Professional Documents
Culture Documents
MANAGEMENT SYSTEM
DESIGN
Departemen Teknik Industri
What Design IE Do ?
Integrated System
Industrial System
(Manufacturing System)
Management Processes
Planning
Organizing
Actuating
Controlling
TI-1101 Pengantar Teknik Industri - 5
Management System Design
Departemen Teknik Industri
Planning
Objective
Organization Design
The Mechanisms Which Define the
Features of the Organization and Which
Serve to Link the Different Parts of the
Organization
Dimension of Organization
Design
• Centralization
The locus of decision making authority along the vertical dimension
• Formalization
Explicitness of expectation regarding work means and production
• Complexity
Number of different components or sub system in an organization
• Configuration
The shape of organization: Number of level and span of control
Configuration
(Number of Level) Mechanisms of Vertical
Integration
1 1 - Centralization
- Formalization
2 2A 2B 2C 2D 2C
Horizontal Complexity Vertical Complexity
(Differentiation) (Differentiation)
3 3A 3B 3C
Configuration
Span of Control
(Horizontal Integration)
Form of Design
• Simple Design
• Functional Design
• Divisional Design
• Conglomerate Design
• Hybrid Design
Basic Component
• Top Management
• Midle Management
• Technical Core
• Technical Support Staff
• Administratif Support Staff
Controlling
Yes
No
Feedback
TI-1101 Pengantar Teknik Industri - 12
Management System Design
Departemen Teknik Industri
Vertical Linkages
Corporate Strategy
Business Strategy
Functional Strategy
Operation/production Management
Management Level
Corporate/Business
Business/Functional
Operational
Time Frame
Corporate Strategy
Ansoff Strategy
N
E
W
MARKT. DEV DIVERSIVICATION
E
X
I
S
T
PENETRATION PROD. DEV
I
N
G
EXISTING NEW
Business Strategy
• Scope : SBU
• Objective : Competitiveness
• Performance : Market Share
• Formulation :
– Cost Leadership
– Differentiation
– Focus
Functional Strategy
Operation Strategy
• Scope : Production/operation
• Objective : Competitive Priority
• Performance :
– Quality
– Cost
– Delivery
– Flexibility
– Safety
COST
COGM ( % COGS ) 55 % 45 % 50%
ITO 41 x 52 x 50 x
FLEXIBILITY
Waktu untuk 10 bulan 6 bulan 8 bulan
mengenalkan produk baru
Waktu perubahan kapasitas 3 bulan 3 bulan 3 bulan
Operation Management
• Scope : Production/operation
• Objective : Efficiency
• Performance:
» Quality
» Cost
» Delivery
» Flexibility
Generalized Structure of
Management Control System
Objectives
Performance Modified
Criteria Performance Criteria
System
Operation
Performance Corrective
Evaluation Action
No No Yes
Yes
No Non Performance Yes Performance
Performance
Criteria Need
Criteria Met Justified ? Change?
? TI-1101 Pengantar Teknik Industri - 25
Management System Design