1) Measured LEL, H2S, CO contents with multi gas detector around the cellar area. Found 0. 2) Well head pressure was recorded 500 psi after opened the needle valve and D section well head gate valves 1 & 2. 3) Started bleed- off by opening the gates valves from D section well head and external bleed off gate valve. 4) Well head pressure was dropped to 200psi. 5) Stopped bleeding operation by close the gates valves from D section well head and external bleed off gate valve. 6) Closed gate valves from D- section well head related to pressure gauge. 7) Rainy water was accumulating inside the cellar pit. Needs dewatering.
Site Visitors: Mr. Behra, Mr. Bhinay Prasad, Mr. D.S.Reddy and Mr. BVRao