Labour rate

Sr.no Name of activity Unit per Rates


1 Excavation
a-Manual (life 3m) cu.m 217
b-Mechanical (life 1.5m) cu.m 102
2 PCC(M15) cu.m 1300
3 RCC(M20) cu.m 1923
4 Brick masonary cu.m 1400
5 Water proofing sq.m 89
6 Plastering and pointing sq.m 186
7 flooring sq.m 307
8 Wood finish sq.m 16
9 Oil painting sq.m 40
10 Wood work sq.m 143
11 Door and window sq.m 2612
12 Iron work sq.m 289
13 Plumbing per day 600
14 Electrification
a-Regular per point 70
b-conseled per point 150
15 Bar bender skilled per day 592
16 Welder/driller skilled per day 622
17 Mason per day 622
18 Total station operator per day 1560
19 Valuation expert per day 1890
20 surveyor per day 1075
21 Junior Engineer per day 1560
22 Senior engineer per day 2275