Professional Documents
Culture Documents
PUMP HOUSE
WELL
PROPOSED GREEN
AREA -02
TANK NAME DIAMETER (m) CAPACITY ( KL) BORE
LINE.
SIDE MARGIN
ROAD
PROPOSED
[F]
ROAD
HALL 3
ROAD
PROPOSED
MATURATION
PROPOSED
SPACE FOR FUTURE
EXPANSION
81
73B
PROPOSED GREEN
AREA -03 102. PUMP ROOM
EXISTING ROAD
79B 119
70B
Tank
EXISTING ROAD
104. STP
EXISTING ROAD
HALL 2
HALL 1
Existing Beds
Collection Tank Sludge Drying
SDB
MATURATION
Filtrate
Sump
MATURATION
PROPOSED ROAD
P1
IN LINE.
Tank
Extended Aeration
69 Air Pumps
Blowers Recirculation
70A 79A
SIDE MARG
Tank
Conventional Aeration Air
Blowers
Filter Feed
Pumps
MCC Room
95
MBBR
Clarifier
Flare Stack
Degasser
Lamella clarifier
9.00 MT
tank
sludge mixing flocculation
8
AGS MCC &
MGF
UF Unit shed UASB Reactor
Biogas
Blowers
Buffer Tank
Roof shad
93
CCT UF
Reject Tank Gas Holder
9.00 MT SIDE MARGIN LINE. 9.00 MT SIDE MARGIN LINE.
UF Product
Water Tank
94
EXISTING ROAD
PROPOSED GREEN 103.HAZARDOUS
EXISTING ROAD Dryer 27 AREA -03 MATERIAL &
spent silo
grain
PLASTIC SCRAP
68A HAZARDOUS
MATERIAL
Area :25.30
SCRAP
sq.m
EXTRA PLASTIC
SCRAP
Area :25.30 sq.m
COOLING
EXISTING ROAD
PROPOSED ROAD
TOWER malt
silo 77
82
[D]
58
EXISTING ROAD
73A
EXPANSION BREW HOUSE(A,B,C,&D)
SPACE FOR FUTURE GODOWN -
EMPTY BOTTLE 83
NEW LT FOR UNIT-I
D.G. SET ROOM
COMPRESSOR
SHED
TRANSFORMER
68B VCB
EXISTING ROAD
EXISTING ROAD
PROPOSED ROAD
EXISTING ROAD
ROAD
PACKING FINISHED GOODS
EXISTING ROAD
MATERIAL GODOWN
29 STORE
PROPOSED
28 72B PACKING MATERIAL
74 HT-5.50M & EMPTY BOTTLE
BELT EXISTING ROAD UNIT-II
COAL CONVEYOR GODOWN FOR
ROAD
PROPOSED ROAD 72A
flocculation tank
34
sludge mixing
Lamella clarifier
84
ROAD
PROPOSED
PROPOSED PARKING 35 76
36 85 86
EXISTING ROAD
PROPOSED
AREA -01 25A
WTP.
31 asphalt road
25B 37 32
33
38 CHILLING PLANT
78
FINISHED GOODS
43 DMW PLANT 87
79 39 41 42 ACID RINSER 88 Scotch
Storage
40 AREA Shed
89
PROPOSED ROAD
24 44
99.CHANGE ROOM 26 45 57
EXISTING ROAD
46
EXISTING ROAD
,CRESH & TOILETS PROPOSED HAND WASH
9 22 58
48 30
100.CANTEEN
KITCHEN AREA
Area :150.38sq.m
21B 47
23 21A20 53
59
ROAD
10 90
COAL STORAGE AREA 12 60
19
PROPOSED
DINNING AREA sq.m
Area :219.00
61
EXISTING ROAD
9.00 MT SIDE MARGIN
LINE. 17 18
HAND WASH
Lobby
Area :18.04sq.m
51
COOLER AREA
Area :12.30sq.m
Area :25.64sq.m
11 16 50 62
54 55
15
[G]
GENT'S TOILET
sq.m
TOILET Area :26.86
LADIES sq.m
Area :11.89
98.OHC
91
LADIES CHANGE
ROOM AREA
sq.m :
27.60
GENT'S CHANGE
ROOM
sq.m
13
63
ROOM
Area :122.64 ADDITINOL
PATIENT ROOM
CRESH
Area :
30.00 sq.m
HT-3.90M
WAITING AREA
52 56 92
A,B 64
D
x 1.35 TOILET
x 1.80
2.05 1.20 ROOM
DOCTOR
EXISTING ROAD
65
USL BONDED CUSTOM AREA 5 PROPOSED ROAD 97.SECURITY
ROAD
8 6 CABIN
4
PROPOSED
PROPOSED PARKING Visitor Waiting
:10.34 sq.m
Area
1.00 M WIDE
PASSAGE
AREA -02 CCTV Room
Area :12.32
sq.m
66
2
[E]
9.00 MT SIDE MARGIN
14 1 LINE. 96
ENTRANCE GATE 49 67 9.00 MT SIDE
MARGIN LINE.
EXISTING ROAD
EXISTING ROAD
EXISTING ROAD
MALT PLANT
LOCATION PLAN
DRYER SHED
SPENT GRAIN LOADING
MALT SILO
ROAD
MALT SILO PANEL ROOM
MALT UNLOADING SHED
MALT SILO