). Area of high topography in East
Antarctica (magenta dashed line) from Wilson and others (2011). Nimrod igneous province, Terre Adélie craton and Neoproterozoic rift
margin from Goodge and Finn (2010). White box labeled RAID shows area initially targeted for rapid-access drilling. A, Dome A; C,
Dome C; F, Dome Fuji; M, McMurdo Station; MR, Miller Range; RI, Ross Island; SP, South Pole; T, Titan Dome. Glaciers: BdG,
Beardmore; ByG, Byrd; NG, Nimrod; ScG, Scott.

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
1052 Goodge and Severinghaus: Rapid Access Ice Drill

Table 1. Summary of various methods employed for deep-ice


Box 2. RAID technical requirements. drilling

Method Advantages Disadvantages


(1) Produce 2500–3300 m borehole to base of
Hot water drill • Makes a quick • Energy intensive
ice quickly (≤200 hours) borehole
(2) Minimize borehole diameter (<10 cm) to • Big fuel requirement
minimize fluid volumes • Freezes closed
quickly
(3) Drilling only in dry, frozen-bed conditions • Does not core rock
(no ‘clean access’) or ice
Coiled tube drill • Simple to use • Bulky
(4) Retrieve short ice cores (∼50 cm long) at • Off the shelf • Expensive
depth (capture old ice) • Embrittlement and
(5) Sample bed interface and retrieve ≥25 m of fatigue
• Coil not repairable
bedrock cores (>3.5 cm diameter)
Wireline electromechan- • Lightweight • Slow cutting ice
(6) Modified diamond-drilling system equipped ical drill • Well-known • Only short cores
with drilling-fluid recirculation, ice chip- history • Does not core rock
removal and chip disposal systems easily
Jointed-pipe rotary drill • Well-known • Not yet proven in
(7) Deployable as traverse-capable, stand-alone history Antarctica
system • Good torque
and lift
(8) Minimum staff for around-the-clock drilling • Good for rock
operations (two 3-person crews, <8?) core
(9) Clean borehole to remain open for ice- • Field repairable
logging for up to 5 a with pressure-
compensating fluid
(10) Drilling fluid will be non-freezing; non-ice-
reactive (‘hydrophobic’); density similar to
water ice (0.92–0.93 g cm−3); transparent, it efficiently and minimize supply. The upper firn section
with refractive index similar to that of water will be cut by the drilling rig using 7.5 inch (19 cm)-diameter
ice augers and then cased with 4.5 inch (11.4 cm) outer
ice (e.g. ESTISOL 140)
diameter (O.D.) steel or composite casing pipe. Casing
(11) All components capable of operation at high pipe will be sealed at the bottom against non-porous
elevation (up to 4000 m AMSL) and cold air glacial ice by use of an inflatable rubber packer in the
temperature (down to −40°C) shape of a torus, through which drill pipe can be inserted.
(12) Borehole will deviate ≤10° from vertical A packer enables fluid overpressure in the borehole to be
maintained without leaks into the porous firn, and resists
both upward and downward forces imparted to the casing
by fluid pressure or movement of the drill string. This fluid
overpressure in the annulus is crucial during deep drilling
ice, glacial bed materials (e.g., till) and bedrock below. The to compensate for viscous pressure losses during fluid circu-
corresponding drilling sections are divided into stages for in- lation, in order to prevent warm ice from closing in on the
stallation of firn casing, cutting an ice borehole and coring of drill pipe in the deepest part of the hole. The RAID packer
all solid materials near the base of the ice sheet. In order to is an industry-standard 7 inch (17.8 cm) O.D. model rated
drill each of these three sections in sequence, the principal to 600 psi (4.1 × 106 Pa) of inflation pressure and can be
design elements of the RAID drilling system include: (1) a inflated by any fluid. Tests in ice indicate that air is the best
diamond drilling rig, modified to fit inside a traversable medium for inflating the packer to a desired pressure of
module; (2) a pipe rack, for storage and delivery of auger 400 psi (2.8 × 106 Pa) in order to prevent leakage and slip-
flights, casing pipe and drill rods to the rig; (3) diesel power page. A deep 3.5 inch (8.9 cm)-diameter borehole will then
generators; (4) a mechanical shop and inventory module; be cut in the ice by rotating NRQ size drill rods (2.75
(5) a custom-designed fluid recirculation system; (6) metal- inches, or 7.0 cm, O.D., in 10 m rod lengths) equipped
pipe casing and an inflatable packer unit to make a fluid- with tungsten-carbide or hardened-steel bits. A diverter
tight connection through porous firn between the drill rig bolted to the top of the casing with a gasket flange has an
and impermeable glacial ice below; and (7) a wireline-de- inlet that allows the drilling fluid to be pumped downward
ployable bottom-hole diamond drilling and coring assembly within the annulus between the casing and the drill rods
capable of retrieving ice, sediment and rock cores. These (reverse circulation), then down the annulus between the
functions are housed in five modularized and sled-equipped ice borehole wall and drill rods, and finally to pass across
ISO-shipping container-type units. the bit face in order to flush ice cuttings up through the
The main drilling components at the surface consist of a center of the drill rods. Drilling fluid will be circulated by
modified rotary drilling rig operating in flooded reverse circu- pumps on the drilling rig and pass through a series of mech-
lation for removal of cuttings and a fluid recirculation system anical, gravity and melting-coalescing stages to separate ice
custom-designed to separate ice-cuttings from the drilling from drilling fluid before it is recycled into the borehole.
fluid and recycle the fluid into the borehole in order to use RAID will use ESTISOL 140 as the drilling fluid (see below).

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
Goodge and Severinghaus: Rapid Access Ice Drill 1053

Table 2. Summary of RAID design specifications and operating parameters.*

Value Units Notes

Technical specifications
Module weights
Drill module 58 000 (26 300) lbs (kg) Fabricated flat rack
Rod module 48 000 (21 800) lbs (kg) Fabricated flat rack
Power module 40 000 (18 100) lbs (kg) Modified ISO container
Fluid recirculation module 36 000 (16 300) lbs (kg) Modified ISO container
Shop module 36 000 (16 300) lbs (kg) Modified ISO container
Boart Longyear rotary drilling rig LF230†
Generator capacity (2) 500 kW Caterpillar C18
Electric prime mover capacity 300 Hp Baldor
Fluid pump maximum capacity 36 (134) gpm (lpm) FMC Bean pump
Drilling fluid ESTISOL 140
Air compressor capacity 250 (7080) cfm (lpm) Ingersoll Rand
Air lift tubing (O.D.) 0.75 (1.9) in (cm) Aluminum rod with check valve
Drill rod length 30 (9) ft (m) Heat-treated steel alloy, NRQ thread
Drill rod (O.D.), NRQ 2.75 (7.0) in (cm)
Drill rod (I.D.), NRQ 2.4 (6.0) in (cm)
Ice auger (O.D.) 7.5 (19.1) in (cm)
Firn casing (O.D.), HWT 4.5 (11.4) in (cm) Steel alloy
Borehole packer (O.D.) 7 (17.8) in (cm)
Ice-cutting outer bits (O.D.) 3.5 (8.9) in (cm) Tungsten carbide blades
Ice-cutting outer bits (I.D.) 2.2 (5.6) in (cm)
Ice-cutting face-centered bits (O.D.) 2.2 (5.6) in (cm) Tungsten carbide blades
Reaming shells (O.D.) 3.5 (8.9) in (cm) Diamond impregnated steel alloy
Bottom-hole assembly (O.D.) 3.5 (8.9) in (cm) steel alloy
Bottom-hole assembly (I.D.) 2.2 (5.6) in (cm)
Diamond coring bit (O.D.) 2.2 (5.6) in (cm) Impregnated diamond cutters
Diamond coring bit (I.D.) 1.5 (3.8) in (cm)
Core barrel (O.D.) 2.2 (5.6) in (cm)
Core barrel length 10 (3) ft (m)
Operating conditions
Borehole diameter 3.5 (8.9) in (cm)
Maximum borehole depth 3300 m
Drill rotation rate 400–500 rpm
Fluid circulation rate 25 (95) gpm (lpm)
Penetration rate 2.5–3.0 m min−1
Rod cycle rate ∼5 min
Fluid volume (per 3300 m hole) 5400 (20 400) gal (liters)
Crew size (to operate) 3

* HWT, standard flush-joint casing size (4.0 in I.D., 4.5 in O.D.); I.D., inner diameter; ISO, International Standards Organization; NRQ, standard diamond drill
pipe size (2.38 in I.D., 2.75 in O.D); O.D., outer diameter.
† See Boart Longyear LF230 data sheets.

Ice, bed and bedrock cores (1.5–1.9 inch, or 3.8–4.8 cm, per field season. RAID is designed to be logistically
diameter) will be retrieved into core barrels using a wire- autonomous.
line-deployable bottom-hole assembly (BHA) equipped
with thin-kerf diamond rotary bits. This BHA fits within the
drill rods and so can be deployed without pulling the drill 4.2. Drilling rig and drill-rod modules
string prior to coring. The entire operation of cutting a bore- The centerpiece of the RAID design is the drilling rig itself.
hole and retrieving core will be completed with only one trip After consideration of commercially available rigs, we iden-
of the main drill string to depths of 2500–3300 m, significant- tified the Boart Longyear model LF230 as the best choice for
ly minimizing total time at each drill site. To the extent pos- the RAID system. Manufacturer specifications for this coring
sible, the RAID drilling system uses off-the-shelf, industry- drill are available at http://www.boartlongyear.com/drilling-
standard components; in many cases, however, individual equipment/surface-coring/lf230/. This rig has multiple
components were custom designed or sized for appropriate advantages: (1) appropriate power, torque and lift capacity
application in the RAID system. Key components of the (22.7 ton pullback, or 20 593 kg); (2) adaptable for normal
RAID system are detailed below. and reverse circulation drilling; (3) up to 9 m rod pull; (4)
Field deployment of the RAID drilling system in Antarctica simple, hydraulic chuck drive; (5) uses industry-standard
is shown schematically in Figure 3. The system consists of drill pipe, bits, and casing; (6) suitable for wireline coring;
five main drilling modules, all containerized and towable (7) compact design and skid-mountable; (8) manual leveling
over the ice cap, plus supporting equipment and berthing capability; (9) convertible to an electric-over-hydraulic prime
for a minimum complement of drilling staff and all the con- mover; (10) operable by a 3-person drilling crew; (11) factory
sumables required for traversing and drilling up to six sites engineered to operate at −40°C; and (12) readily available

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
1054 Goodge and Severinghaus: Rapid Access Ice Drill

Fig. 2. Schematic diagram showing the main elements of the RAID design using a conventional rotary drilling rig operating in flooded reverse
circulation mode in jointed hollow drill pipe. The RAID system involves three stages of drilling and coring, divided here into casing, borehole
and coring sections (a–c). Firn casing is capped at the surface and sealed in non-porous ice by an inflatable packer in order to maintain
borehole fluid pressure. The ice borehole will be made with hardened ice-cutting bits in a reverse fluid circulation mode in order to
evacuate cuttings. Coring will be done with a wire line BHA using thin-kerf diamond drill bits in a normal fluid circulation format.

on the commercial market. The RAID drilling rig has been with an auger trolley that allows the drill crew to move
modified with a 300 HP electric motor running hydraulics hollow-stem auger sections to the front of the pipe rack
in place of a diesel engine, along with soft-start capability skid with little effort. The drill rig and drill-rod modules
provided by an AC solid-state motor control, which are outfitted with hydraulic leveling legs and will be sup-
decreases the weight of the system, provides greater energy ported by rig mats in the field to reduce ground pressure.
efficiency, and provides for greater ease of use in the When deployed, the drilling rig and drill-rod modules
Antarctic environment. will be joined by a fixed platform and the drilling crew
The drilling rig and drill-rod rack modules were custom- work area will be covered by a woven fabric canopy for
built from cold-rated C-channel steel, bolted to form two environmental protection (Fig. 4). The canopy is light
45 ft (13.7 m) and 40 ft (12.2 m), respectively, ‘flat racks’ enough that the hydraulic rams of the drill mast can lift it
that are mountable on sleds and equipped with retractable into place, but durable enough to resist snagging and
vinyl-coated woven fabric side and top curtains for access wind; it is designed to withstand wind loads of 80 mph
during drilling operations. The drill-rod rack is equipped (36 m s−1).

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
Goodge and Severinghaus: Rapid Access Ice Drill 1055

a screen-shaker unit used to separate ice chips and recover


drilling fluid. The larger warm room contains tanks for
melting ice cuttings, coalescing drilling fluid, collecting
waste water and returning filtered fluid to the cold-room
supply. The warm room also houses pumps and filters; a
large-capacity compressor used for maintenance as well as
delivering air to the borehole during air lift operations; a
boiler unit for warming the melting tank; a programmable
logic control interface to monitor temperatures, fluid levels
and pressures; an electrical cabinet and motor control
center and space heater. During drilling operations, fluid is
Fig. 3. Field layout for RAID (schematic and approximately to scale), provided to the supply tanks in the cold room from an exter-
including five main drilling modules (brown). Tower shows location nal supply in flexible bladders and then pumped into the
of drill rig platform. Not shown are hoses and wiring to connect borehole (blue fluid paths in Fig. 6). Fluid returning from
drilling components, fuel bladders, camp facilities, tractors and the borehole contains ice cuttings and is introduced across
other equipment. Drill pipe rack can hold up to 3500 m of drill the screen-shaker in the cold room, which mechanically
rod, depending on rod diameter. Drilling fluid and fuel will be separates fluid from ice on two sloping screens of coarse
supplied in flexible bladders.
and fine mesh size, vibrating by an eccentric cam. Shop
and field tests of the shaker indicate that we can achieve
∼90% recovery of pure fluid from this step alone. Fluid
4.3. Fluid recirculation system passes through the screens and into a return tank below.
A custom-designed fluid recirculation system was designed Mostly-dry ice cuttings then fall off the shaker screens, set
for RAID to move fluid and ice cuttings between the across a pass-through into the warm room and into the
surface fluid supply reservoirs, the wellhead and the bore- melting tank.
hole (Fig. 5). It is a closed-loop system capable of both A closed-loop warm fluid line from the boiler, coupled
normal and reverse circulation. The fluid recirculation with waste heat captured from the power generators, pro-
system itself houses all of the equipment needed to prime vides energy to melt the remaining ice (red fluid paths in
the borehole with fresh drilling fluid, separate ice cuttings Fig. 6). Because ESTISOL is an oil-based, water-insoluble
from the drilling fluid and filter the fluid for recycling into fluid that floats on liquid water, the two-phase fluid is
the borehole (Fig. 6). We modified a standard 40 ft (12.2 m) pumped to a coalescer tank where ESTISOL is skimmed off
Hi-Cube ISO container by dividing it into cold and warm the water and captured in a fluid return tank below. Waste
rooms to accommodate a two-stage separation process. water from melting of ice is virtually free of drilling fluid
The cold room, designed to remain at ambient conditions, and periodically purged to the outside. The two-stage
contains fluid storage and supply tanks, pumps, filters and process of separating ice and drilling fluid, combining

Fig. 4. Field deployment of drill and rod modules on sleds. Drill rig (background) and drill-rod racks are joined by a work platform and
covered by a canopy of reinforced fabric.

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
1056 Goodge and Severinghaus: Rapid Access Ice Drill

Fig. 5. Generalized schematic diagram illustrating the closed-loop fluid recirculation system that connects the surface fluid reservoirs with the
wellhead and borehole. Details of the fluid-processing module are shown in Figure 6.

mechanical and melting-coalescing steps, is highly effective basic workbench with machine tools and welding equipment
and capable of keeping up with the maximum drilling rates for field repairs. All five RAID modules are outfitted for fire-
achieved by the LF230 drill. suppression, consisting of an ABC dry chemical system oper-
able in both automatic and manual modes. Fire detection is
possible by thermal sensors, linear detection wire, infrared,
4.4. Other modules push-button and remote controls, and the system is con-
Other modules include the drill-rod rack skid, built in the nected to a main fire control panel at the drill station oper-
same configuration as the drilling rig skid, and power and ation interface.
shop modules each fitted-out in 40 ft (12.2 m) ISO contain-
ers. The drill-rod skid includes space for all the necessary
drill rods, augers and casing pipe to drill through 150 m of 4.5. Tooling
firn and 3300 m of ice. It includes a hoist and trolley The combined drilling and coring requirements of the RAID
system for moving and lifting drilling components. Power is system while operating at depths up to 3300 m and cutting
provided to the RAID equipment from a central generator through different materials mandated a unique solution.
module containing twin Caterpillar C- 18 500 kW diesel gen- RAID uses a BHA consisting of an outer ice-cutting bit and
erators. The generators are redundant and typically only one tubes that remain in the borehole at all times with the drill
is required for all drilling and support operations. Power is rods (Fig. 7a). The BHA attaches to the outer bit and is in
distributed to the other modules through an elevated cable line with the drill rods; it is the chambering device for both
system that is assembled at each drilling site. A ventilation the non-coring assembly used in ice cutting and the inner
system allows for control of temperature within the generator coring assembly. Either a face-centered ice-cutting bit or
module in both automatic and manual modes. The shop coring tools are inserted in and removed from the BHA by
module is configured with ample storage for drill bits, wireline. This allows us to change from drilling to coring
bottom-hole tooling, spare parts, and consumables and a without pulling the entire drill string. From bottom to top,

Fig. 6. Simplified schematic diagram of fluid recirculation system (FRS) shown to scale as built out in a 40 × 9.5 ft (12.2 × 2.9 m) Hi-Cube ISO
container. FRS is divided by a partition wall into unheated and heated spaces (cold and warm rooms, respectively). Blue lines show general
path of drilling fluid; magenta lines show warm fluid circulation loop. Not shown: electrical panels, power distribution, fire suppression,
lighting, gauges and readouts and other minor components.

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
Goodge and Severinghaus: Rapid Access Ice Drill 1057

downward momentum of the inner tools when the landing


shoulder contacts the landing ring. Ice-cutting outer bits are
available in both hardened steel and tungsten carbide
formats. We have also designed bits with cutters of different
materials such as high-speed steel, carbide and diamond that
will allow us to drill through ice and expose diamond cutters
if contact is made with hard materials such as an entrained
glacial boulder or compacted till. The second-stage non-
coring assembly is a wire-line retrievable inner barrel with
a second face-centered bit (Fig. 7b). It consists of the inner
ice-cutting bit, landing shoulder, spacer tube and latch
head. This tool is used for drilling operations without taking
core samples. It is the crux of the RAID concept and is
designed to penetrate the ice sheet as quickly as possible,
allowing cuttings and drill fluid to pass through its inner
diameter. This tool, along with the design of the outer
barrel, allows a drill crew to drill ahead to a designated
depth and then, with the wire line, retrieve the non-coring as-
sembly in order to sample ice, transition of the ice/bedrock,
bedrock and afterwards redeploy the non-coring assembly
if needed. A third bit is used to core ice, glacial bed materials
and rock (Fig. 7c). It is patterned after a standard mining in-
dustry hard-rock bit, with different configurations to handle
ice, till, cobbles and rock. This bit has as thin a kerf as pos-
sible in order to allow passage through the BHA bit and re-
trieve the largest possible diameter core (∼1.5 inch, or 3.8
cm, diameter).
RAID uses custom-designed ‘running’ and ‘pulling’ tools
to deliver and retrieve the inner barrel from the BHA.
Designs of the latch head and the running and pulling tools
are based on designs used in the oil industry and for
marine scientific drilling; they are positive locking devices
that prevent the inner barrel from disconnecting. Because
the drilling fluid is less viscous than typical water-based
muds, the inner barrel cannot be dropped inside the rods
and allowed to free fall; these tools are deployed in and
out of the drill string via a 3/16 inch (0.5 cm) swaged wire
rope that is spooled by the wire line winch of the LF230
Fig. 7. Schematic diagrams showing bottom-hole tools, including: drill rig.
(a) non-coring bottom-hole assembly (BHA), with reaming shell
A custom-designed coring assembly will be used to take
and outer ice-cutting bit; (b) face-centered bit for cutting ice,
latched into position within the BHA; (c) diamond coring bit,
spot ice cores, drill through the boundary zone and glacial
substituted by removing the inner ice-cutting bit and latching in bed, and into bedrock. The coring assembly protrudes from
on wire line; and (d) a sequence of coring steps showing the BHA in 1.5 and 3 m increments, or multiples thereof.
progressive advance of the coring bit and core barrel with To recover 25 m of core, the coring assembly first latches
extensions as needed. Core barrels are available in 1.5 and 3 m into the BHA, advances by rotation of the drill string, collects
lengths. Not to actual scale. Not shown are inner landing ring, up to 3 m of core and then is retrieved by the pulling tool
latching mechanisms for vertical and rotational locking and (Fig. 7d); after core is removed from the barrel, additional
pulling tools. increments of core will be taken by adding extensions to
the core barrel and the tool is run to the bottom to begin
another section of coring. Coring rods are designed in 3 m
the BHA consists of the outer bit, landing ring, outer core lengths of B size (2.2 inch, or 5.6 cm, O.D.). Coring con-
barrel, rotational driver coupling, vertical locking coupling, tinues in this incremental fashion, with the BHA moving up
reaming shell and adapter coupling. The locking coupling and down within the previously drilled borehole enough to
hosts the latch head that attaches to the inner core barrel. advance the coring assembly, until the desired amount of
Separate reaming shells can be used to help centralize the core is recovered with successive trips of the wire line.
drill string and condition the borehole.
The RAID system has three primary drill bits used in the
ice drilling and coring sections of the hole. The outer bit, 4.6. Key design innovations
which is the primary cutting mechanism through the ice, Since completion of an initial feasibility study undertaken in
has a 3.5 inch (8.9 cm) O.D. If required, the bit diameter collaboration with IDDO (Gerasimoff, 2012), which identi-
can be increased and will not adversely affect drilling of fied a jointed-pipe rotary drill as the most appropriate tech-
the hole; however, doing so will increase the drilling fluid nology for this application, subsequent design work
requirements. The outer bit is ∼20 cm long and houses the completed by DES and the RAID scientific team has resulted
landing ring, a hardened piece of steel designed to stop in the following key design features and innovations:

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
1058 Goodge and Severinghaus: Rapid Access Ice Drill

(1) Flooded reverse fluid circulation. A key element in the fluid required for multiple holes while traversing and
RAID design is use of a flooded reverse-circulation to minimize the total amount of fluid used in keeping
mode of drilling. In reverse circulation, the drilling with environmental stewardship, RAID must continu-
fluid is pumped downward along the annulus on the ously recirculate drilling fluid, remove ice cuttings and
outside of the drill pipe and returned along with cuttings recycle fluid without substantially warming ice in the
upward through the middle of the drilling pipe (Fig. 8). borehole. We designed a containerized fluid recircula-
This method was adopted in order to maximize the tion system consisting of a series of tanks and pumps
diameter of ice and rock cores (requiring a larger that is capable of moving fluid through the borehole
inner diameter (I.D.) drill rod), while at the same time and separating the fluid-ice mixture in a two-stage
minimizing the risk of clogging by ice chips in the process involving both mechanical screening and
narrow, outer annulus. The RAID reverse circulation melting/coalescing stages, as described above (Fig. 6).
system has been designed to maximize flow to (3) Narrow-wall drill rods. To save on weight of the drill
achieve rapid borehole cutting. In field tests conducted string at depths between 2000 and 3300 m, we will
in North America, we achieved ice-cutting rates of 2.5– employ custom steel drill rods consisting of a narrow-
3.0 m min−1. During rock coring, however, the drilling wall mid-body section fitted with standard Boart
system will be returned to normal mode, in which fine Longyear-type threaded box-and-pin end joints. We
rock cuttings are lifted up the outer annulus and a considered composite drill rods consisting of an alumi-
high flow rate provides adequate cooling and lubrica- num mid-body fitted to steel end joints because alumi-
tion at the cutting surface. num provides advantages of lighter weight yet greater
(2) Custom mechanical/coalescing fluid recirculation tensile strength at cold temperatures. However, con-
system. Perhaps the most challenging and innovative trasting thermal expansion of steel and aluminum
part of the RAID design is the fluid recirculation raised concerns about the viability of the metal joints
system. Because of the need to carry all of the drilling at low temperatures in Antarctica.

Fig. 8. Schematic diagram showing the upper portion of the drill string from the surface down to non-porous ice. Fluid circulates from the
borehole to the fluid recirculation module via the drill-pipe swivel and diverter at the surface. Firn casing is sealed below within non-
porous ice by use of an inflatable packer, through which the drill string penetrates. Fast ice cutting is made possible by use of flooded
reverse circulation, in which drilling fluid flows downward within the annulus surrounding the drill rods, passes over the cutting face and
then carries ice cuttings away up the inside of the drill rods (inset).

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
Goodge and Severinghaus: Rapid Access Ice Drill 1059

(4) Custom rod rack for inventory and driller operation. A (8) Wire line bottom-hole assembly. To reach deep levels in
custom-designed rod rack is included with the RAID the ice and retrieve ice and rock cores on a rapid time-
design. It is built on a bolted steel rack like that used frame, the RAID design consists of a BHA into which
for the drilling rig, and it includes a sliding trolley for ice-cutting and coring tools can be deployed on wire
auger flights, racks for casing pipe and drill rods, retract- line. After reaching the base of the ice sheet, removal
able vinyl side curtains and top cover, and a modular of a detachable inner ice-cutting bit will allow us to
catwalk. It is capable of carrying up to 3500 m of drill insert a wire line coring system that will latch into the
rods. This unit, when mounted on skis, will be con- outer drill pipe and advance behind a diamond coring
nected to the drilling rig platform by a modular deck bit. Such a wire line system will allow us to take the
to create a workspace for ease of rod handling to and required cores without tripping drill pipe, saving consid-
from the drilling rig (Fig. 4). erable time while on site. For coring, sections of core
(5) Airlift. To enhance the ability of the fluid circulation barrel and an attached coring bit are lowered into the
system to maintain flow and appropriate pressure com- drill string via a dedicated wire-line winch located in
pensation during making of the deepest parts of the the drill module and mechanically latched to the BHA
borehole, an air-lift system will be employed. In this upon landing (Fig. 7). Positive latching provides both
standard oil-field and rock drilling practice, compressed vertical and rotational coupling between the coring
air is injected into the inside of the upper ∼60–150 m of tools and the bottom-hole assembly. Once coupled to
the drill pipe to reduce the overall density of the the drill string, the inner core barrel and coring bit
upward-flowing fluid-ice mixture. The resulting in- move in synchronous rotation with the drill string,
crease in its buoyancy augments the driving force for which is rotated by the drilling rig. The coring bit
fluid circulation, overcoming frictional pressure losses advances by weight-on-bit, while the outer ice-coring
and thus ensuring a rapid flow rate of the drilling bit remains at the same level in the ice borehole.
fluid. Use of an air-lift system will also help maintain Once a coring section is completed, the inner core
the desired fluid pressure compensation in the deeper, barrel is lifted on wire line to the surface, core
warmer parts of the borehole, thereby reducing the like- removed, a core barrel extension is added and the
lihood of warm, ductile ice ‘ballooning’ into a cavity in process is repeated.
response to fluid overpressure. The air-lift process and (9) Environmental canopy. We designed a removable
fluid pressure compensation are discussed separately fabric canopy that can be hoisted up the drill mast
below. and guyed out to anchors, making a taut tent-like
(6) Augering of firn. It is necessary to case the upper cover to protect the rig and drilling crew from the
∼130 m of the borehole passing through the porous Antarctic elements. It is designed for quick rig-up and
and permeable firn in order to prevent loss of pressur- rig-down (<1 hour), and also to minimize wind loading.
ized fluid during drilling. The borehole in firn will be (10) Heat-efficient design. To the extent possible, we have
larger diameter (7.5 in, or 19.1 cm) and cased with designed the RAID system with heat-exchange capabil-
steel pipe (4.5 in, or 11.4 cm). We have elected to ity in order to recover as much waste heat as possible for
make this larger-diameter hole for the casing with con- use elsewhere, and, likewise, for efficient cooling using
ventional ice augers deployed by the LF230 drill rig ambient air temperatures. For example, excess heat
because augers are fast, energy efficient, compact, from power generation will be used to melt the ice
proven in similar settings (e.g., South Pole), and chips during fluid recovery, whereas a heat-pump
exploit the rig’s high torque capability. Other options concept will be applied to chill this fluid before it is
were considered, such as a hot water drill, impact re-injected into the borehole.
driver, or a rotary air (RAM) drill, but these were dis- (11) Containerized subsystems. Each of the main compo-
carded as too costly in terms of fuel consumption, nents are designed to fit within standard-dimension
larger compressor requirements, greater pumping/ ISO containers and/or flat racks of similar dimension.
lifting requirements and possible damage to casing sec- These containers are designed to fit on either skis or in-
tions. The RAID system will use a light soil auger bor- flatable pontoons for over-snow traversing. They will be
rowed from the geotechnical industry, with a 7.5″ fitted with leveling, hydraulic, control and heating
(19.1 cm) O.D. bit appropriate for cutting ice. After systems, fluid pumps, catwalks, insulation and retract-
augering a firn borehole to accommodate casing pipe, able side and top curtains. The containerized systems
and once casing is set and a seal is created in non- are designed to be strong and weatherproof, yet
porous ice with a packer, the ice-cutting process will provide ready access to the drilling crews.
begin using the RAID rig with the conventional drill (12) Arctic ratings for components. All critical components
rods. will have industry-grade Arctic ratings to reduce the
(7) Inflatable packer. To seal the base of the casing against risk of failure in Antarctic conditions. Arctic-rated
non-porous ice (at ∼130 m depth), we will use an inflat- equipment will include power equipment, motors,
able casing ‘packer’ with a flexible rubber membrane fluids, seals, hoses, steel, fire safety equipment and elec-
that is inflated to seal against solid ice. This industry- tric wire jacketing.
standard packer has an outside diameter of 7 inches
(17.8 cm) and can be fitted with spikes or studs to
ensure good coupling against back-pressure from the
borehole fluid. The packer performed as expected in a
recent test at the firn-ice transition near McMurdo 4.7. Drilling fluid
Station, making a leak-tight seal when inflated with air The choice of drilling fluid affects the design in numerous
to a pressure of 350 psig (2.4 MPa). ways, such as compatibility with elastomer seals, the fluid

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
1060 Goodge and Severinghaus: Rapid Access Ice Drill

viscosity’s impact on the permissible width of the annulus borehole pressure and frictional pressure loss (based on the
and the fluid density’s impact on the required fluid level for Darcy–Weisbach equation) that we constructed for this
long-term borehole stabilization. For this reason, we purpose.
decided to choose a drilling fluid early in the design Briefly, the model is steady state and starts with ice
process. A wide range of fluids was considered, including density, ice velocity and temperature profiles computed
n-butyl acetate, silicone oil, and refined derivatives of kero- from a modified Herron and Langway (1980) firn densifica-
sene such as ISOPAR-K. Our search was heavily influenced tion model, a Dansgaard and Johnsen (1969) 1-D ice flow
by the experience of the ice-coring community in identifying model, and a 1-D advection-diffusion heat flow model
a replacement for the halocarbon HCFC-141b, which has (Fig. 9). The model takes as inputs surface temperature,
been phased out by the Montreal Protocol to protect atmos- snow accumulation rate, geothermal heat flux at the ice/
pheric ozone. Borrowing on pioneering work by Danish rock interface and ice thickness. Temperature-dependent
scientists in successful ice-coring operations in Greenland density and viscosity of ESTISOL were computed and used
and Antarctica, we decided at an early stage to adopt as inputs to the Darcy–Weisbach equation to predict fluid
ESTISOL 140 as the drilling fluid for RAID (Sheldon and pressure as a function of depth (Fig. 10).
others, 2014). This fluid has all of the desired properties Note that a major source of uncertainty in the calculation
listed in the technical requirements above, satisfying the stems from the position of the drill pipe in the borehole – if it
needs for low viscosity at low temperature, drill lubrication, is centered, pressure losses are approximately twice as severe
ice-chip flotation, borehole pressure stabilization, optical as if the pipe lays on the wall (Piercy and others, 1933).
quality, safety, modest cost and environmental suitability. Experienced drillers report that pipe generally lays on the
wall (C. Delahunty, personal communication, 2013). To
some extent the risk of hole closure can be mitigated by over-
4.8. Air-lift process pressuring the fluid at the surface injection point, but this
For the air-lift process, 60 m of 3/4 in (1.9 cm) diameter alu- pressure must not exceed the hydrofracture strength of
minum rods are inserted into the drill rods and secured to polar glacial ice, which we found to be 190 psig (1.3 MPa)
a swivel designed for air lift using positive-locking quick- in −17°C ice during a recent test near McMurdo Station at
disconnects. The air-lift rods are run into the drill string the firn-ice transition. It is expected that the fracture strength
one section at a time and a check valve is used to create of ice will be greater at the colder temperatures of the
neutral buoyancy. During drilling, compressed air is injected Antarctic Plateau (−50°C), but no tests have been done at
into the aluminum rods and adjusted as needed. A check lower temperature to our knowledge.
valve at the bottom prevents back-flow of drilling fluid. The opposite risk, of ‘ballooning’ the borehole in warm
Maximum airlift capability is achieved at a depth of ∼400 soft ice, occurs when fluid circulation is stopped and the
fbs (121 mbs). To add more drill rod, the air-lift rods are fluid pressure returns to its static value (Fig. 10). Due to the
detached and then reconnected to resume drilling using the fact that the firn is less dense than ESTISOL 140, the static
following procedure. pressure is always overpressured with respect to the ice
At the end of a drill run (9 m), flow is stopped and the drill while the fluid column extends all the way to the surface.
rods are secured in the foot clamp and chuck. The swivel is After drilling, the fluid level will be lowered to closely
unthreaded from the drill rods and pulled up to expose the balance the borehole pressure with the ice hydrostatic pres-
air-lift tube connection, and the neutrally-buoyant air-lift sure in the warm soft ice, to prevent borehole deformation.
rods are disconnected. The swivel is attached to a new rod This will be accomplished by evacuating ESTISOL in the
from the rod rack and pulled up over the drill head. The borehole to a level below the packer by pumping air to the
air-lift rod is then manually inserted upward into the sus- diverter, thereby forcing drilling fluid upward within drill
pended drill rod until it connects with a coupler at the base rods to the fluid recirculation system for recovery. After re-
of the swivel. Once a positive connection is made, the drill moving the drill rods, the packer will be deflated and
rods above are threaded to the rods in the chuck. Flow of removed along with the primary casing. To prepare the bore-
ESTISOL and air is resumed and drilling proceeds. holes for future down-hole observation, new plastic casing
will be installed to the packer depth, capped and back-
filled with snow to seal the annular space. Calculations
4.9. Borehole pressure considerations show that the final fluid level needed for long-term borehole
The central concept of RAID is to keep the logistical footprint stabilization will be near the firn-ice transition.
small and nimble, which translates directly to keeping the
borehole diameter as small as possible due to the fact that
the volume of drilling fluid required increases as the square 5. MODE OF OPERATION
of the borehole diameter. For example, a 3.5 inch (8.9 cm) Once it is fully tested and deployed, the RAID drilling plat-
diameter borehole to a depth of 3300 m will require 5400 form will become a community asset within the US
gallons (20 440 l) of fluid, whereas a 7 inch (17.8 cm) diam- Antarctic Program, with field operational management and
eter borehole requires >21 000 gallons (79 500 l) of fluid. maintenance to be provided by the University of
However, as the borehole diameter becomes smaller, fric- Minnesota-Duluth. During sustained science operations,
tional pressure losses in the moving fluid increase. This pres- RAID will operate by traversing from McMurdo Station to
sure loss makes it increasingly difficult to maintain adequate field sites in East Antarctica, visit multiple drill sites and
borehole pressure during drilling, which is necessary to return to South Pole and/or McMurdo for winter-over.
prevent the ice from closing in on the drill pipe and stopping South Pole is a likely permanent logistics hub for the RAID
fluid circulation. For this reason, we engaged in a lengthy op- platform because it is a major operational base on the ice
timization process, iterating between engineers and scientists cap that provides a machine shop, repair facility, medical
on the design team, informed by a fluid-mechanical model of staff, regular flights to and from McMurdo and is the inland

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
Goodge and Severinghaus: Rapid Access Ice Drill 1061

Fig. 9. Modeled steady-state temperature and velocity profiles at an East Antarctic plateau RAID site. Ice thickness is assumed to be 3000 m,
geothermal heat flux of 50 mW m−2, mean annual surface temperature of −55°C and snow accumulation rate of 3 cm a−1 of water
equivalent.

destination of over-ice traverses with heavy-lift capability. The for the winter to make any needed repairs/modifications
rig and support equipment will be transported to South Pole and prepare equipment for the next season’s work.
by a combination of over-ice traverse vehicles and airlift. To the extent possible, the RAID system is designed to be
RAID traverses will depart South Pole each austral summer lightweight, compact, weather tight, energy efficient and op-
for continuous drilling operations at individual sites on the erable by a small crew. It will be mobile and autonomous
polar ice cap, then return to South Pole and/or McMurdo (Fig. 3), consisting of modularized and traversable

Fig. 10. Modeled dynamic pressure losses for a typical RAID hole, expressed as the difference between fluid pressure and ice hydrostatic
pressure. Thus, a negative value indicates that the borehole will tend to close. During operations, the surface injection pump (Bean pump)
and/or the airlift will be used to compensate for the differences shown here. Static curve shows pressure differences when fluid is not
flowing. Assumptions: 30 gal min−1 (113.6 l/min−1) fluid flow; 3.5 in (8.9 cm) hole diameter; 2.75 in (7.0 cm) pipe O.D.; 0.0057 m wall
roughness; Darcy–Weisbach formulation; Re >2300 (turbulent); 50 mW m−2 geothermal flux; −55°C mean annual surface temperature;
2 cm/a w.e. snow accumulation; ESTISOL 140 drilling fluid.

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
1062 Goodge and Severinghaus: Rapid Access Ice Drill

components that will be towed in series by tractors to carry


all structures and materiel required for berthing, supply and Box 3. RAID operational sequence.
drilling. Minor consumable supplies, spare parts and person-
nel exchanges will be transported to and from the platform by
light fixed-wing aircraft not requiring a groomed ski-way. (1) Traverse safely to the drilling site with
Any major equipment will be transported to South Pole by tractors and sleds
fixed-wing or traverse vehicle. Because of its mobility and (2) Prepare the drilling site (snow leveling and
small footprint, RAID is not designed as a logistics hub for
compacting)
other projects.
For use as a research instrument, the targeting of drilling (3) Set up RAID system (laying out rig mats,
sites and subsequent access to the boreholes for down-hole positioning system over mats, lining up
observation are an important part of achieving the interdis- containers, connect all components,
ciplinary goals established for RAID. The acquisition of air- assemble components at the connection of
borne and over-snow geophysical imaging (ice-penetrating the rig and rod racks, raise canopy, etc.)
radar, aeromagnetics and aerogravity) is crucial for recon- (4) Power up and making all utility connections
naissance mapping of potential targets of old ice and subgla-
(5) Rig up drilling mast
cial geology. Reconnaissance geophysical mapping will
therefore provide critical input for sensible site selection for (6) Auger the firn
RAID drilling, as well as for site safety surveys to determine (7) Install casing, packer, and wellhead, then
subglacial conditions of ice thickness, basal layer compos- pressurize the hole
ition and presence of water. A site-selection committee will
(8) Drill ice borehole to near bed
review suggestions for future drilling sites based on scientific
priorities and site characteristics. Borehole logging, both in (9) Retrieve short ice cores
reconnaissance fashion at the time of drilling and for (10) Borehole video inspection and hole bottom
detailed, high-resolution records after drilling is complete, temperature measurement
is a key part of making RAID boreholes available as a re-
(11) Penetrate bed if ice is below freezing point
search observatory. Borehole data acquisition will include
and retrieve rock cores
optical logging of ice stratigraphy, ice crystallographic an-
isotropy, borehole deformation, temperature profiles, basal (12) Pull drill string out
heat flow and bedrock orientation and in-situ stress. By bot- (13) Borehole optical logging; measurement of
toming in bedrock, RAID also has potential for long-term pressure, temperature, diameter and shape
deep deployment of geophysical instrumentation.
(14) Rig down the system and prepare to
Field drilling operations will normally take place in the
mobilize
general sequence listed in Box 3. A 12–15-person crew
will travel with the drilling system. Personnel will consist of (15) Stabilize borehole with drilling fluid
two or three 3-person drilling crews in order to maintain dril- (16) Mobilize and traverse to next site(s)
ling operations for at least 16 hours d−1. Each drilling crew (17) Redeployment to fixed base for
will consist of a principal driller and two assistants, all
winterization
under the direction of a Lead Driller. In addition to the
drilling crews, the field team will include a mechanic, a
field coordinator (responsible for general camp duties, com-
munications, weather observations, etc.) and science staff completed in early 2015 in the mountains near Bear Lake,
(responsible for receiving and handling samples, as well as Utah. Since then, additional fabrication and testing contin-
general camp duties). All of the crew members will partici- ued through 2015, capped by integration and validation
pate in day-to-day operations, including driving of the
traverse vehicles. At least one crew member will be a certi-
fied medical first-responder or emergency medical Table 3. Design, construction and deployment schedule
technician.
2012 Phase 1 engineering and design study funded
2013 Drilling system design work begins
6. PROGRESS AND STATUS 2014 Final design report issued
RAID development is divided into three phases, with major Phase 2 construction and testing funded
milestones of the project as listed in Table 3. Phase 1 entailed Construction, fabrication and testing of key systems
begins
completion of a comprehensive design for an integrated dril-
2015 North American winter test at high elevation (Utah)
ling system, including buildable engineering diagrams, completed
testing and deployment plans, and a detailed budget and Continued fabrication, integration and validation tests
construction schedule. Design of RAID began in March, Commissioning and readiness for Antarctic field trials
2013 and was completed by December that year. Delivery to Pt. Hueneme and vessel shipment to
Phase 2 of the project entails construction, assembly and McMurdo Station
testing of the RAID drilling platform in North America, fol- 2016/17 Antarctic field trials in McMurdo area
2018/19 Traverse to South Pole and plateau field trials
lowed by field trials in Antarctica and staging for future scien-
2019/20 RAID platform available for scientific drilling via South
tific operation on the East Antarctic ice sheet. Construction of Pole (Phase 3)
the RAID system began in August 2014. Our first integrated
field tests of the drill and fluid recirculation system were Note: items in italics are planned.

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
Goodge and Severinghaus: Rapid Access Ice Drill 1063

testing in Salt Lake City from August to November 2015. The air temperature. We were able to meet these requirements
completed drilling system was transported to California for because of the combined capabilities of the drilling rig and
vessel loading and shipment to Antarctica in late 2015. effectiveness of the fluid recirculation system to keep pace
After off-loading in early 2016 and winterization, the rig with the production of ice cuttings. The main parameters
will be deployed for field trials in the 2016/17 austral field that have a direct effect on penetration rate are: rotation
season in order to validate its operational readiness for speed (rpm) of the drill head; flow rate (gpm) of the fluid cir-
future science drilling (Phase 3). culation system; the capacity of the fluid recirculation system
to process debris and ice cuttings and return a clean drilling
fluid; pressure exerted on the borehole to maintain the fluid
6.1. North American test flow required; and cutting capacity of the drill bit. All drill
In early 2015, we completed a system-level field test of the bit configurations worked as expected, and we experienced
RAID drilling system in Utah (North American Test, NAT), very even cutting and uniform fluid pressures in zones of
which demonstrated the ability of RAID to drill through ice clear, well-formed ice; similar cutting performance is
and take core with its principal components consisting of expected in homogeneous Antarctic ice. Rotation rates
the drilling rig, fluid recirculation system and bottom-hole as- during drilling were varied from 200 to 600 rpm, but we
sembly. A site in the mountains of Utah was chosen because found that an ideal performance was achieved at 400–500
of historically cold temperatures, high elevation, low terres- rpm and pumping ESTISOL at 20–25 gal min−1 (75–95 l
trial heat flow and proximity to the DES facilities in Salt min−1, about half the maximum rate anticipated), thereby
Lake City. All components of the RAID system functioned significantly reducing flow rate through the fluid recircula-
successfully as designed, and we demonstrated the capability tion system. The BHA worked as expected and rock-coring
of the drilling rig and fluid recirculation system to drill ice and system yielded recovery of short cement cores at the base
take core in cold-weather, high-altitude field conditions. In of the casing. The main functions yet to be tested include
support of the field tests completed in Utah, we also under- boosting our maximum cutting rates (up to 3 m min−1) and
took a comprehensive set of bench tests and computational use of the air-lift system to manage fluid circulation in deep
fluid dynamics modeling studies that validate key compo- boreholes, both of which require deployment of the system
nents of the RAID system and the drilling process. to Antarctica. At deeper levels planned for Antarctica,
In order to test the drilling and fluid-processing functions greater weight on bit should support optimal cutting rates.
of RAID in an environment that is as close as practical to Once a drilling routine was established at the NAT, we
that expected in Antarctica, we first designed and implemen- achieved a cycle time for 9 m long drill rods of ≤5 min,
ted a unique cryogenically-cooled drilling test facility to which supports drilling to a depth of 3300 m in <48 hours.
make a column of ice by freezing water with liquid CO2.
This method was implemented at a test facility at an elevation
of 1824 m near Bear Lake, Utah, in early 2015. As summar- 6.2. Antarctic field trials (AFT)
ized by Nielson and others (2015, in review), the general We are currently planning a set of AFT for the 2016/17 austral
design of the NAT well consisted of a 10.75 inch (27.3 cm) summer in order to validate our operational plan, evaluate
outer casing cemented in a hole to a depth of 152 m. full integration of the drilling system in a deep-ice setting
Within that casing, we hung a 5.5 inch (14.0 cm) casing and learn from drilling operations in order to fully prepare
string within which a column of ice was formed by circulat- for science drilling as an autonomous, traverse-capable
ing a refrigerant in the annulus between the 5.5 and 10.75 system. Antarctica is the only place to effectively integrate
inch casings. A thermistor string was installed in the the entire drilling system and evaluate the capability of
annular space between the two casing strings to monitor tem- those components designed for operation in thick firn and
peratures at 15 m intervals. We used liquid CO2 as a refriger- ice. In order to prove out the operational capacity of the
ant because it exists as a multi-phase material to low RAID system, the goals for our proposed field trial include
temperatures (triple point of −57°C at 5.1 atm, or 5.2 × traversing over snow, site set-up, augering of firn and instal-
105 Pa) and it is easily circulated, inexpensive and readily lation of casing, drilling through thick ice, retrieving ice and
available. In order to minimize the likelihood of the casing rock cores, rigging down, stabilizing the borehole and rede-
splitting due to the volume increase associated with freezing ploying to a base station. The AFT will be conducted in the
water, the hole was cooled first and then ice was formed in McMurdo Station operational area at a site of thick, grounded
increments from the bottom upward. Refrigeration of the ice in order to take advantage of the established US Antarctic
ice column yielded down-hole temperatures of −20 to Program transport and logistics system, thereby reducing risk,
−30°C to a depth of 137 m. cost and footprint in Antarctica. This approach represents the
During the NAT, we successfully demonstrated most of most logical, logistically light and cost-effective way to
the technical requirements for RAID, including: (a) borehole evaluate the full operational capability of the RAID system.
penetration rates of up to 2.3 m min−1 (design limit of the
LF230 rig), which corresponds to <24 hours to cut 3300 m
not including drill rod cycling; (b) cutting a continuous 3.5 7. SUMMARY
inch (8.9 cm) borehole; (c) successful operation of the drilling We are designing, fabricating and testing a new RAID for use
fluid recirculation system for ice chip removal and chip dis- on the ice sheets of Antarctica. Our goal is to rapidly drill to
posal at borehole temperatures similar to those we will en- deep ice (drilling penetration up to 3300 m depth), followed
counter in Antarctica; (d) taking cores of ice and ‘rock’ by coring of ice, ice-sheet bed interface, and bedrock sub-
(represented by cement) using the bottom-hole coring assem- strate below. This new technology will provide a critical
bly; (e) mobility of the containerized modules; (f) operation of first look at the interface between major ice caps and their
the drilling system with a crew of three; and (g) effective use subglacial geology. As a mobile system, RAID offers direct
of ESTISOL 140 as a drilling fluid at high elevation and cold access to deep ice, glacial bed and subglacial geology at

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.
1064 Goodge and Severinghaus: Rapid Access Ice Drill

multiple sites and leaves behind a 3-D array of legacy bore- DeConto RM and Pollard D (2003) Rapid Cenozoic glaciation of
holes. RAID is unique because it can provide fast borehole Antarctica induced by declining atmospheric CO2. Nature,
access through thick ice; take short ice cores for paleoclimate 421, 245–249 (doi: 10.1038/nature01290)
study; sample the glacial bed to determine ice-flow condi- Fischer H and 29 others (2013) Where to find 1.5 million yr old ice
for the IPICS “Oldest-Ice” ice core. Clim. Past, 9, 2489–2505
tions; take cores of subglacial bedrock for age dating and
(doi: 10.5194/cp-9–2489-2013)
crustal history; rapidly date the ice via optical logging; and
Fretwell P and 59 others (2013) Bedmap2: improved ice bed, surface
create boreholes for use as an observatory in the ice sheets. and thickness datasets for Antarctica. Cryosphere, 7, 375–393
The RAID drilling platform will thus give the scientific com- (doi: 10.5194/tc-7-375-2013)
munity access to a rich record of geologic and climatic Gerasimoff MD (2012) Prospectus for a Rapid Access Ice Drill: A
change on a variety of timescales, from the billion-year drilling system equipped for rapid transit of glacial ice, equipped
rock record to thousand-year ice and climate histories. As for on-the-fly ice coring and subglacial rock coring, and suitable
such, RAID is interdisciplinary and will allow access to for regional geological mapping and glaciology. Ice Drilling
polar paleoclimate records in ice >1 Ma to probe the Design and Operations report, University of Wisconsin,
cause of the mid-Pleistocene transition, permit direct obser- Madison, Wisconsin, 57 pp
vation at the base of the ice sheets and enable recovery of Goodge JW and Finn CA (2010) Glimpses of East Antarctica:
Aeromagnetic and satellite magnetic view from the central
rock cores from the ice-covered East Antarctic craton to
Transantarctic Mountains of East Antarctica. J. Geophys. Res.,
study its geotectonic evolution. This novel drilling technol- 115, B09103 (doi: 10.1029/2009JB006890)
ogy will thus provide an entirely new way to obtain in situ Goodge J and 8 others (2011) RAID: Rapid Access Ice Drilling. Ice
measurements and samples of ice, glacial bed and rock for Drilling Program Office Workshop Report, Herndon, Virginia,
interdisciplinary studies in geology, glaciology, paleo- April 15–16, 3 pp
climate, microbiology and astrophysics. Harley SL, Fitzsimons ICW and Zhao Y (2013) Antarctica and super-
continent evolution: historical perspectives, recent advances and
unresolved issues. In Harley SL, Fitzsimons ICW and Zhao Y, eds.
ACKNOWLEGEMENTS Antarctica and supercontinent evolution, vol. 383. Geological
We thank the staff of DOSECC Exploration Services, LLC, the Society, Special Publications, London, 1–34 (doi: 10.1144/
principal contractor for the design-build process of RAID de- SP383.9)
velopment. We are particularly grateful for the efforts of Chris Herron MM and Langway CC, J. (1980) Firn densification: an empir-
ical model. J. Glaciol., 25, 373–385
Delahunty, lead engineer on the project, along with Chad
Lisiecki L and Raymo M (2007) Plio–Pleistocene climate evolution:
Clarke, John Eckels, Dan McClellan, Dennis Nielson and
trends and transitions in glacial cycle dynamics. Quat. Sci. Rev.,
Philippe Wyffels. The RAID design team also included 26, 56–69 (doi: 10.1016/j.quascirev.2006.09.005)
Gary Clow and Arnold Law. Mary Albert, Alfred Eustes, Nielson DL, Delahunty C, Goodge J and Severinghaus JP (2015)
Michael Gerasimoff and Jay Thiessen provided valuable Facility for testing ice drills. Sci. Drill., in review
insight and encouragement during the concept scoping Piercy NAV, Hooper MS and Winny HF (1933) Viscous flow through
phase, and Steffen Bo Hansen provided a review of the com- pipes with core. Philos. Mag., 15, 647–676 (doi: 10.1080/
pleted conceptual design. Steffen Bo Hansen measured the 14786443309462212)
ESTISOL 140 viscosity at Antarctic temperatures and gener- Raymo ME, Lisiecki LE and Nisancioglu KH (2006) Plio-Pleistocene
ously shared the data with us. We appreciate input from ice volume, Antarctic climate, and the global δ18O record.
IDDO engineers Chris Gibson, Jay Johnson, and Tanner Science, 313, 492–495 (doi: 10.1126/science.1123296)
Rignot E, Mouginot J and Scheuchl B (2011) Ice flow of the
Kuhl, and help with validation by Frank Rack. John Rashid
Antarctic ice sheet. Science, 333, 1427–1430 (doi: 10.1126/
and Blaise Stephanus have capably guided the project science.1208336)
management. Matthew Kippenhan has provided excellent Ritzwoller MH, Shapiro NM, Levshin AL and Leahy GM (2001)
support in the design and operational support planning. Crustal and upper mantle structure beneath Antarctica and sur-
The RAID development project is supported by the Division rounding oceans. J. Geophys. Res., 106, 30,645–30,670 (doi:
of Polar Programs at the US National Science Foundation 10.1029/2001JB000179)
with awards to Goodge (1242027 and 1419935) and Sheldon SG, Popp TJ, Hansen SB and Steffensen JP (2014) Promising
Severinghaus (1242049 and 1419979). We thank two an- new borehole liquids for ice-core drilling on the East Antarctic
onymous reviewers for their helpful recommendations. high plateau. Ann. Glaciol., 55(68), 260–270 (doi: 10.3189/
2014AoG68A043)
Van Liefferinge B and Pattyn F (2013) Using ice-flow models to
REFERENCES evaluate potential sites of million year-old ice in Antarctica.
Augustine NR and 11 others (2012) More and better science in Clim. Past, 9, 2335–2345 (doi: 10.5194/cp-9–2335-2013)
Antarctica through increased logistical effectiveness. U.S. Wilson DS and 5 others (2011) Antarctic topography at the Eocene–
Office of Science and Technology Policy and the National Oligocene boundary. Palaeogeogr. Palaeoclimatol. Palaeoecol.
Science Foundation, Washington DC, 28 pp 335–6, 24–34 (doi: 10.1016/j.palaeo.2011.05.028)
Clow GD and Koci B (2002) A fast mechanical-access drill for polar Zachos JC, Quinn TM and Salamy K (1996) High resolution (104
glaciology, paleoclimatology, geology, tectonics, and biology. yr) deep-sea foraminiferal stable isotope time series.
Mem. Natl. Inst. Polar Res., 56, 5–37 Paleoceanography, 11, 251–266 (doi: 10.1029/96PA00571)
Dansgaard W and Johnsen SJ (1969) A flow model and a time scale Zapol WM and 17 others (2011) Future science opportunities in
for the ice core from Camp Century, Greenland. J. Glaciol., 8, Antarctica and the Southern Ocean. National Research
215–223 Council, National Academies Press, Washington, D.C., 195 pp

MS received 24 January 2016 and accepted in revised form 15 July 2016; first published online 9 September 2016

Downloaded from https://www.cambridge.org/core. 26 Dec 2020 at 23:16:10, subject to the Cambridge Core terms of use.

You might also like