Mambuaya Bamboo Presentation
Mambuaya Bamboo Presentation
About
Rationale
About
Thus, the Environmental Protection Committee finds it strategic
to partner with the LGU of Mambuaya in a Cultivation and
Enterprise Development of Bamboo Products Project.
Project Design
Rationale
Products
About
Barangay
Mambuaya
Rationale
Timeline
Products
Budget
About
impede production of bamboo products. In addition,
population growth put pressure on natural resources.
Poverty level in the area is above the national average
and for most people in the mountain regions, small-
scale agriculture is the only source of income.
Project Design
Rationale
Timeline
Products
Budget
About
However, intensive cultivation and burning contribute
largely to declining land productivity in the uplands
through accelerated soil erosion and diminishing soil
fertility.
The inability to effectively address the increasing rate of
deforestation and benefit the rural poor in the country has
led towards a new paradigm in forest management and
governance called “community forestry” or “participatory
Project Design
forestry”.
Rationale
Timeline
Products
Budget
About
At its core are the values of participation, social justice,
and equity reflecting the need for a more equitable
distribution of benefits in tropical forest management
(Rebugio, et al).
Due to the overexploitation of natural forests and the
increasing demand for woody material, bamboo is gaining
importance as a substitute resource material for timber.
Bamboo is a fast-growing woody grass. It is not only
Project Design
used in construction, furniture making, handicrafts, etc
Rationale
Timeline
Products
Budget
About
but also in watersheds for soil erosion control, and
cleanses the air we breathe by releasing more oxygen
and sequester more carbon dioxide than other forest
products.
Sustainable bamboo development is through an
integrated approach to economic and social
development and environmental protection.
Project Design
Rationale
Timeline
Products
About
living conditions and resource use continue to meet
human needs without undermining the ‘integrity,
stability and beauty’ of the natural biotic system.
There is an existing Bamboo Plantation situated at
Barangay Mambuaya which has a total area of 246
hectares and only 84.5 hectares (35%) are planted by
Mambuaya Integrated Social Forestry Farmers
Project Design
Association (MISFFA) since 1996.
Rationale
Timeline
Products
Budget
About
They (MISFFA) want to produce and introduce more
products but is limited by lack of capital and processing
equipment. Moreover, the limited number of equipment is
only usufruct from DTI and anytime can be taken back.
The existing project has two (2) components, these are
the Plantation and the other is the Production (shop).
Production started in 2017 under the Shared Service
Project Design
Facility (usufruct with DTI) and produced bamboo slats
Rationale
Timeline
Products
Budget
About
Bamboo products: school chairs & desks, armed chair,
table, parquet (floor tiles), etc.
The shop is operated by iBamboo Corporation
(private) under the trade name of Ang Bamboo ni
Dong.
Project Design
The proposed venture is to utilize the existing
Rationale
Timeline
Products
Budget
About
support the new Production Shop which will be put up
thru Global Grant funding.
Budget
Timeline
Products
BAMBOO LIFE CYCLE – FROM PLANTING TO PROCESSING
Project Design
Rationale
About
Project Design
1.Bamboo cuttings at nursery 2.Bamboo Planting
Rationale
Timeline
Products
Budget
About
3.Bamboo Maintenance 4.Bamboo Harvesting
BAMBOO PLANTATION
1.Bamboo Cutting 2.Kiln drying 3.Bamboo Knot Removal
Project Design
Rationale
Timeline
Products
Budget
About
4.Bamboo Splitting 5.Bamboo Planing 6.Glue application
Products
Project Design
Rationale
About
Budget
Timeline
Products
Project Design
Rationale
About
Budget
Timeline
Products
Project Design
Rationale
About
Budget
Timeline
Products
Project Design
Rationale
About
Budget
Timeline
Products
Project Design
Rationale
About
Budget
Timeline
Products
Project Design
Rationale
About
NOV 16 ~DEC 31
Conduct of Techno-
2014 economic study
2 NOV 1 ~ 15
More data gathering
Project Design
and conduct of CNA
Rationale
Timeline
Products
Budget
About
OCT 1 ~ 31
Data gathering
SEPT 1 ~ 30
Site inspection and
Characterization
JULY 1 ~ AUG 31
Problem
identification,
Meetings, etc
PROJECT BUDGET
Category Description Supplier Cost in PHP Cost in USD
Project Design
Equipment Circular saw, kiln To be determined
Rationale
Products
Timeline
drier, knot remover,
About
splitter, planer, etc.
Labor Labor, including to be determined
government taxes
Contingencies, Labor & materials, To be determined
etc. signage, etc
Management fee Local transport, etc. To be determined