Professional Documents
Culture Documents
Brightstar Quito 05082020 (Blank)
Brightstar Quito 05082020 (Blank)
Equipment Details
** It is the responsibility of the technician to verify that we have correct times onsite by logging into the
Technician Portal upon closing this service ticket.
*Date *Travel Start Time *Time In *Time Out *Break Time
Part Details
Part Number Part Description Outbound Tracking *Return Tracking Returnable? (Yes/No)
** You are responsible for checking tracking and part availability before going to site. If it is not listed here please check
your portal for updated information.
** Please note all return tracking numbers should be updated in the BAM Technician Portal within 72 hours of closing.
** Returnable status can change based on the condition of the parts. All UNUSED or DOA parts are ALWAYS returnable.
I hereby acknowledge the performance of the above service event as being satisfactory and the equipment
has been left in good condition and/or repaired.
Customer Signature:
Customer Name(Print):
Date: