Professional Documents
Culture Documents
13850.00
0.90
SECOND FLOOR LINE
CEILING LINE
PROVISION OF
RAMP WITH SHED
4000.00
(SEE BLOW-UP
W W W DETAIL)
1 1 1
8000.00
CEILING LINE
3400.00
W W
5 5
G F E D C B A
23250.00
CONCRETE
WITH
PAINTING
1950.00 4100.00 4300.00 4300.00 4300.00 4300.00
FINISHED
CEILING LINE
PROVISION OF W W W W
RAMP WITH SHED 3 3 3 3
4000.00
(SEE BLOW-UP
DETAIL)
W W
2 2
8000.00
SECOND FLOOR LINE
CEILING LINE
3400.00
W W W W
5 5 5 5
W W
2 2
GROUND FLOOR LINE
PROJECT TITLE/LOCATION: SHEET CONTENTS: DRAFTED : REVIEWED: SUBMITTED : RECOMMENDED : APPROVED: SET NO.: SHEET NO.:
REPUBLIC OF THE PHILIPPINES NOEL E. ALKUINO
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ARCHITECT I
BOARD UP TEMPORARY FENCE LAYOUT PLAN
REGIONAL OFFICE CONSTRUCTION OF DA RFO-7 REGIONAL OFFICE
EMMAN REY J. QUIMSON NONATO M. PAYLADO MARIO M. MONTEJO, D.M., MNSA EDGAR B. TABACON, CESO IV 01 2
REGION VII PREPARED :
SOUTH ROAD PROPERTIES CEBU CITY D.A. COMPOUND, M. VELEZ ST., GUADALUPE, CEBU CITY ADRIAN REY B. PACHECO SECTION CHIEF, BRIDGES AND OTHER
PUBLIC WORKS DESIGN SECTION
CHIEF, PLANNING & DESIGN DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR A101.0 4
ENGINEER II
DATE: DATE: DATE: DATE: