STEEL QUANTITY FOR 375m COMPOUND WALL

length of
SPACING in WEIGHT OF 1 mtr TOTAL
S.NO. BAR NAME BAR SHAPE DIA in mm NOS bar in REMARKS
mm BAR in kg WEIGHT kg
mtrs

for footing 2'6"*2'6" 105nos 0.1 m 0.1 m


0.1 m 0.1 m
0.72m
0.180m
0.72m
0

1 Main bar 0.180m 2.630m .0 8


0.180m 105*6 150 0.92 0.395 228.94 cover -50mm for both sides
5
0
m

0.3m
0.180m
0.100m
0
.
0.180m 0
5
0.180m
0
m

2 distribution bar 0.100m 8 105*6 150 0.92 0.395 228.70 cover -50mm for both sides

for columns 9"*9"

3 column bar upto top 10 105*4 - 2.93 0.617 759.28

25mm for side cover for each


4 stirrups for columns 8 105*14 200 0.82 0.395 475.62
side

for plinth beam 9"*6"

5 top bar for plinth beam 8 2 - 375 0.395 296.25

bottom bar for plinth


6 beam 10 2 - 375 0.617 462.75

25mm for side cover for each


7 stirrups for plinth beam 8 2501 150 0.66 0.395 652.01
side

Total weight of steel


total wt.of 8mm dia bars 1881.52
addition of 10% steel for over lapping and
bending 188.15

grand wt.of 8mm dia bars in kgs 2069.67

total wt.of 10mm dia bars 1222.03


addition of 10% steel bending 122.20302
grand wt.of 10 mm dia bars in kgs 1344.23
CONCRETE QUNTITY FOR 2KM DRAIN
S.NO
nos Length in m width in m thickness in m
earthwork for footings 2'6"*2'6" 105 0.9 0.9 1.0
1 PCC (1:4:8) 105 0.9 0.9 0.1
2 M15 grade bottom Raft slab 105 0.762 0.762 0.3
3 columns upto G.L 105 0.23 0.23 0.3
4 plinth beam 0 375 0.15 0.23
5 columns upto top level 105 0.23 0.23 1.524
6 bricks for 1 span 1 3.2 0.15 1.524
7 plastering in sq.m 2 375 1.524
plastering in sq.m on top side 1 375 0.15

total concrete qty


quanity in cu.m
85.050
8.505
18.290
1.666
12.938
8.465
0.732
1143.000
56.250

49.824 179367.3
labour charge for 375 m compound wall
s.no description qty in sq.m qty in sq.ft cost per sq.ft
1 for pcc and raft concrete ( including 60.968 656.194 120
reinforcement)
for column, plinth beam and brick
2 work( including reinforcement) 685.5 7378.0365 80
for plastring on both sides 571.5 6151.0545 40
3
for plastring on top sides 56.25 605.41875 40
total labour cost
all
total cost
₹ 78,743.339

₹ 590,242.920
₹ 246,042.180
₹ 24,216.750
₹ 939,245.189