Work Breakdown Structure

Project Name: Announcement System


Department: Hardware
Focus Area: Design and Implementation
Product/Process: Announcement System, Alarm

Prepared By
Document Owner(s) Project/Organization Role
Mr.Usman Sahibzada Announcement System/Hardware Manager

Project Closure Report Version Control


Version Date Author Change Description
th
1 7 Dec Usman Sahibzada Created document.

Confidential
54450942.docx
Last printed 4/6/2004 4:07:00 PM
Work Breakdown Structure

Work Breakdown Structure Purpose and Limitations

The announcement system is the system which has the functions to announce the messages
according to the situation.
The purpose of this worksheet is to:
 Identify the work to be done.
 Identify the types of resources required for the work.
 Develop estimates for each work element.
This worksheet does not address:
 Who will perform the work.
 When the work will be completed.

Confidential Page 2 12/8/2021


Work Breakdown Structure

Work Breakdown Structure Organization Chart

1.0
Announcement System

1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8


Prime Mission Product Platform Integration
Systems Eng/ Program Mgt
System Test & Evaluation Training Data Peculiar Support Equip Common Support Equip

1.1.1 1.1.2 1.1.3 1.5.1 1.5.2 1.5.3 1.8.1 1.8.2


Subsystem 1… (Specify
Automated
Names)
AnnouncementAutomated
ApplicationAnnouncement
Software System Software
Equipment Services Facilities Test & Measure Equip Support & Handling Equip

Confidential Page 3 12/8/2021


Work Breakdown Structure

Work Breakdown Structure Worksheet

Include
(Completion Estimated Skill
Work ID Work Name Description Criteria) Customer Asset Type Complexity Effort Required Dependency
1.0 Announcement Create an automated A fully functional Umer Ali Hardware High 40 days Software and 1.1 till 1.8
System announcement system. automated system. Integrable Harware
within various
systems
1.1 Prime Mission Integreable Platform Umer Ali Platform High 10 days Software and Project proposal
Product Announcement System independent Java independece Hardware
implementation teams
1.1.1 Subsystem 1… Hardware programing 8051 Umer Ali Hardware High 4 days Handware Project proposal
(Specify Names) and interfacing implementation Engr Team

1.1.2 Automated Platform independent Java based Umer Ali Reusable High 6 days Software Engr Project proposal
Announcement software platform software Team
Application independent high
Software level software

1.2 Systems Eng/ Integration of hardware Software control of Umer Ali NA High 2 days System Project proposal
Program Mgt and software hardware Engineer

1.3 Platform Integration Integration system Umer Ali NA High 3 days System 1.1 and 1.2
Engineer
Reusable test
1.4 System Test & Testing with various Complete data Umer Ali data Medium 2 days Quality 1.1,1.2,1.3
Evaluation data analysis with 100% Control and
accuracy Assurance

Confidential Page 4 12/8/2021


Work Breakdown Structure

Include
(Completion Estimated Skill
Work ID Work Name Description Criteria) Customer Asset Type Complexity Effort Required Dependency
1.5 Training Usage of the system Client satisfaction Umer Ali NA User 2 days Trainers 1.1 to 1.4
dependent
1.5.1 Equipment Hardware functionality Client satisfaction Umer Ali NA Easy 1 day Hardware 1.1 to 1.4
trainers
1.5.2 Services Advanced feature usage Client satisfaction Umer Ali NA Easy 1 day Trainers 1.1 to 1.4

1.5.3 Facilities Various integration Client satisfaction Umer Ali NA Easy 1 day Trainers 1.1 to 1.4
changes
1.6 Data User Manuals Comprehensive Umer Ali NA Easy 1 day Documentatio 1.3 , 1.4
Document n Dept
1.7 Peculiar Support Cables, technical Toolkit Umer Ali NA High 1 day Hardware 1.4
Equip manuals, backup file team
system
1.8 Common Support Diagnostic kit Diagnostic kit Umer Ali NA High 4 days Hardware 1.4
Equip team/
Procurement
1.8.1 Test & Measure User manuals and Diagnostic kit Umer Ali NA High 2 day Procurement 1.1 till 1.7
Equip troubleshoot data updation

1.8.2 Support & Handling Hardware replacement User manual Umer Ali NA High 2 days Procurement 1.1 till 1.8.1
Equip procedures updation

Confidential Page 5 12/8/2021