&
RRB
ARREA Al
GUCG _ BEIJINGURBAN CONSTRUCTION GROUP CO, LTD.
Ref. No.: 044/OOEL/MGC/ET/2021/BUCG Jun 24, 2021
To: OLIBIYA OTL ETHIOPIA LIMITED
ADDIS ABABA, P.O. BOX 3174
Res Construction Works of Morka-Gircha-Chencha Road Project
ICB No.: W/60/ICB/OC/GOE/2010 EFY
Subject: Order(Arbminch-chencha-Zada 33km and sodo +100km morka 044
Dear Sir/Madam,
Following the Contract Agreement for Petroleum Products Procurement of Ethiopia
Integrated Transport Program Phase Morka-Gircha-Chencha Road Project(AS-MGC-
DCHT-002) between your good company and our company, we Beijing Urban
Construction Group Company Limited (Ethiopian Branch) purchase following products,
please prepare and make available so that we can come to load soon.
No ‘Quantity
Name Specification Unit Remarks
+ (barrel )
____| DEOMAXDM 12 Ta one weeks supply to project site
1] eneine ot | 4a API CEA 15 208Lt drum inch+33KM chenehe-lisha camp )
hydraulic Th one weeks supply to project site
2 hydrol 68 15 208Lt drum :
oil Arbaminch+33KMchencha-lisha camp )
GEAROIL XHD Th one weeks supply to project site
3 | Gear oil 4 20811 drum ‘
85W140 GLS ‘Arbaminch+33KM chenchaclisha camp )
GEAROIL XHD Th one weeks supply to project site
4 | Gearoil 4 208Lt drum
80W90, Arbaminch+33KM chencha-lisha camp )
/Multi- Th one weeks supply to project site
5 | purpose Lubix EP3 15 180Lt drum | Arbaminch+33KM chencha-lisha camp )
grease
‘Your quick cooperation will be highly appreciated.
ing:
Tel: 0086-10-62091560 Fax:0086-
District, Beijing, PR.China
1091559 Web: warw hnes eam
1/2IRABRRARREAA
GUCG __ BEIINGURBAN CONSTRUCTION GROUP CO, LTD.
Beijing Urban Construction Group Co., Ltd. (Ethiopia Branch)
RHEE TELAT ER 1s Sak
taipingzhuang Road No.18, Haidian District, Beijing, PR.China 2/2
‘Te: one San Ee ae a ane