it depend on labour cost, omo onile factor and ready availability of money.
e.g
1000 blocks of 6 inches @ 130 = #130, 000. but d truth is d blocks made these days are
knock-offs.
alternatively,
if you mould yourself.
2 trips of sand @ 18000each = 36000 ( a trip moulds more dan 15 bags of cements ).
20 bags of cement @ 1500 = 30000.
1 bag = 50 blocks.
labour is 600 per bag = 16000
water 2000
total = 84,000. & sand for about over 10bags of cement still left.