DOR COMMULATIVE SUMMARY

DURATION: 21.12.2019 TO 27.12.2019

Contractor Total Observations Open

SIL 0

BIL 0

B&R 0

PCTL 0

GCCPL 0

REIL 0

PCPIL 0

TOTAL 0 0
1
MARY
0.9

.2019
0.8

Close
0.7

0.6

0.5

0.4

0.3

0.2

0.1

0 0 0 0 0 0
0
SIL BIL B&R PCTL GCCPL REIL
0
Total Observations Open Close
0 0 0 0 0 0 0
CTL GCCPL REIL PCPIL TOTAL

rvations Open Close


DATE LOCATION CONTRACTOR

ESP-02 M/s.ESEPPL
APJL 2*800MW USCTPP GOD
HSE Daily Observation Statistics
TYPE OF
OBSERVATION UA/UC
OBSERVATION

Non standard carry bag,


may be which can cause
break and fell down to Material Handling UA
0mtr..
MW USCTPP GODDA
y Observation Statistics
COMPLIANCE
ACTION TAKEN
STATUS

Standard Bag provided on the Closed


same day.
Closed

Closed

Closed

Closed

Closed